MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:UTILITY
MONTHYEARIR 05000324/19900441990-11-20020 November 1990 Partially Withheld Insp Repts 50-324/90-44 & 50-325/90-44 on 901022-26.No Violations Noted.Areas Inspected:Records, Operations & Physical Inventory for Use,Control & Accountability of SNM ML20062G3941990-11-19019 November 1990 Insp Repts 50-324/90-41 & 50-325/90-41 on 901002-1104. Noncited Violation Noted.Areas Inspected:Surveillance Observation,Operational Safety Verification,Initial Response to Onsite Events,Onsite Review & Followup IR 05000324/19900461990-11-0505 November 1990 Partially Withheld Insp Repts 50-324/90-46 & 50-325/90-46 on 901017 (Ref 10CFR73.21).No Violations or Deviations Noted. Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel IR 05000324/19900421990-10-23023 October 1990 Insp Repts 50-324/90-42 & 50-325/90-42 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Independent Action Plan Action Items to Correct Three Weaknesses Identified in 1989 by NRC IR 05000324/19900321990-10-18018 October 1990 Insp Repts 50-324/90-32 & 50-325/90-32 on 900806-10 & 20-24. No Violations Noted.Major Areas Inspected:Inservice Testing, Reverse Pressurization of Containment Isolation Valves & Followup on Previous Insp Findings IR 05000324/19900371990-10-18018 October 1990 Insp Repts 50-324/90-37 & 50-325/90-37 on 900908-1001. Violations Noted.Major Areas Inspected:Maint & Surveillance Observation,Operational Safety Verification,Esf Sys Walkdown,Ler Review & Nonroutine Reporting Program IR 05000324/19900361990-09-17017 September 1990 Insp Repts 50-324/90-36 & 50-325/90-36 on 900821-25.Major Areas Inspected:Review of Events That Lead to Unit 2 Reactor Trip on 900819 IR 05000324/19900301990-08-24024 August 1990 Partially Withheld Insp Repts 50-324/90-30 & 50-325/90-30 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Mgt Support,Security Program Plans & Audits IR 05000324/19900281990-08-24024 August 1990 Insp Repts 50-324/90-28 & 50-325/90-28 on 900723-27.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluent,Plant Chemistry & Confirmatory Measurements IR 05000324/19900311990-08-23023 August 1990 Insp Repts 50-324/90-31 & 50-325/90-31 on 900730-0803.No Violations or Deviations Noted.Major Areas Inspected: Diagnostic Evaluation Team Evaluation of Integrated Action Plan Corrective Action IR 05000324/19900261990-08-22022 August 1990 Safety Insp Repts 50-324/90-26 & 50-325/90-26 on 900701-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Onsite Review Committee & Onsite LER Review IR 05000324/19900271990-08-0303 August 1990 Revised Insp Repts 50-324/90-27 & 50-325/90-27 on 900709-12. No Violations Noted.Major Areas Inspected:Electrical Sys Designs & Maint ML20059A7231990-08-0101 August 1990 Insp Repts 50-324/90-27 & 50-325/90-27 on 900709-12.No Violations or Deviations Noted.Major Areas Inspected: Electrical Sys Design & Maint & Follow Up to Potential Concerns Identified in Previous Insp IR 05000324/19900251990-07-26026 July 1990 Insp Repts 50-324/90-25 & 50-325/90-25 on 900709-13. Violations Noted.Major Areas Inspected:Review of Licensee Organization & Mgt Controls & Onsite Followup of Events at Facility ML20056A9101990-07-17017 July 1990 Insp Repts 50-324/90-19 & 50-325/90-19 on 900601-30.No Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Licensee self-assessment Capability & Onsite LER Review IR 05000324/19900231990-07-11011 July 1990 Insp Repts 50-325/90-23 & 50-324/90-23 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Status of Corrective Action Program for Problems Noted by Site Issued Engineering Work Requests IR 05000324/19900221990-07-10010 July 1990 Insp Repts 50-324/90-22 & 50-325/90-22 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Planning & Technical Issues Associated W/Recirculation Sys Inlet & Core Spray Sys safe-ends & Piping Replacement IR 05000324/19900211990-06-26026 June 1990 Insp Repts 50-324/90-21 & 50-325/90-21 on 900521-25.No Violations or Deviations Noted.Major Areas Inspected: Followup of Diagnostic Evaluation Team Findings IR 05000324/19890301989-09-28028 September 1989 Partially Withheld Insp Repts 50-324/89-30 & 50-325/89-30 on 890904-08 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Records & Repts, Protected & Vital Area Access Controls & Alarm Stations IR 05000324/19890221989-09-22022 September 1989 Revised Pages