June 13, 1986 VP-860070 PRIORITY ROUTING Mr. James G. Keppler
[
Regional Administrator
/2 f/L JP
- s M
S Region III U. S. Nuclear Regulatory Commission h
799 Roosevelt Road Glen Ellyn, Illinois 60137 f~1c>
Dear Mr. Keppler:
Reference:
(1)
Fermi 2 NRC Docket No. 50-341 Facility Operating License No. NPF-43 (2)
Detroit Edison Letter to NRC "Startup Report" VP-86-0014, Dated March 12, 1986
Subject:
Startuo Reoort - Supolement 1 This is Supplement 1 of the Startup Report for Fermi 2.
As required by Fermi 2 Technical Specification 6.9.1.3, this supplement is being submitted within 3 months of the initial Startup Report (Reference No. 2).
Because the plant has been shut down since October 1985, there are no test results to report at this time.
A supplemental report will be submitted by September 20, 1986.
If you have any questions regarding this report, please contact Mr. Lewis Bregni, Compliance Engineer at (313) 586-5313.