Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00)
ML20203A066
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/20/1986
From:
DETROIT EDISON CO.
To:
Shared Package
ML20203A024 List:
References
T5000-85-01, T5000-85-1, NUDOCS 8604160221
Download: ML20203A066 (5)


Text

- _ - - _ _ _ _ _ _ _ _ - _

l 1

l l

LEAKAGE REDUCTION PROGRAM

SUMMARY

REPORT j FOR PRIMARY CONTAINMENT MONITORING SYSTEM - (T50-00) i DETROIT EDISON COMPANY FERMI-2 POWER PLANT l

l REPORT NO. T5000-85-01 Prepared By: 7[ /

TSI Projyfims Supe (4isor Date: J-/7 fd Approved By: 4h / f 6 ,

Plant' Manager ' '

8604160221 860410 P PDR ADOCK 05000341=-

P PDR

. LEAKAGE REDUCTION PROGRAM REPORT FOR PRIMARY CONTAINMENT MONITORING SYSTEM (T50-00)

INTRODUCTION: Both the Fermi-2 Technical Specifications, paragraph I 6.8.4.a.2, and the Fermi-2 FSAR, Section H.III.D.l.1, require that leakage from systems outside primary containment that could or would contain highly radioactive fluids, be reduced.

i and maintained to as-low-as-practical levels. To. demonstrate i the leak tight integrity of the Primary Containment Monitoring System, a system leakage test is conducted once i- per reactor refueling (approximately once every 18 months).

This report is for the initial leakage test and retest after replacement of Hydrogen / Oxygen monitoring panels in both Divisions.

REFERENCES:

, 1) Dwg. No. 6M721-5741, " Primary Containment Monitoring System - Functional Operating Sketch".

2) Procedure No. 43.408.01, " Primary Containment Monitoring System Leakage Test". (A copy of this procedure is on file at the plant).

! TEST DESCRIPTION: Procedure 43.408.01 consists of two separate l tests, one for each Division. With all the containment 4

isolation valves closed the entire Division is pressurized 4

through a Leak Rate Monitor to achieve final test pressure of

] 56.5 psig (+1 psig, -0 psig). The system is allowed to stabilize at test pressure for a minimum period of 10 minutes after which test readings are taken. The Leak Rate Monitor measures the amount of makeup air required to i

maintain test pressure which is equivalent to the total system leakage. If leakage is substantial, corrective maintenance is performed and the test is reperformed.

< TEST

SUMMARY

On 9-10-85, a base line test was performed on Division I. An Initial leakage of 11.95 SCFH was recorded.

Inspection within the Hydrogen / Oxygen analyzer Panel revealed several fittings which were not tight. The analyser's upper and lower diaphragms were found leaking an excessive amount.

The system was returned to maintenance for repairs. After the repairs were completed, another test was performed and a leakage rate of 5.40 SCFH was recorded. Leakage was still-noted at the Analyzer pump and additional efforts were made 4 by maintenance to repair the leaks, but no reduction in the leakage rate was observed.

On 9-23-85 a base line test was performed on Division II.

-During the initial test, the LRM panel was not able to stabilize, and the leakage rate was greater than the panel could. measure. Inspections of the piping system and within the hydrogen / oxygen panel resulted in determining _ external

, leakage from tubing fittings and pump diaphragms within the Hydrogen / Oxygen analyzer panel.

Page 1

LEAKAGE REDUCTION PROGRFtM REPORT FOR PRIMARY CONTAINMENT MONITORING SYSTEM - (T50-00)

The system was depressurized and maintenance was performed on the leaking components. The post maintenance test was performed and a leakage rate of 1.40 SCFH was recorded.

During the Fall Outage 85-01 both Divisions were modified.

The modification included the change out of both Hydrogen / Oxygen Analyzers, the deletion of both Sample Pumps T5000-C001 A & B and containment isolation valves T50-F406 A

& B. Test results after the modification were: Division I 0.86 SCFH and Division II 0.85 SCFH. Both tests were completed on 11-9-85.

l Test Results Summary: Corrective maintenance yielded a net result of:

DIVISION - I As Found Leakage Leakage Reduced By As Left Leakage Maintenance Activity 11.95 SCFH 11.09 SCFH 0.86 SCFH DIVISION - II l

1.40 SCFH 0.55 SCFH 0.85 SCFH l ACCEPTANCE CRITERIA: The general leakage criteria to be applied l during the first fuel cycle as the basis for instituting l corrective action in the form of corrective maintenance shall l

be 2.0 SCFH for each division. Per the EF-2 FSAR, this leakage criteria will be further evaluated at the end of the first refueling cycle to determine the long range leakage reduction program criteria. This will allow experience

gained during the initial fuel cycle to be factored into the l long range criteria.

l l

l l

1 1

Page 2

LEAKAGE REDUCTION PROGRAM REPORT FOR PRIMARY CONTAINMENT MONITORING SYSTEM (T50-00)

LEAKAGE EXAMINATION DATA SHEET - DIVISION I TEST RESULTS: Test performed prior to the modification removing the High Flow Sample Pump. Date Test performed.9-10-85 Examination Point / Location Leakage Detected Description Yes No Radiation Monitor, H21-P284 EL 614' X all external screw connections. B-12 Hydrogen / Oxygen Analyzer EL 614' X H21-P282 all external screw B-12 connections.

High flow sample Pump T5000- EL 614'- X C001A all external screw B-12 connections.

PDIS-N021A, all external EL 619' X screw connections. B-12 Test performed after replacement of the Hydrogen / Oxygen Analyzer and removal of the High Flow Sample Pump during the 85-01 Fall Outage. Date 'fest performed 11-9-85.

Examination Point / Location Leakage Detected Description Yes No Radiation Monitor H21-P284 EL 614' X all external screw connections. B-12 Hydrogen / Oxygen Analyzer EL 614' X H21-P282 all external screw B-12 connections.

Page 3

\

LEAKAGE REDUCTION PROGRAM REPORT FOR PRIMARY CONTAINMENT MONITORING SYSTEM - (T50-00)

LEAKAGE EXAMINATION DATA SHEET'- DIVISION II TEST RESULTS: Test performed prior to the modification removing the High Flow Sample Pump. Date Test performed: 9-23-85 Examination Point / Location Leakage Detected Description Yes No Hydrogen / Oxygen Analyzer EL 642' X H21-P283 all external screw F-ll connections.

i High Flow Sample Pump T5000- EL 642' X R001B all external connections. F-ll-PDIS-N021B, all external EL 642' X screw connections. F-ll Test performed after replacement of the Hydrogen /Oxygem Analyzer and removal of the High Flow Sample Pump during the 85-01 Fall Outage. Date Test performed: 11-9-85 Examination Point / Location Leakage Detected Description Yes No l

Hydrogen / Oxygen Analyzer EL 642' X H21-P283 all external F-ll screw connection.

4 i;

I l

l l

l l l l