to Insp Repts 50-324/89-22 & 50-325/89-22 ML20248C8911989-09-18018 September 1989 Insp Repts 50-324/89-24 & 50-325/89-24 on 890814-18.No Violations or Deviations Noted.Major Areas Inspected: Corrective Actions in Response to Previous Insp Findings Re Environ Qualification of Electrical Equipment & LER 84-16 IR 05000324/19890201989-09-14014 September 1989 Safety Insp Repts 50-324/89-20 & 50-325/89-20 on 890801-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, 10CFR21 Reporting & Onsite LERs Review IR 05000324/19890271989-09-14014 September 1989 Partially Withheld Insp Repts 50-324/89-27 & 50-325/89-27 on 890824-25 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel ML20247D7241989-09-0606 September 1989 Insp Repts 50-324/89-22 & 50-325/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Open Items,Especially Issue of Svc Water Lube Water Support Operability IR 05000324/19890141989-08-28028 August 1989 Insp Repts 50-324/89-14 & 50-325/89-14 on 890622-0731. Violations Noted.Major Areas Inspected:Maint & Surveillance Observations,Esf Sys Walkdown,Rosemount Analog Transmitter Trip Unit Failures & Onsite & in-ofc LER Reviews IR 05000324/19890231989-08-16016 August 1989 Partially Withheld Insp Repts 50-324/89-23 & 50-325/89-23 on 890803-04 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel IR 05000324/19890181989-08-10010 August 1989 Insp Repts 50-324/89-18 & 50-325/89-18 on 890710-14. Violation & Unresolved Item Noted.Major Areas Inspected: Snubber Surveillance Program,Licensee Identified Items & Licensee Action on Previous Insp Findings IR 05000324/19890211989-08-0808 August 1989 Partially Withheld Insp Repts 50-324/89-21 & 50-325/89-21 on 890720-22 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipments of Irradiated Fuel IR 05000324/19890171989-07-27027 July 1989 Insp Repts 50-324/89-17 & 50-325/89-17 on 890710-14.No Violations Noted.Major Areas Inspected:Radiological Effluents,Plant Chemistry & Environ Monitoring IR 05000324/19890161989-07-24024 July 1989 Partially Withheld Insp Repts 50-324/89-16 & 50-325/89-16 on 890626-30 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security program.Non-cited Violation Noted Re Inattentive Guard ML20247L2421989-07-19019 July 1989 Insp Repts 50-324/89-11 & 50-325/89-11 on 890522-26 & 0620-22.Violations Noted.Major Areas Inspected:Licensee Methods of Meeting Requirements of 10CFR50,App R,Sections Iii.G Iii.J & Iii.L for Safe Shutdown Capabilities IR 05000324/19890151989-07-12012 July 1989 Insp Repts 50-325/89-15 & 50-324/89-15 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Rcic, F013 Valve Replacement,Temporary Instruction 2500/27,IE Bulletin 88-05,inspector Identified Items & LERs IR 05000324/19890131989-06-26026 June 1989 Insp Repts 50-324/89-13 & 50-325/89-13 on 890522-24.No Violations or Deviations Noted.Weaknesses Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Preparedness Exercise & Associated Critique IR 05000324/19890101989-06-14014 June 1989 Insp Repts 50-324/89-10 & 50-325/89-10 on 890508-12.No Violations or Deviations Noted.Major Areas Inspected:Ie Bulletins 79-02 & 79-14,Mark I Containment & Plant Unique Analysis Rept IR 05000324/19890091989-06-0202 June 1989 Insp Repts 50-324/89-09 & 50-325/89-09 on 890418-0515.No Violations Noted.Weakness Noted Re Failure to Convey Two Potential Concerns to Technical Support Staff.Major Areas Inspected:Svc Water Design Deficiencies & LER Review IR 05000324/19890071989-05-0808 May 1989 Insp Repts 50-324/89-07 & 50-325/89-07 on 890316-0417. Violation Noted Re Cracked Environmentally Qualified Cable Insulation on Acoustic Monitor.Major Areas Inspected:Onsite LER Review,Tmi Action Items & QA Program Implementation IR 05000324/19890011989-05-0303 May 1989 Insp Repts 50-324/89-01 & 50-325/89-01 on 890109-13 & 23-27. Violations Noted.Major Areas Inspected:Maint Program & Implementation IR 05000324/19890061989-04-17017 April 1989 Insp Repts 50-324/89-06 & 50-325/89-06 on 890306-10.No Violations & Deviations Noted.Major Areas Inspected: IE Bulletin Followup & Action on Previous Insp Findings IR 05000324/19890081989-04-0707 April 1989 Partially Withheld Insp Repts 50-324/89-08 & 50-325/89-08 on 890313-17 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Power Supply ML20244C9821989-04-0606 April 1989 Insp Repts 50-324/89-05 & 50-325/89-05 on 890201-0315. