Special Rept 2-92-5:on 920709-12,temp in Room 122 of Equipment Bldg Exceeded Max Normal Temp of 115 F for More than 8 H.Periods of Plant Operation W/Higher than Normal Temps Had No Effect on Continued Operability of Equipment
ML20113H522
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/31/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2-92-5, ELV-03929, ELV-3929, NUDOCS 9208040201
Download: ML20113H522 (2)


Text

- - - - _ _ _ _ - _ - __ - _ - - -

, owa ow r ccxw i e owema ce= rr+ w

). Post CTYe Das ' 2 <>

dn 9. s fr. Abt eg? $ d' li www u av m:

L C. K. M: Coy Cicorgia Power

' .t t f!

, 5 A ' .t IlJ # l' vwp ew J,Ry n ,172

' ~ ~ ~c .

ELV-03929 002062 Docket Nos. 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 m

Gentlemen:

V0GTLE ELECTRIC GENERATING PLAN 1 AREA MAQMUM NORMAL TE.[iPJMBlRE EKEEDED in accordance with the requirements of the Vogtle Electric Generating Plant Technical Specifications sections 2.7.10 and 6.8.2, Georgia Power Company hereby submits the enclosed Special Report concerning the exceeding of a maximum normal '

temperature limit for more than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

If there are any questions, please contact my office.

Sincerely,

.. / ,

C. K. McCoy s

CKM/HWM/gmb .

Enclosure xc: Geotaia Power Co_mp s ,

y Mr. W. B. Shipman Mr. M. Sheibani NORMS U. S. _Nuflear Reoulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. 3. liood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resider.t Inspector, Vogtle f

9209040201 920731 /

//9 1 PDR g

ADOCK 05000425 PDR /v [//V'/ "  ;

l I

1

t l

. \

i V0GTLE ELECTRIC GENERATING PLANT - UNIT 2 i TECHNICAL SPECIFICATION SPECIAL REPORT 2-92-5 i A_81A MAXIMUM NORMAL TEMPERATURE EXCEEDED A. REQUIREMENT FOR REPORT This report is written in accordance with the Vogtle Electric Generating Plant Technical Specifications- (TS), section 347.10a, which requires that a Special Report be submitted to the Commission whenever the maximum normal temperature of an area has been exceeded for more than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

B. DESCRIPTION OF EVENT On three occasions during the period of July 9-12, 1992, the temperature in room 122 of the equipment building exceeded the maximum normal temperature of 115 degrees i for more than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The periods of time were: 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and 21 minutes, and 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br />. The maximum room temperature recorded during any of these periods was 123.5 degrees F, which is less than the maximum abnormal temperature of 126 degrees F.

C. ENGINEERING EVALUATION The effects of a loss of HVAC on equipment operability and qualified life had recently been evaluated for the Vogtle Electric Generating Plant. This evaluation showed that the equipment in this room will remain operable for at least- 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, at temperatures up to 150 degrees F, withnut loss of function or significant effect on the service life. Therefore, it has been concluded that these perioJs of operatisn between 115 degrees and 123.5 degrees had no effect on continued operability of the equipment in room 122.

p i

,