Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals
ML20236U460
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/23/1998
From:
DETROIT EDISON CO.
To:
Shared Package
ML20236U459 List:
References
NUDOCS 9807300177
Download: ML20236U460 (2)


Text

_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ ___ _________ ___ __ _ _ - _ _ _ _ _ .

Attachment 2 to NRC-98-0117

(

ATTACIIMENT 2 I

PROPOSED TECliNICAL SPECIFICATION REVISED PAGES INCLUDED PAGES:

3/40-4 I

l 9807300177 980723 5 PDP ADOCK 05000341.

P PDR l

I i

TABLE 4.0.2-1 SURVEILLANCE TEST INTERVALS EXTENDED TO SEPTEMBER 14. 1998 l SURVEILLANCE REQUIREMENT DESCRIPTION 4.3.1.1, Table 4.3.1.1 1, Item 3 RPS Rx Steam Dome Press High cal.

4.3.1.1, Table 4.3.1.1 1, Item 4 RPS Rx Low Water Level - Level 3 cal 4.3.1.1, Table 4.3.1.1 1, Item 6 RPS Main Steam Line Radiation High cal 4.3.1.1, Table 4.3.1.1 1, Item 7 RPS Drywell Pressure High cal 4.3.1.3, Table 4.3.1.1 1, item 2.b APRM Flow Blased Thermal Power High 4.3.1.3, Table 4.3.1.1 1, Item 2.c APRM Fixed Neutron Flux - High 4.3.2.1, Table 4.3.2.1 1, Item 1.a.1 Pri Cont Isolation Actuation Rx Water Low Level 3 cal 4.3.2.1, Table 4.3.2.1 1, Item 1.s.2 Pri Cont Isolation Actuation Rx Water Low Level 2 cal 4.3.2.1, Table 4.3.2.1 1, Item 1.a.3 Pri Cont isolation Actuation Rx Water Low - Level 1 cal 4.3.2.1, Table 4.3.2.1 1, Item 1.b Pri Con

  • Isolation Actuation Drywell Press High cal 4.3.2.1, Table 4.3.2.1 1, item 1.c.1 Pri Cont Isolation Actuation Main Steam Line Radiation High cal 4.3.2.1, Table 4.3.2.1 1, Item 1.c.2 Pri Cont Isolation Actuation Main Steam Line Press Low cal 4.3.2.1, Table 4.3.2.1 1, Item 1.c.3 Pri Cont Isolation Actuation Main Steam Line Flow High cal 4.3.2.1, Table 4.3.2.1 1, item 1.d Pri Cont Isolation Actuation Main Steam Line Tunnel Temp. High cal 4.3.2.1, Table 4.3.2.1 1, Item 1.e Pri Cont isolation Actuation Condenser Press High cal 4.3.2.1, Table 5.3.2.1 1, Item 1.f Pri Cont Isolation Actuation Turbine Bldg. Area Temp. High cal 4.3.2.1, Table 4.3.2.1 1, Item 1.h Pri cont Isolation Actuation Manual Initiation Functional 4.3.2.1, Table 4.3.2.1 1, Item 2.d RWCU SLCS initiation channel functional test 4.3.2.1, Table 4.3.2.1 1, item 2.e RWCU Isolation Rx Water Low Level - Level 2 channel cal 4.3.2.1, Table 4.3.2.1 1, item 5.a RHR S/D Cooling Rx Water Level Low - Level 3 cal 4.3.2.1, Table 4.3.2.1 1, item 5.c RHR $/D Cooling Rx manual initiation functional test 4.3.2.1 Table 4.3.2.1 1, Item 6.b Sec. Cont. Isolation Drywell Press High channel cal 4.3.3.1, Table 4.3.3.1-1, Item 1.b CS Drywell Press High Cat 4.3.3.1, Table 4.3.3.1 1, Item 2.b LPCI Drywell Press High Cal 4.3.3.1, Table 4.3.3.1 1, item 3.s HPCI RPV Low Level 2 Cal 4.3.3.1, Table 4.3.3.1 1, item 3.b HPCI Drywell Press High Cal 4.3.3.1, Table 4.3.3.1 1, Item 4.s ADS RPV Low Level 1 Cat 4.3.3.1, Table 4.3.3.1 1, Item 4.f ADS RPV Low Level 3 Cal 4.3.3.1, Table 4.3.3.1-1, Item 4.h ADS Drywell Pressure High Bypass Timer 4.3.4, Table 4.3.4 1, Item 1 RPV Low Water Level 2 Cal (ATWS) 4.3.4, Table 4.3.4 1, item 2 RPV Press High Cat (ATWS) 4.3.4.2 ATWS Logic System Functional Test 4.3.5.1, Table 4.3.5.1 1, item a RPV Low Level 2 Cal (RCIC) 4.3.5.1, Table 4.3.5.1 1, Item b RPV High Level 8 Cal (RCIC) 4.3.5.2 RCIC Logic System Functional Test 4.3.7.5, Table 4.3.7.5 1, I tem 1 RPV Press Cet Accident Mon.

4.3.7.5, Tabte 4.3.7.5-1, Item 2.s RPV Fuel Zone Level Cal Accident Mon 4.3.7.5, Table 4.3.7.5 1, item 2.b RPV Wide Range Level Cal Accident Mon 4.3.7.5, Table 4.3.7.5 1, item 12 CTHT High Range Red Monitoring Cal Accident Mon.

4.3.7.5, Table 4.3.7.5 1, Item 16 CTMT isolation Valve Position Cal Accident Mon 4.3.9.1, Table 4.3.9.1 1, Item a RPV High Water Level 8 Cat FW/ Main Turbine Trip 4.3.9.2 FW/ Main Turbine Trip LSFT 4.3.11.1, Table 4.3.11.1 1, item 7 Alt S/D system Rx Water Level instrument operability 4.3.11.1, Table 4.3.11.1 1, Item 8 Alt S/D system Rx Press instrument operability 4.4.2.2.b SRV Low Low Set Pressure setpoint Cat and LSFT 4.5.1.d.2.s ADS System Functional Test 4.6.3.2 Primary Containment isol Valve operability 4.7.4.c.1 RCIC Functional Test 4.8.4.2.a.1.4 Prl. Cont. Pen. Conductor Overcurrent Devices Fmetional Test 4.8.4.2.a.1.b Prl. Cont. Pen. Conductor Overcurrent Devices Functional Test l

I

. \

l FERMI - UNIT 2 3/4 0-4 Amendment No. JES, JSS,  ;

I f

1 ,

Attachment I to NRC-98-0117 Page 4

. s demonstrate that the increased surveillance interval would not increase the period a function would be unavailable. No RPS response time test failures were identified in this review.

Based on the above, a one-time extension of the RPS Instrumentation Response Time -

Testing SR isjustified.