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification,Esf Sys Walkdown & Onsite Licensee Event Repts Reviews ML20235W2161989-02-27027 February 1989 Insp Repts 50-324/89-02 & 50-325/89-02 on 890101-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, Flow Restricting Orifices & Onsite LER Review IR 05000324/19890031989-02-10010 February 1989 Insp Repts 50-324/89-03 & 50-325/89-03 on 890123-27.No Violations Noted.Major Areas Inspected:Followup to Operational Performance Assessment Conducted on 880627-0715, Described in Insp Repts 50-324/88-19 & 50-325/88-19 IR 05000324/19890041989-02-10010 February 1989 Insp Repts 50-324/89-04 & 50-325/89-04 on 890117-20 & 30.No Violations Noted.Major Areas Inspected:Review of Emergency Plan & Implementing Procedures,Emergency Facilities, Equipment,Instrumentation & Supplies ML20235R3421989-01-25025 January 1989 Insp Repts 50-324/88-200 & 50-325/88-200 on 880926-1007. Technical Inaccuracies Noted.Major Areas Inspected:Emergency Operating Procedures,Procedures & Plant Operations Re Human Factors & Primary Containment Venting Procedures IR 05000324/19880371988-11-25025 November 1988 Insp Repts 50-324/88-37 & 50-325/88-37 on 881017-19 & 27. Violation Noted.Major Areas Inspected:Emergency Preparedness Exercise IR 05000324/19880381988-11-23023 November 1988 Insp Repts 50-324/88-38 & 50-325/88-38 on 881001-31. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification & Onsite Followup of Events IR 05000324/19880341988-11-0404 November 1988 Safety Insp Repts 50-324/88-34 & 50-325/88-34 on 880901-30. Violations Noted.Major Areas Inspected:Maint Observation, Surveillance Observation,Operational Safety Verification, 10CFR21 Followup & LERs Review IR 05000324/19880361988-10-28028 October 1988 Insp Repts 50-324/88-36 & 50-325/88-36 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected:Mark I Containment long-term Program Mods.Three Unresolved Items Identified,Including Suppression Pool Temp IR 05000324/19880351988-10-0606 October 1988 Partially Withheld Insp Repts 50-324/88-35 & 50-325/88-35 on 880912-16 (Ref 10CFR2.790(d) & 73.21).No Violations Noted. Major Areas Inspected:Program Audit,Records & Repts,Power Supply & Training & Qualification IR 05000324/19880291988-10-0303 October 1988 Insp Repts 50-324/88-29 & 50-325/88-29 on 880808-31.No Violations or Deviations Noted.Major Areas Inspected:Maint Observation,Surveillance Observation,Operational Safety Verification,Review of LERs & Unresolved Items 1990-09-17
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999 PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load IR 05000324/19983001998-06-15015 June 1998 NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition ML20197H1691997-12-0808 December 1997 Notice of Violation from Insp on 970928-1108.Violation Noted:On 970923,torus Master clearance,2-97-555 Was Not Adequate to Prevent Draining of Water Into Unit 2 Torus 1999-09-15
[Table view] |
See also: IR 05000324/1988014
Text
~
s
.
'
' '4farg# UNITED STATES
'o NUCLEAR REGULATORY COMMISSION
"7"s
. TA REGION 11
hs
101 MARIETTA STRE ET, N.W.
ATL ANT A, G EORGI A 30323
'%/ e
.....
Report No. 50-325/88-14 and 50-324/88-14
Licensee: Carolina Power and Light Company
P. O. Box 1551
Raleigh, NC 27602
Docket No. 50-325 and 50-324 License No. DPR-71 and DPR-62
Facility Name: Brunswick 1 and 2
Inspection Conducted: March 1 - 31, 1988
Inspector: W ! f on s ,.* : / / )
W. H. Ruland g["-
k f/$88
Date' Signed
Accompanying Personnel: S. M. Shaeffer
R. B. Latta
E. H. Girard
Inspector:
(Paragraph 10 . .
tN1,
-
(hk.
Date' Signed
Approved By: J .
)
P. E. Fredrickson, Section Chief
e Mb
Bate' Signed
Reactor Projects Section 1A
Division of Reactor Projects
SUMMARY
Scope: This routine safety inspection by the resident inspector and others
involved the areas of followup on previous enforcement matters, maintenance
observation, surveillance observation, operational safety verification,
in-office Licensee Event Report (LER) review, followup on inspector identified
and unresolved items, plant modifications, allegation followup, and unusual
events.
Results: Three Unit i violations were identified: Failure to determine reactor
vessel pressure and shell temperature every 30 minutes during plant heatup;
failure to verify position of an unlocked manual CAD valve in its correct
position every 31 days; and failure to perfonn a 10 CFR 50.59 evaluation.
