Special Rept 2-95-1 Re Invalid DG Failures.Test Frequency for DGs Remains at Once,Per 31 Days,W/Requirements of TS Table 4.8-1
ML20082F028
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/04/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2-95-1, LCV-0585, LCV-585, NUDOCS 9504110441
Download: ML20082F028 (3)


Text

~

gx  !

.' Geor@a Power Company t'. , , . .

40 inverness Center Parkway V 4 E *-  : Post Offce Box 1295-

' Birmingham, Alabama 35201 '

Tetephone 205 877 7f 22.-

c.K. uccov= GeorgiaPower V.co Presdent Nuclear Yogtto Protect ' ^ tre souttern etttlic sn!em March.4, 1995 LCV-0585 ,

' Docket No. 50-425 U. S. Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT SPECIAL REPORT 2-95-1 INVALID DIESEL GENERATOR FAILURES In accordance with the requirements of Vogtle Electric Generating Plant Technical Specifications (TS) sections 4.8.1.1.3 and 6.8.2, Georgia Power Company submits the enclosed special report concerning invalid diesel generator failures.

Sincerely, M/ht '

C. K. McCoy CKM/TEW  ;

Enclosure:

Special Report 2-95-1 xc: Georgia Power Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS 1 E S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 110024 '

9504110441 950304 -g l

PDR ADOCK 05000425  :

g PDR l i

! _j

. *5

. VOGTLE ELECTRIC GENERATING PLANT- UNIT 2 TECIINICAL SPECIFICATION SPECIAL REPORT 2-95-1 INVALID DIESEL GENERATOR (DG) FAILURES A. REQUIREMENT FOR REPORT This report is required in accordance with the Vogtle Electric Generating Plant Technical Specifications (TS), section 4.8.1.1.3, which requires all DG failures, valid or invalid, be reported to the Commission in a special report pursuant to TS 6.8.2.

B. DESCRIPTION OF INVALID FAILURES OF DIESEL GENERATORS 2A & 2H During the 2R4 refueling outage, a number of design changes were incorporated on the 2A and 2B DGs. Ten (10) of the eleven (11) failures occurred on DG2B, where the changes were first installed. One modification included installation of a new mechanical speed governor which required a number of starts to adjust and achieve the proper setting. In separate design changes, additional automatic voltage regulators were installed on the DGs and new power source circuit breakers were added to the 4 kV safety busses which exhibited installation and testing problems. The failure of DG2A was the result of a failed temperature sensor. Individual failures for the DGs are outlined on the attached table.

C.

SUMMARY

The DG2B failures have been determined to be invalid because they involved components that had not yet been fully tested and placed into service. A brief description of the cause of each failure is listed in the attached table.

The failure of DG2A was also determined to be invalid since the failed temperature ,

sensor does not trip the engine in the emergency mode of operation.

Following testing, both DGs were declared operable and returned to service.

Diesel Generator 2 A has had 0 valid failures in both the last 20 valid tests and in the last 100 valid tests. Diesel Generator 2B has had 0 valid failures in the last 20 valid tests and 1 valid failure in the last 100 valid tests. Test frequency for both diesel generators remains at once per 31 days in accordance with the requirements of TS table 4.8-1.

w . *

,2 7 -

.e

. m .7 m

. A 5

VOGTLE ELECTRIC GENERATING PLANT- UNIT 2. . .

TECHNICAL SPECIFICATION SPECIAL REPORT 2-95-1 INVALID DIESEL GENERATOR (DG) FAILURES  ;.

DATE START /STOP CAUSE CORRECTIVE ACTION .

3-9-95 0949/0949 DG2B Mechanical Speed Governor Setting Low . Increased Governor . Setting .

(Note: This was an iterative _ process)
3-9-95 0953/0953 DG2B Mechanical Speed Goverror Setting Low Increased Governor Setting i

.t 3-9-95 0958/0958 DG2B Mechanical Speed Governor Setting Low Increased Governor Setting

! 3-9-95 1009/1011 DG2B Mechanical Speed Governor Setting I.ow Increased Governor Setting-DG2B Mechanical Speed Governor Setting Low Increased Governor Setting - "

3-9-95 1142/1143

, 3-9-95 1508/1531 DG2B Voltage Regulator Modification Wiring Error Troubleshooting Conducted _.

1 3-9-95 1603/1615 DG2B Voltage Regulator Modification Wiring Error Troubleshooting Continued 3-10-95 0007/0531 DG2B Voltage Regulator Modification Wiring Error Corrected -

3-10-95 1731/2318 DG2B Broken Lug On Fuse Holder of Generator PT Repaired Lug On Fuse Holder 3-13-95 ' 2317/2344 DG2B - Safety Bus Power Source Breaker ddjusted Linkage' Position Switch Linkage Misadjusted (Disrupted DG with Grid Parallel Operation) 3-21-95 1527/1529 DG2A Main Bearing Temperature Sensor Failure Replaced Sensor 4