4 4,-.y i- DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST

- t 12/10/98 To:'00935' US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Crpies Lvl Date Sec Status

==..............................................................................

TMTRM TRM VOL I 27 11 IR 12/10/98 AFC Please destroy or mark all revised, superseded, or cancelled documents es such. CONTROLLED stamps must be voided by lining through and initialing.

g Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.

Ref: E52186 1 oO

\

9812210138 981210 l PDR ADOCK 0500034 p PM

..-__._.__.__---_._..._..____..-.__.._._--_..--.--__-q Q '

l-y .

I' LICENSING DOCUMENT TRANSMITTAL TECHNICAL REQUIREMENTS MANUAL, VOLUME 1 Instructions for Revision 27 dated 12/10//98 i

i Immediately upon receipt of the item (s) below, please insert and/or remove the documents

-indicated. Destroy the removed documents. Be sure Revision 26 has been placed in TRM Vol I prior to inserting these pages.  !

Location Remove Insert l

l Title Page Title Page Title Page 1 Rev 26 10/13/98 Rev 27 12/10/98 i l

List of Effective Pages LEP-1, Rev. 26 10/98 LEP-1, Rev. 27 12/98

{

[ LEP-2, Rev. 26 10/98 LEP-2, Rev. 27 12/98 j

Section 3.3 Page 3/4 3-13 Rev 20 06/98 Page 3/4 3-13 Rev 27 12/98 Page 3/4 3-23 Rev 20 06/98 Page 3/4 3-23 Rev 27 12/98 l

END 1

i i

l l

O  ;

i l

=_ .. - . - - - . . - . - . - . _ - . . . . -

.:D

'l , .

1 1

l l

l Fermi 2 l l

1 l

1 l

l Technical Requirements l

Manual l

l lO l

Volume I l

l l

l l

Detroit l

I Edison i

ARAIS-INFORMA170N DTC: TMTRM l File: 1754 DSN: TRM VOL I l Rev: 27 Date: 12/10/98 Recipient 9/ S' l

l l

l L# FERMI 2 - TECHNICAL REOUIREMENTS MANUAL

[ 4 ,,  : 1 LIST OF EFFECTIVE PAGES

/i '

i

(/ Pace * '

Revision Page Revision  ;

)

1 19 3/4 6-1 19 )

2 19 3/4 6-2 19 '

i (

3/4 6-3 19 ii 20 3/4 6-4 19 iii- 23 3/4 6-5 19 1 iv 20 3/4 6-6 19 i v 20 3/4 6-7 19 3/4 6-8 19 TECHNICAL REOUIREMENTS 3/4 6-9 19 3/4 6-10 19 1-1 19 3/4 6-11 19 i 1-2 19 3/4 6-12 19 i

1-3 19 3/4 6-13 19 1-4 19 3/4 6-14 19 2-1 Blank 3/4 6-15 19 3/4.0-1 19 3/4 6-16 19 3/4 0-2 19 3/4 6-17 19 3/4 0-3 19 3/4 6-18 19 3/4 0-4 19 3/4 6-19 19 3/4 0-5 19 3/4 6-20 19 3/4 0-6 19 3/4 6-21 19 3/4 0-7 19 3/4 6-22 19 I 3/4 1-1 Blank 3/4 6-23 19

g]g s 3/4 2-1 Blank 3/4 6-24 19 l 3/4 3-1 19- 3/4 6-25 19 3/4 3-2 25 3/4 6-26 19 3/4 3-3. 19 3/4 6-27 19 l 3/4 3-4 19 3/4 6-28 19 3/4 3-5 22 3/4 6-29 19 3/4 3-6 19 3/4 7-1 Blank 3/4 3-7 19 3/4 8-1 19 3/4 3-8 19 3/4 8-2 19 3/4 3-9 26 3/4 8-3 19 3/4 3-10 19 3/4 8-4 19 3/4 3-11 20 3/4 8-5 23 3/4 3-12 21 3/4 8-6 19 3/4 3-13 27 3/4 9-1 Blank 3/4 3-14 20 3/4 10-1 Blank 3/4 3-15 20 3/4 11-1 Blank 3/4 3-16 20 3/4 12-1 Blank 3/4 3-17 20 5-1 Blank 3/4 3-18 20 6-1 Blank 3/4 3-19 20 3/4 3-20 20

'~

3/4 3-21 20

-3/4 3-22 20 3/4 3-23 27 3/4 3-24 20 I VI) 3/4 4-1 Blank l

3/4 5-1 Blank I

TRM Vol. I LEP-1 REV 27 12/98 i

l

e

  • FERMI 2 - TECHNICAL REOUIREMENTS MANUAL i

't,, .