A potentially significant safety issue was identified by the licensee regarding
operator inattention during shutdown conditions. A licensed operator
unknowingly allowed reactor coolant system temperature increase 90 degrees.
This item was identified as a licensee-identified violation.
hDj ]ggCK22 88050s
O 05000324
DCD
..
.a . I
,
.
,
REPORT DETAILS
1. Persons Contacted
Licensee Employees
W. Biggs, Principal Engineer
- E. Bishop, Manager - Operations
- J. Brown, Res. Engineer - Engineering
Callis, Onsite
T. Cantebury, Licensing
Mechanical Engineer -Supervisor
Maintenance Licensing Unit
(& Nuclear
1) Fuel
G. Cheatham, Manager - Environmental & ladiation Control
R. Creech, I&C/ Electrical Maintenance Supervisor (Unit 2)
- C, Dietz, General Manager - Brunswick Nuclear Project
W. Dorman, Supervisor - QA
_
- R. Eckstein, Manager - Technical Support
- K. Enzor, Director - Regulatory Compliance
R. Groover, Manager - Project Construction
W. Hatcher, Supervisor - Security
A. Hegler, Superintendent - Operations
R. Helme, Director - Onsite Nuclear Safety - BSEP
J. Holder, Manager - Outages
- P. Howe, Vice President - Brunswick Nuclear Project
- L. Jones, Director - Quality Assurance (QA)/ Quality Control (QC)
- M. Kesmodel, Supervisor - Document Control
R. Kitchen, Mechanical Maintenance Supervisor (Unit 2)
J. Moyer, Manager - Training
G. Oliver, Manager - Site Planning and Control
J. O'Sullivan, Manager - Maintenance
B. Parks, Engineering Supervisor
- R. Poulk, Senior NRC Regulatory Specialist
- D. Queener, Principal Engineer - Environmental & Radiation Control
J. Smith, Manager - Administrative Support
- J. Titrington, Principal Engineer - Operations
V. Wagoner, Director - IPBS/Long Range Planning
- R. Warden, I&C/ Electrical Maintenance Supervisor (Unit 1)
D. Warren, Acting Engineering Supervisor
B. Wilson, Engineering Supervisor
- T. Wyllie, Manager - Engineering and Construction
Other licensee employees contacted included construction craf tsmen,
engineers, technicians, operators, office personnel, and security force
members.
- Attended the exit interview
-
,
..
ms ; '. .
'
.
2
2. Exit Interview (30703)
The inspection scope and findings were summarized on March 31, 1988, with
those persons indicated in paragraph 1. The inspectors described the
areas inspected and discussed in detail the inspection findings listed
below. Dissenting comments were not received from the licensee.
Proprietary information is not contained in this report.
Item Number Description / Reference Paragraph
325/88-14-01 VIOLATION - Missed Surveillance of Reactor Vessel
Temperature and Pressure During Inadvertent
Heatup (paragraph 8.a). (A licensee identified
violation was also reviewed.)
325/88-14-02 VIOLATION - Surveillance Procedure Failed to
Check a CAD Valve Position (paragraph 8.c).
325/88-14-03 VIOLATION - Failure to Perform 10 CFR 50.59
Evaluation On Service Water System (para-
graph 8.b).
325,324/88-14-04 IFl - Correction of CAD System Hardware Problems
(paragraph 8.c).
Note: Acronyms and abbreviations used in this report are listed in
paragraph 12.
3. Followup on Previous Enforcement Matters (92702)
(CLOSED) Violation 325/86-29-01; Improper Temporary Revision to OP-03
When Operating EPA Breakers, response dated January 2, 1987. The
inspectors reviewed OP-03, Revision 8 for Unit 1 and OP-03, Revision 19
for Unit 2 and detarmined that these procedures had been modified to
provide for the opening of the EPA breakers prior to opening the MG set
output breaker. These revisions adequately address the issue identified
in the violation. This item is closed.
(CLOSED) Violation 325/87-31-01 and 324/87-35-01; Inadequate DG Surveill-
ance Procedure - TCV Not in Restoration Lineup, response dated November
25, 1987. The inspectors reviewed PT-12.2A, Revision 32, PT-12.2B,
Revision 31, PT-12.2C, Revision 31, and PT-12.2D, Revision 33 and deter-
mined that these procedures had been modified to include the subject
temperature control valves in the system restoration valve lineup.
Additionally, these procedures have been revised to provide operational
information regarding normal and abnormal valve operation and required
corrective action. The revised pts adequately address the issue identi-
fied in the violation. This item is closed.
. _ _
,
'
..
. .
., ,
.
