TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative ChangeML20236U042 |
Person / Time |
---|
Site: |
Fermi |
---|
Issue date: |
07/16/1998 |
---|
From: |
DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20236U036 |
List: |
---|
References |
---|
NUDOCS 9807290270 |
Download: ML20236U042 (4) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned ML20199H9371998-01-28028 January 1998 Proposed Tech Specs Re thermal-hydraulic Stability,Idle Recirculation Loop Startup & Post Accident Monitoring ML20199H2611998-01-28028 January 1998 Proposed Tech Specs Re Access Control to Provide Flexibility While Maintaining Similar Control Over Access ML20199H2561998-01-28028 January 1998 Proposed Tech Specs,Modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Requirements Per 10CFR50.36a ML20199H2501998-01-28028 January 1998 Proposed Tech Specs 4.4.3.2.2.a,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements ML20199H2411998-01-28028 January 1998 Proposed Tech Specs,Revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch Can Be Performed ML20199H2141998-01-28028 January 1998 Proposed Tech Specs,Revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement ML20199H2281998-01-28028 January 1998 Proposed Marked Up & Retyped TS of Sheet 2,Table 3.3.6-2, Deleting RCS Recirculation Flow Trip Functions ML20203F1941997-12-10010 December 1997 Proposed Tech Specs Revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20202A7961997-11-26026 November 1997 Proposed Tech Specs Reflecting Alternative Wording for Surveillance Which Address Only Clarification to Situational Testing Requirement NRC-97-0089, Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested1997-09-29029 September 1997 Proposed Tech Specs,Relocating Selected Requirements & Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested ML20216F3581997-09-0505 September 1997 Proposed Tech Specs,Adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing ML20141B8881997-06-20020 June 1997 Proposed Tech Specs Re Relocation of Reactor Recirculation Sys MG Set Scoop Tube Stop Setting Surveillance 1999-09-03
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned 1999-09-03
[Table view] |
Text
~
1 TABLE 4.0.2-2
)
1 SURVEILLANCE TEST INTERVALS EXTENDED TO OCTOBER 18, 1998 j
SURVEILLANCE RE0VIREMENT DESCRIPTION 4.1.3.5.b.2 CR Accumulator Integrity Test (Check Valve Leakage) 4.1.5.d.1 SLCS operability Manual Initiation 4.1.5.d.2 SLCS puip Relief valve operability 4.1.5.d.3 SLCS flow path demonstration 4.3.1.1, Table 4.3.1.1 1, item 11 RPS Rx Mode Switch shutdown position functional 4.3.1.2 RPS Logic System Function Test i
4.3.2.1, Table 4.3.2.1 1, Item 6.a Sec. Cont. Isolation - Rx Water Low Level - Level 2 cat 4.3.2.2 1 solation Actuation Inst. LSFT 4.3.3.1, Table 4.3.3.1 1, Item 1.s CS RPV Low Level 1 Cal 4.3.3.1, Table 4.3.3.1 1, item 1.c CS Rx Steam Dome Press Low Cal 4.3.3.1, Table 4.3.3.1 1, Item 1.d CS Manual Initiation 4.3.3.1, Table 4.3.3.1 1, item 2.a LPCI RPV Low Level 1 Cat 4.3.3.1, Table 4.3.3.1 1, Item 2.c LPCI Rx Steam Dome Press Low Cal 4.3.3.1, Table 4.3.3.1 1, item 2.d LPCI Rx Low Level 2 Cat 4.3.3.1, Table 4.3.3.1-1, Item 2.e LPC! Rx Steam Dcae Press Low Cal 4.3.3.1, Table 4.3.3.1 1, Item 2.h LPCI Nanual Initiation 4.3.3.2 ECCS Logic System functional Tests 4.3.3.3(a)
ECCS Response Time Tests 4.3.6, Table 4.3.6 1, Item 5.b Scram Disc. Vol. Trip Bypass Funct. Test 4.3.6, Table 4.3.6-1, Item 7 Rx Mode Switch Shutdown Pos. Rod Block Funct. Test 4.5.1.c.1 ECCS System Functional Test 4.6.5.1.d.1 Secondary Containment SGTS Test 4.6.5.1.d.2 Secondary Containment CGTS Test 4.6.5.2.b Secondary containment Isolation Danper Actuation 4.7.1.2.b ECCW Automatic Actuation 4.7.1.3.b EESW Automatic Actuation 4.7.1.4.b EDG Cooling Water Pump Automatic Actuation l
4.7.2.1.c.1 CR Ventilation Filter Penetration 4.7.2.1.c.2 CR Ventilation Filter Charcoal Laboratory Analysis 4.7.2.1.c.3 CR Emergency Filtration System Flowrote 4.7.2.1.e.1 CR ventilation Filter Pressure Drop 4.7.2.1.e.2 CR Emergency Filtration System Operational Mode Actuation 4.T.2.1.e.4 CR Emergency Makeup Inlet Heater Dissipation 4.7.5.e snubber Functional Test i
4.8.1.1.2.e.1 EDG Inspection 4.8.1.1.2.e.2 EDG Load Rejection (1666 kW) 4.8.1ci,2.e.3 EDG Load Rejection (2850 kW) 4.8.1.1.2.e.4.s EDG LOP Load Shedding l
4.8.1.1.2.e.4.b EDG LOP Auto Start and Load Sequencing g
4.8.1.1.2.e.5 EDG ECCS Auto Start 4.8.1.1.2.e.6.a EDG LOP / ECCS Load Shedding 4.8.1.1.2.e.6.b EDG LOP / ECCS Auto Start and Load Sequencing 4.8.1.1.2.e.7 EDG Non essential Trip Bypass 4.8.1.1.2.e.8 EDG 24 Hour Run and Hot Fast Start.