I LIST OF EFFECTIVE PAGES

(,) Page '

Revision Page Revision CORE OPERATING LIMITS REPORT 9A.6-26 TRM REV 15 !

COLR 7, Revision 0 9A.6-27 3  ;

.oA.6-28 3 l Notation Page I 1 0 1 2 0 ,

1 3 0 4 0 5 0 6 0 7 0 l 8 0 1 9 0 10 0 11 0 12 0 13 0 l 14 0 15 0 l l

FIRE PROTECTION LIMITING j'~'N CONDITIONS FOR OPERATION y) AND SURVEILLANCE REOUREMENTS 9A.6-1 3 9A.6-2 6 9A.6-3 5 9A.6-4 5 9A.6-5 TRM REV 17 9A.6-6 TRM REV 17 9A.6-7 TRM REV 17 9A.6-8 6 9A.6-9 TRM REV 17 9A.6-10 6a 9A.6-11 6a 9A.6-12 6 9A.6-13 6 9A.6-14 3 9A.6-15 3 9A.6-16 3 9A.6-17 3 9A.6-18 3 9A.6-19 6 9A.6-20 3 l

9A.6-21 TRM REV 7 9A.6-22 3 9A.6-23 TRM REV 8 9A.6-24 TRM REV 8

( .sb) 9A.6-25 TRM REV 15 TRM Vol. I LEP-2 REV 27 12/98

.___,__-______.m._m . _ _ _ . _ . _ _ . - , . . - . - - - _ ~ - _ , . . . . . - _ . _ . - _ . . . . . _

e

. c.

l TRM TABLE 4.3.7.2-1 i *

^

SEISMIC MONITORING INSTRUMENTATION SURVEIT TANCE REOUIREMENTS CHANNEL CHANNEL FUNCTIONAL CHANNEL INSTRUMENTS AND SENSOR LOCATIONS CHECK TEST CALIBRATION

1. Active Triaxial System.
a. Active Triaxial Accelerometers
1) HPCI Room NA SA R
2) Base of RPV Pedestal, l In Drywell NA SA R
b. Active Seismic Recording System *
1) Relay Room, Auxiliary Building ** M(a) SA R
c. Active Seismic Playback System
1) Relay Room, Auxiliary Building M SA R l 2. ' Passive Triaxial Peak Shock.

Recorders e

a. HPCI~ Room NA NA R
b. Relay Room, Auxiliary Building NA NA R i
c. Refuel Floor, Reactor Building NA NA R
d. ' Diesel Generator Room, RHR Complex NA NA R
e. Switchgear Room, RHR Complex NA NA R l
f. ' Cooling Tower, RHR Complex NA NA R l>
  • Including seismic trigger.,
    • With reactor control room annunciation.

(a)Except seismic trigger.

lO i

TRM Vol. I. 3/4 3-13. REV 27 12/98 i

I i

4 .. -

INSTRUMENTATION 0

r BASES 3 /4. 3. 7. 8 CHLORINE DETECTION SYSTEM The OPERABILITY of the chlorine detection system ensures that an accidental chlorine release will be detected promptly and the necessary protective actions will be automatically initiated to provide protection for control room personnel. Upon detection of a high concentration of chlorine, the control room emergency ventilation system will automatically be placed in the chlorine mode of operation to provide the required protection. In this mode of operation, all outside air intakes are closed to prevent ingress during a chlorine-release emergency. The detection system required by this Technical Requirement is consistent with the recommendations of Regulatory Guide 1.95, " Protection of Nuclear Power Plant Control Room Operators against an Accidental Chlorine Release", Revision 1, January, 1977.

When the control room emergency ventilation system is placed in the recirculation (radiological emergency) mode of operation, the emergency air intakes are used to bring in a limited amount of outside air. The chlorine detectors do not experience system air flow because they are located in the normal air intakes. The chlorine detectors remain physically and functionally OPERABLE; however, per the plant design, their specified function is not O required during the recirculation mode.

O TRM Vol. I 3/4 3-23 REV 27 12/98