3
)
4. MaintenanceObservation(62703)
The inspectors observed maintenance activities, interviewed personnel, and
reviewed records to verify that work was conducted in accordance with
approved procedures, Technical Specifications, and applicable industry
codes and standards. The inspectors also verified that: redundant
components were operable; administrative controls were followed; tagouts
were adequate; personnel were qualified; correct replacement parts were
used; radiological controls were proper; fire protection was adequate;
quality control hold points were adequate and observed; adequate post-
maintenance testing was performed; and independent verification require-
ments were implemented. The inspectors independently verified that
selected equipment was properly returned to service.
Outstanding work requests were reviewed to ensure that the licensee gave
priority to safety-related maintenance. '4umerous maintenance items were
reviewed throughout the reporting period. The inspectors observed /
reviewed, in detail, those portions of the following maintenance activi-
ties:
86-BAFF1 1-CAC-V10 Outboard Drywell Purge Exhaust Valve
88-AIYB1 DG No. 3 Oscillations / Troubleshooting
No significant safety matters, violations, or deviations were identified.
5. SurveillanceObservation(61726)
The inspectors observed surveillance testing required by Technical Speci-
I fications. Through observation, interviews, and record review, the
l inspectors verified that: tests conformed to Technical Specification
! requirements; administrative controls were followed; personnel were
qualified; instrumentation was calibrated; and data was accurate and
complete. The inspectors independently verified selected test results and
proper return of equipment to service.
,
'
The inspectors witnessed / reviewed portions of the following test activi-
ties:
1MST-APRM12W APRM Channel B, D, and F Functional Test
IMST-BATT11Q Batteries, 125 VDC Quarterly Operability Test
IMST-HPCl22M Steamline Low Pressure Channel Calibration
IMST-HPCI26M HPCI Suppression Pool High Level Instrument Channel
Calibration
2MST-HPCl27M HPCI and RCIC CST Low Water Level Instrument Channel
Calibration
E .
.
.,
'
.
,
4
2MST-RPS23R RPS High Reactor Pressure Instrument Channel Calibra-
tion
2MST-SEIS21R SMA-3 Seismic Monitoring System Channel Calibration
No significant safety matters, violations,.or deviations were identifie6
6. Operational Safety Verification (71707)
The inspectors verified that Unit 1 and Unit 2 were operated in compliance
with Technical Specifications and other regulatory requirements by direct
observations of activities, facility tours, aiscussions with personnel,
reviewing of records and independent verification of safety system status.
The inspectors verified that control room manning requirements of 10 CFR
50.54 and the Technical Specifications were met. Control operator, shift
supervisor, clearance, STA, daily and standing instructions, and jumper /
bypass logs were reviewed to obtain information concerning operating
trends and out of service safety systems to ensure that there were no
conflicts with Technical Specifications Limiting Conditions for Opera-
tions. Direct observations were conducted of control room panels, instru-
mentation, and recorder traces important to safety to verify operability
and that operating parameters were within Technical Specification limits.
The inspectors observed shift turnovers to verify that continuity of
system status was maintained. The inspectors verified the status of
selected control room annunciators.
Operability of a selected Engineered Safety Feature division was verified
weekly by ensuring that: each accessible valve in the flow path was in
its correct position; each power supply and breaker was closed for
components that must activate upon an initiation signal; the RHR subsystem
cross-tie valve for each unit was closed with the power removed from the
valve operator; there was no leakage of major components; there was proper
lubrication and cooling water available; and a condition did not exist
which might prevent fulfillment of the system's functional requirements.
Instrumentation essential to system actuation or performance was verified
operable by observing on-scale indication and proper instrument valve
lineup, if accessible.
The inspectors verified that the licensee's health physics policies /
procedures were followed. This included observation of HP practices and a
review of area surveys, radiation work permits, posting, and instrument
i calibration.
The inspectors verified that: the security organization was properly
manned and security personnel were capable of performing their assigned
functions; persons and packages were checked prior to entry into the
protected area; vehicles were properly authorized, searched and escorted
within the PA; persons within the PA displayed photo identification
badges; personnel in vital areas were authorized; and effective compen-
saton measures were employed when required.
- - . _
..
.
.; . .
.,
.
5
The inspectors also observed plant housekeeping controls, verified
position of certain containment isolation valves, checked a clearance, and
verified the operability of onsite and offsite emergency power sources.
No significant safety matters, violations, or deviations were identified.
7. In Office Licensee Event Report Review (90712)
The listed LER was reviewed to verify that the information provided met
NRC reporting requirements. The verification included adequacy of event
description and corrective action taken or planned, existance of poter,tial
generic problems and the relative safety significance of the event.
(CLOSED) LER 2-88-03; Auto-Isolation of Reactor Water Cleanup System
Inlet Outboard Isolation Valve 2-G31-F004 With Reactor Defueled. The
inspector reviewed the event and had no questions. This iten is closed.
No significant safety matters, violation,, or deviations were identified.