4.8.1.1.2.e.9 EDG Auto Connect Load Verification 4.8.1.1.2.e.10 EDG Restoration of Offsite Power g
4.8.1.1.2.e.11 EDG Auto Load Sequencer Timer 4.8.1.1.2.e.12.a EDG 4160-volt ESF Bus Lockout l
4.8.1.1.2.e.12.b EDG Differential Trip Lockout 4.8.1.1.2.e.12.c EDG Shutdown Relay Trip Lockout 4.8.2.1.c.3 130 VDC Battery connections Resistance 4.8.2.1.d 130 VDC Battery Capacity l
4.8.4.5.s SLCS Circuit Breakers Functional Test i
TABLE NOTATIONS l
t (a)
The surveillance interval of channels within the same trip system required to be tested at least once every N times 18 months, where N is the total number of channels in the trip system, may be based upon the performance of the surveillance during the sixth refueling outage.
l FERMI - UNIT 2 3/4 0-6 Amendment No. JSE, 9007290270 990716 l
PDR ADOCK 05000341 P
PDR
n INDfX LIST OF TABLES IABLE EaGE l.1 SURVEILLANCE FREQUENCY NOTATION..................
1-9 1.2 OPERATIONAL CONDITIONS...........................
1-10 2.2.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION S ET P0 l NT S........................................
2-4 4.0.2-1 SURVEILLANCE TEST INTERVALS EXTENDED TO SEPTEMBER 14, 1998...............................
3/4 0-4 l
4.0.2-2 SURVEILLANCE TEST INTERVALS EXTENDED TO OCTOBER 18, 1998................................
3/4 0-6 l
3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION........
3/4 3-2 3.3.1-2 DELETED.........................................
3/4 3-6 4.3.1.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................
3/4 3-7 3.3.2-l' ISOLATION ACTUATION INSTRUMENTATION..............
3/4 3-11 3.3.2-2 ISOLATION ACTUATION INSTRUMENTATION SETPOINTS....
3/4 3-15 3.3.2-3 DELETED..........................................
3/4 3-18 4.3.2.1-1 ISOLATION ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................
3/4 3-20 3.3.3-1 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION..................................
3/4 3-24
' 3.3.3-2 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION SETP0lNTS........................
3/4 3-27 3.3.3-3 DELETED..........................................
3/4 3-29 4.3.3.1-1 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS........
3/4 3-30 3.3.4-1 ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION..................................
3/4 3-33 3.3.4-2 ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION SETP0lNTS........................
3/4 3-34 l
FERMI - UNIT 2 xxii Amendment No. ff, Jpp, 195, L
_ _ _ _ _ _. _ = _
s TABLE 4.0.2-2 SURVEILLANCE TEST INTERVALS EXTENDED TO OCTOBER 18. 1998 SURVEILLANCE REQUIREMENT DESCRIPTION 4.1.3.5.b.2 CR Accumulator Integrity Test (Check Valve Leakeo*)
4.1.5.d.1 SLCS operability Manual Initiation 4.1.5.d.2 SLCS pump Relief Valve operability 4.1.5.d.3 SLCS flow path demonstration 4.3.1.1, Table 4.3.1.1 1, Item 11 RPS Rx Mode Switch shutdown position functional 4.3.1.2 RPS Logic System Function Test 4.3.2.1, Table 4.3.2.1-1, Item 6.a Sec. Cont. Isolation - Rx Water Low Level - Level 2 cal 4.3.2.2 Isolation Actuation Inst. LSFT 4.3.3.1, Table 4.3.3.1-1, Item 1.a CS RPV Low Level 1 Cal 4,3.3.1, Table 4.3.3.1 1, Item 1.c CS Rx Steam Dome Press Low Cal 4.3.3.1, Table 4.3.3.1 1, Item 1.d CS Manual Initiation 4.3.3.1, Table 4.3.3.1 1, Item 2.a LPCI RPV Low Level 1 Cal 4.3.3.1, Table 4.3.3.1 1, item 2.c LPCI Rx Steam Dome Press Low Cal 4.3.3.1, Table 4.3.3.1 1, Item 2.d LPCI Rx Low Level 2 Cal 4.3.3.1, Table 4.3.3.1-1, Jtem 2.e LPCI Rx Steam Dome Press Low Cat 4.3.3.1, Table 4.3.3.1 1, Item 2.h LPCI Manual Initiation 4.3.3.2 ECCS Logic System Functional Tests 4.3.3.3(a)
