Special Rept:On 880511,radiation Monitor Removed from Svc in Order to Install Radiation Shields on Check Source Discovered Inoperable.Monitor Had Several Component Problems.Personnel Continuing to Prepare Problems
ML20155C862
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/31/1988
From: Mcdonald R
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NON-00111, NON-111, NUDOCS 8806140358
Download: ML20155C862 (3)


Text

_ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ , ,,

_e' 'T- Georgia Nwer Ccercany - r

'*- - .' g 0 333 P edmoM Avenue '

AttaMa. Georg-a 30303 Tekreo .e 404 506f>526 MMog Adyess.

Fbst Off.ce Ecx 4546

.AtiFta. GeOrg a 30332  ;

R. P. Mc Donald t/W SCWayn eWfnc !) 5!em E2Metwe V:ce Pres 4ent Nuclear Oreat or*s NON-00111 May 31, 1988 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C. 20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 TECHNICAL SPECIFICATION SPECIAL REPORT INOPERABLE RADIATION HONITOR Gentlemen; In accordance with the requirements of Plant Vogtle -

Unit 1 Technical Specification. Section 3.3.3.6, Georgia Power Company is submitting the enclosed Special Report concerning an inoperable radiation monitor.

. Sincerely ,

I I/A/ k J k f' R. P. Mcdonald TEH/stl Enclosure c: (see next page) 1\

8806140358 880531 POR ADOCK 05000424 s DCD e

'o -', '

Georgia Power d U. 3. Nuclear Regulatory Commission May 31, 1988 Page Two c: Georaia Power Comoany Mr. P. D. Rice Mr. G. Bockhold, Jr.

Mr. L. T. Gucwa Mr. H. Sheibani GO-NORMS /V0GTLE-NORMS U. S. Nuclear Reaulatory Commission Dr. J. N. Grace, Regional Administrator Mr. J. B. Hopkins. Licensing Project Manager, NRR (2 copies)

Mr. J. F. Rogge, S0r;or Resident Inspector-0perations, Vogtle 0955m

g 4 s ENCLOSURE

  • PLANT V0GTLE - UNIT 1 i NRC DOCKET 50-424 OPERATING LICENSE NPF-68 TECHNICAL SPECIFICATION SPECIAL REPORT A. Requirement for Report This report is raquired in accordance with Plant Vogtle - Unit 1 Technical Specification, Section 3.3.3.6, Table 3.3-8 Item 15.

This section requires a special report to be submitted when steam line radiation monitor RE-13121 is inoperable for more than 7 days.

B. Description of Radiation Monitor Inoperability Steam line radiation monitor RE-13121 was removed from service on 5-11-88 in order to install radiation shields or, the check source per a design change. When it was determined that the shields were improperly sized and could not be installed, plant personnel attempted to return RE-13121 to service but were unsuccessful. An investigation involving testing the monitor has found several component problems.

Plant personnel are continuing to troubleshoot and repair these problems and believe that the monitor will be returned to service by June 15, 1988.

e 9