8. Followup on Inspector Identified and Unresolved Items (92701)
a. (CLOSED) Unresolved Item 325/88-01-03; Inadvertent Heatup During
Cold Shutdown. The inspector reviewed the OER which described the
event and documented the licensee's root cause determination and '
corrective actions. The licensee found two causes for the event:
(1) operator inattentiveness; (2) the SR0 directed the control ;
operator to throttle the heat exchanger outlet valve, 1-E11-F003B, to
control temperature. This valve has a key lock switch on the main *
control board that only has open and closed positions. The operator
had to place the switch in a "dead" position to throttle the valve.
This action, as well as throttling the F003B valve, was not
authorized by the system operating procedure. <
i
The actions initiated by the licensee to prevent recurrence included
disciplinary action for the operators involved, on-shift training, ;
,
evaluation of switch replacement for the E11-F003B valve, development !
of a routine pre-outage training package, proceduralization of key
l parameter monitoring frequency, and evaluation of the need for
l appropriate alarms during shutdown conditions.
The inspector reviewed real time training package 88-1-8 prepared for
j the event and found it acceptable. The licensee identified the
failure to follow the RHR operating procedure and met the require- .
ments of 10 CFR 2 Appendix C, for licensee identified violations. '
Therefore, no violation will be issued for the failure to follow
procedure. However, during the heatup, the licensee failed to
determine that the reactor vessel pressure and shell temperature were
. within limits every 30 minutes per TS 4.4.6.1.1. Since the licensee
I failed to identify the missed surveillance, a Violation is being
l Issued on this particular item: Missed Surveillance of Reactor
Vessel Temperature and Pressure During Inadvertent Heatup
<
(325/88-14-01).
?
- , ,, -~ . , . - - . - - , _ - . - - . - , . , , - - - - - - - - - - - , - , , . - - - , - - . .
-,
'
.
..
..', . . ,
-
.
6
b. (OPEN) Unresolved Item 325/88-05-01 and 324/88-05-01; Service Water
System Operating Mode Concerns. Further inspector icview revealed
that no 10 CFR 50.59 review was performed as a result of the problem
with the V106 valve prior to Unit I start-up on February 20, 1988.
FSAR table 9.2.1-1, Service Water Flow Distribution - One Reactor
Plant, lists Reactor Building Ct'J Heat Exchanger flow rate from the
nuclear service water header during the first 10 minutes following a
Loss of Coolant Accident as zero gallons per minute. Based on the
information that the licensee had received regarding how the service
water system could operate during the above time, it was possible
with V106 failed open, that flow through the RB CCW HX would be
greater than zero gallons per minute. Although no mechanical or
electrical components were modified, this information did constitute
a change to the Service Water System in that failure of the V106
valve would cause the system to not perform as described in the FSAR.
This change necessitated a 10 CFR 50.59 safety evaluation, prior to
restart of the unit, to determine whether an unreviewed safety
question existed. The licensee first became aware of this change in
the facility ir> February 1988. A 10 CFR 50.59 evaluation was not
performed until March 22, 1988, after being identified by the inspec-
tion in February 1988. Failure to perform a written 10 CFR 50.59
safety evaluation is a Violation: Failure to Perform 10 CFR 50.59
Evaluation On Service Water System (325/88-14-03).
The licensee had reviewed the issue at PNSC meeting 88-018 held on
February 12, 1988, and concluded that an operability concern did not
exist. Actior4 items were established to resolve the issue perman- l
ently. After questions by the inspector, the licensee completed a
JC0 with a 10 CFR 50.59 evaluation (EER-88-167) for the SW V106 issue
on March 23, 1988. The EER took credit for the licensee's interim
action of limiting RB CCW SW flow to 5,000 GPM. Based on the SW pump
curve, with SW flow assumed at 8,600 GPM, the total dynamic head of
the pump would be about 108 feet, equivalent to 48 PSIG. This is
above the 40 PSIG low header pressure autostart signal for another
NSW pump. This portion of the item remains unresolved pending review
by the licensee and inspector of the SW design data and a permanent
fix, if required.
c. (CLOSED) Unresolved Item 325/88-05-05 and 324/88-05-05; CAD System
Discrepancies. The associated issues were identified during a CAD
system walkdown, and are addressed below.
The inspector found valve CAC-V168 unlocked in the open (required)
position. All unlocked valves in the system's flow path shall be ,
demonstrated to be operable at least once per 31 days by verifying
valve position. Failure to observe the valve position is a violation
of TS 4.6.6.2.a.2. The missed surveillance was due to an inadequate
procedure, in that valve CAC-V168 does not appear on PT-16.1,
Rev.12, Section 7.1.3, System Operability Verification Checklist.