ECCS Response Time Tests 4.3.6, Table 4.3.6-1, Item 5.b Scram Disc. Vol. Trip Bypass Funct. Test 4.3.6, Table 4.3.6-1, Item 7 Rx Mode Switch Shutdown Pos. Rod Block Funct. Test 4.5.1.c.1 ECCS System Functional Test 4.6.5.1.d.1 Secondary Containment SGTS Test 4.6.5.1.d.2 Secondary containment SGTS Test 4.6.5.2.b Secondary Containment Isolation Damper Actuation 4.7.1.2.b ECCW Automatic Actuation
- 4. 7.1.3. b EESW Automatic Actuation 4.7.1.4.b EDG Cooling Water Pump Automatic Actuation 4.7.2.1.c.1 CR Ventilation Filter Penetration
- 4. 7. 2.1. c. 2 CR Ventilation Filter Charcoal Laboratory Analysis 4.7.2.1.c.3 CR Emergency Filtration System Flowrate 1
4.7.2.1.e.1 CR Ventilation Filter Pressure Drop 4.7.2.1.e.2
' CR Emergency Filtration System Operational Mode Actuation 4.7.2.1.e.4 CR Emergency Makeup Inlet Hester Dissipation 4.7.5.e Snubber Functional Test 4.8.1.1.2.e.1 EDG Inspection 4.8.1.1.2.e.2 EDG Load Rejection (1666 kW) 4.8.1.1.2.e.3 EDG Load Rejection (2850 kW) 4.8.1.1.2.e.4.a EDG LOP Load Shedding l
4.8.1.1.2.e.4.b EDG LOP Auto Start and Load Sequencing l
4.8.1.1.2.e.5 EDG ECCS Auto Start 4.8.1.1.2.e.6.a EDG LOP / ECCS Load Shedding 4.8.1.1.2.e.6.b EDG LOP / ECCS Auto Start and Load Sequencing 4.0.1.1.2.e.7 EDG Non-essential Trip Bypass 4.5.1.1.2.e.8 EDG 24 Hour Run and Hot Fast Start.
4.8.1.1.2.e.9 EDG Auto Connect Load Verification 4.8.1.1.2.e.10 EDG Restoration of Offsite Power j
4.8.1.1.2.e.11 EDG Auto Load Sequencer Timer i
4.8.1.1.2.e.12.s EDG 4160-volt ESF Bus Lockout 4.8.1.1.2.e.12.b EDG Differential Trip Lockout 4.8.1.1.2.e.12.c EDG Shutdown Relay Trip Lockout.
4.8.2.1.c.3 130 VDC Battery Connections Resistance 4.8.2.1.d 130 VDC Battery Capacity 4.8.4.5.s SLCS Circuit Breakers functional Test TABLE NOTATIONS (a)
The surveillance interval of channels within the same trip system
-required to be tested at least once every N times 18 months, where N is the total number of channels in the trip system, may be based upon the performance of the surveillance during the sixth refueling outage.
l FERMI - UNIT 2 3/4 0 6 Amendment No. 106.
INDEX LIST OF TABLES TABLE Pfg 1.1 SURVEILLANCE FRE0VENCY NOTATION...............
1-9 1.2 OPERATIONAL CONDITIONS..........................
1-10 2.2.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SETP0lNTS.......................................
2-4 4.0.2-1 SURVEILLANCE TEST INTERVALS EXTENDED TO SEPTEMBER 14, 1998..........................
3/4 0-4 l
4.0.2-2 SURVEILLANCE TEST INTERVALS EXTENDED TO OCTOBER 18, 1998.............................
3/4 0-6 l
3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION.......
3/4 3-2
.3.3.1-2 DELETE0..........................................
3/4 3-6 4.3.1.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................
3/4 3-7 l
.3.3.2-1 ISOLATION ACTUATION INSTRUMENTATION..............
-3/4 3-11 l
3.3.2-2.
ISOLATION ACTUATION INSTRUMENTATION SETPOINTS...
3/4 3-15 i
3.3.2-3' DELETED.........................................
3/4 3-18 1
4.3.2.1-1 ISOLATION ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS........................
3/4 3-20 3.3.3-1
. EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION..................................
3/4 3-24 3.3.3-2 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION SETP0lNTS.......................
3/4 3-27 3.3.3 DELETED.......................................
3/4 3-29 4'.3.3.1-1 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS........
3/4 3-30 3.3.4-1.
ATWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION..................................
3/4 3-33 3.3.4-2 AlWS RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION SETP0lNTS.......................
3/4 3-34 FERMI - UNIT 2 xxii Amendment No.42. 100. 106.
- _ _ _ _ _