Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days
ML20247Q119
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/20/1998
From:
DETROIT EDISON CO.
To:
Shared Package
ML20247Q103 List:
References
NUDOCS 9805280207
Download: ML20247Q119 (4)


Text

.

Enclosure 4 to NRC-98-0099 Page 2 l

ENCLOSURE 4-PART1 PROPOSED TECHNICAL SPECIFICATION MARK-UP PAGES INCLUDED PAGE(S):

3/41-4 l

l 9605290207 990520 PDR ADOCK 05000341 p PDR ,,

p.w_muu u uumnuumsvw uu wz LIMITING CONDITION FOR OPERATION (Corithutd) -

- & gilds: (Continued) ,

2. If the inoperable control rod (s) is inserted, within I hour disarm the associated directional control valvesa either:

a) Electrically, or b) Hydraulically by closing the drive water and erhaust water isolation valves.

Otherwise, be in at least MT SWTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c. With more than 8 control rods inoperable, be in at least HOT SWTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

ov drain b.nes w & one -

m d. With oner scram discharge volume ventJawaw/ne one uran ditcharq@

pitme orna valve inoperable emFma, restore the inoperable valve (s) to JPERABLE status within Mp or be in at least HOT SHUTDOWN within rn c. ' ' ord F*

tyhmeNra@ valvetsF eRarwsH) inoperable, tentarNnr anovaracJ tgivert%to within the next MRKBLE 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. statu)k i sel t, 03, m,a,va (;ne %within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> {cir SURVEILLANCE RE001REMENTS 4.1.3.1.1 The scram discharge volume drain and vent valves shall be demonstrated OPERABLE by:

a.
  • At least once per 31 days verifying each valve to be open,* and
b. Evaluating scram discharge volume system response prior to plant startup l after each scram to verify that no abnormalities exist. l 4.1.3.1.2 When above the preset power level of the RWM, all withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one notch:
a. At least once per 7 days, and
b. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> wh'en any control rod is innovable as a result of l excessive friction or mechanical interference. ,
  • Tr.ese valves may be closed intermittently for testing pnder administrative l controls.
    • May be rearmed intermittently, under administrative control, to permit testing associated with restoring the control rod to CPERABLE status. ~

< r a S,pr.t, Ac+ ion anh is.If,w,[p eatt, SbVrenbnd drein lin, VW An is.ldcA IN,nq k< unis,lal<A $nder aan.bisbatiw whil k. all*w drainin3anJ verH,3 4 ti,e s>v.  ;

FERMI - UNIT 2 3/4 1-4 Amendment No. J7, SJ. 99 'i i

l I

I L . .

Enclosure 4 to a

NRC-98-0099 Page 3 l ENCLOSURE 4 - PART 2 PROPOSED TECHNICAL SPECIFICATION REVISED PAGES INCLUDED PAGEfS):

3/41-4 l

i l

i l

0.

4, REACTIVITY CONTROL SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION: (Continued)

2. If the inoperable control rod (s) is inserted, within I hour

. disarm the associated directional control valves ** either:

a) Electrically, or b) Hydraulically by closing the drive water and exhaust water . isolation valves.

Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c. With more than 8 control rods inoperable, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

'*** d. With one or more scram discharge volume vent or drain lines with one valve inoperable, restore the inoperable valve (s) to OPERABLE status within 7 days, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

      • e. With one or more scram discharge volume vent or drain lines with both valves inoperable, isolate the associated line within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ****, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.1.1 The scram discharge volume drain ar.d vent valves shall be demonstrated OPERABLE by:

a. At least once per 31 days verifying each valve to be open,* and
b. Evaluating scram discharge volume system response prior to plant startup after each scram to verify that no abnormalities exist.

4.1.3.1.2 When above the preset power level of the RWM, all withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one notch:

a. -At least once per 7 days, and l b. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when any control rod is immovable as a result of excessive friction or mechanical interference.
  • These valves may be closed intermittently for testing under administrative

-controls.

    • May be rearmed intermittently, under administrative control, to permit testing associated with restoring the control rod to OPERABLE status.
l. -*** Separate Action' entry is allowed for each SDV vent and drain line.

K ~ ****An -isolated line may be unisolated under administrative control to allow draining and venting of the SDV.

FERMI'-' UNIT 2- 3/4 1-4 Amendment No. J/, JJ, pp,