This valve is a flow path valve in that closure of the valve could
prevent the system from injecting nitrogen into the drywell or torus
after a single valve failure. The inspector reviewed the history of
,
-- - . -
- - . . - . _. -
c *
1,..
'
. . ,
.- .
'
.. .
'
7
p
all pericdic test procedures associated with the CAD system for
accuracy and timeliness. No other surveillance problems were noted.
This is a Violation: Surveillance Procedure r ailed to Check a CAD ;
VelvePosition,(325/88-14-02).
.
On-February 24, 1988, the inspector observed that the loop A and 0
CAD vessel pressure indicators, PI-2703 and PI-2704, exceeded the
maximum allowable working pressure of the CAD vessel which is 100 ;
PS!J. The pressure indicators were above their maximum gauge ;
'
graduations-(greater than 100 PSIG). The process requirement for the
CAD system is between 80 and 90 PSIG. The CAD vessel had exceeded i
these values due to the evaporation of liquid nitrogen within the
vessel. The design of the system incorporates three separate
pressure relief mechanisms: (1) two pressure control valves.
(PCV-2706 and 2707) with build-up coils designed to maintain 85 psig
in the CAS tank; (2) PCV-2705 relieves pressure to at-osphere at 90
psig; and (3) pressure safety valve PS-V3 relieves to atmosphere at
100 psig. There was no evidence that any #f these functions were
operating within their setpoints. The licensee's engineering group
'
has raceemer.ded that the relief setpoints be calibrated, and if not
within tolerance, the valves should be rebui't or exchanged.
The licensee showed the inspector the vendor's hydrostatic test
results. The test was performed at 176 PSIG. Thus, no safety
concern exists regarding the CAD +ank integrity. Since the licensee
had work requests written on the above problems and the safety
significanca is small, no violation occurred. The CAD system, -
(lthough addressed in Technical Specifications, is not necessary to :
prevent any explcsive mixture in a pest-accident containment environ-
This was shown by generic analysis done by BWROGs for the
ment.
licensee's hydrogen recombiner rule response. The CAD system would ,
only be needed post-LOCA if the containment '.ad not been inerted.
This occurs only during reactor startups and shutdowns. l
Minor support problems were identified on the liquid nitrogen lines
surrounding the CAD vessel loop 8 end. Apparently the icis.g of the
nitrogen lines has caused two wood block supports to deteriorate &nd
i become ncn-functional. The inspector observed tha' another support
was left disconnected near valve BYCV-2716. The licensee has issued
work requests to correct the deficiencies. The licensee has also
'
'
been informed of varimus housekeeping items such as ground cables
draped over nitrogen lines and debris in the control cabinets.
.
Due to ., axtent >' the deficiences, the inspector will followup on ;
'
the -ns e's cr' '"e actions. This is an Inspector Followup
Itr l e- H on ,
' System Hardware Problems (325/88-14-04 and
< 324: s
!
!
)
4
-r - - , .-,v.-, - - , - . , . , - ~ - - - - - - . - . , - -.,w-- ,---.~.---a.-.--,a.-,e. ----------------,.,a - . .vnr --
- -. -. . .-
,...
i
. .
-
. .
!
8
,
d. (CLO5ED) Inspector Followup Item 325/86-24-04 and 324/86-25-04;
_ OP-19 Revisions for HPCI CST Recirculation Mode. The licensee .
performed SP-66-080, HPCI System Operability Test, on October 9,
1986. The test checked the operation of the HPCI turbine control
system during three conditions: operating in CST full flow test mode;
only on the minimum flow valve; and a dual path mode. Problems with
the governor ccntrol were noted during certain step changes in the
flow demand signal made by the operator. The turbine RPM was hunting
with 1,000 RPM swings with a reduced flow demand signal of 3,000 GPM.
- A portion of the governor, designated EGM, was retalibrated and
SP-86-080 re-performed with no anomalies noted. On November 8, 1986,
'
the licensee replaced, under DR-86-0140, the EGM with a newer design,
further improving the control system.
The inspector reviewed SP-86-080, interviewed plant personnel, and
reviewed the current revision (13) of 1-0P-19, HPCI System Operations
Procedure. The licensee has added sections to-describe the reactor
pressure control mode of the HPCI system. Also, while switching
modes, the procedure requires the operator to take the HPCI flow
controller to manual. Based on the inspector's review of the l
licensee's actions, this item is closed. [
e. (CLOSED) Inspector Followup Item 325/87-42-08 and 324/87-43-08; ,
Submission of TS Amendment Request for RWCU Isolation Response Time.
The licensee submitted the request for TS amendment on February 29,
1988. This item is closed.
f. (CLOSED) Inspector Followup Item 325/88-05-03 and 324/88-05-03; Sand
Introduced Into Tcrus/ Vacuum Breakers From Failed Inerting Line. The
inspectors reviewed the circumstances of the line break and the
4
adequacy of the corrective actions taken by the licensee. The review
.
was conducted through visual observation of the vacuum breakers and
t
the replacement inerting line, discussions with the Mechanical :
Discipline Group Project Engineer, and review of the following Work
Request and LLRT records:
Unit 1 Work Requests
WR/JO 88-AELT1
WR/JO 88-AEIW1
WR/JO 88-AEIU1
jnit 2 Work Requests g
i
WR/JO 88-AENW1
WR/JO 88-AFAC1 !
WR/JO 88-AAUH1
WR/JO 88-AAVII
.
. - -. -- - . - - - , , , - . - - - ,
--
--- - - , - - - - - - - - . - - - - - - - - - - .
'
- 9 ;
s:, . ..
. .
. .
9
Unit 1 LLRTs
PT-20.3.71 performed 1/10/88 on V17
PT-20.?.70 performed 1/10/88 on V16
PT-20.3.71 performec' :','10/88 on V17
PT-20.3.70 performed 2/08/88 on V16
Unit 2 LLRTs
PT-20.3.71 performed 2/11/88 on V17
PT-20.3.70 performed 2/11/88 on V16
Relevant information and findings obtained by the inspectors:
(1) The inerting line failure was apparently the result of excessive
cooling and resultant stress in the line. The excessive cooling
was due to the introduction of insufficiently heated nitrogen
frem a malfunctioning vaporizer.
(2) S.nd
- did not reach tra Unit 2 vacuum breakers, but rather was
found on the inboard side of closed butterfly valves (V16 and
V17) located inboard of the vacuum breakers. Also, the sand
probably did not contribute to the LLRT failures. The butterfly
valves are normally closed and sand could not easily get onto
the seals. The project engineer stated that the butterfly
valves had a past history of excessive leakage and that they had
actually leaked less than in past tests. As of March 4, mainten-
ance on one valve had resulted in acceptable leakage and the
other showed leakage just in excess of the specified limit. The
identical Unit 1 valves passed the LLRTs and required no repair.
(3) The inerting line failure did not occur on January 4, as
initially thought. In order fer the sand to have reached Unit 2
valves V16 and V17, the failura would have had to occur on or
before the Unit 2 shutdown (about January 1,1988).
(4) An attempt to repair the uderground inerting line proved
unsuccessful. When an identical break area was repaired the
! line continued to exhibit leakage; indicating an additional
j break or breaks. Most of the underground line has now been
l
bypassed. A temporary replacement line installed above ground
is now being used. (This is a non-safety-related line.)
(5) The sand that entered the Containment Atmosphere Control System
through the break in the inerting line was found at the
following locations:
Almost 2 quarts in the Unit i drywell near the 18-inch
inerting line opening (underground line was 8-inch size).
_ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ _ - - - - - - - - - -- - - - - - --- J
.-- . .. . .. ,
b*.
.,
.
'
.
10
- 810wn into torus of Unit 1;(from 20-inch line).
None found in drywell or torus of Unit 2.
~' - Approximately 2 cups of-sand / water slurry was found in the
_
Unit 2 pipe between V16 and V17.
Approximately 2 gallons of slurry was found between Unit i
valves V16 and V17.
About a handful of dry sand near V5 (downstream side) on
Unit 1. -
The inspectors had no further questions. This' item is closed.
g. (OPEN) Inspector Followup Item 325/88-05-04 and 324/88-05-04,
Hydrogen Leak in Turbine Building Pipe Tunnel. The inspectors "
reviewed Operating Experience Report No.88-024 and conducted an
inspection of the rad-waste pipe tunnel and the electrical tunnel
located above the pipe tunnel. The inspectors determined that the
pre-installation pressure test requirements had been modified to
preclude pressure testing of valves on their back seat, that
temporary hydrogen monitors will be installeo above the subject
hydrogen valves per SP-88-01 (not yet accomplished as of March 29),
and that routine system checks for hydrogen leaks were being
conducted.
The potential for hydrogen intrusion into safety-related equipment
I areas does not represent a hazard in the pipe tunnel as currently
configured. This item remains open pending the inspector's review of
other possible hydrogen interactions with safety-related equipment.
One potentially significant safety matter regarding operator inattention
during plant shutdown conditions was identified. Three violations, and no
deviations were identified.
9. Plant Modifications - Unit 2(37700)
The inspector reviewed PM-87-128, Weld Overlay Repair, Field Revisions 30
and 31, Repair of CRD Line Leaks, to verify compliance with ENP-03, Rev.
35, Plant Modification Procedure. The inspector observed the pipe replace-
ment and repair, which used cryogenic couplings to connect the new pipe.
The inspector also reviewed purchase ordars and specifications related to
the cryogenic fittings as well as ALARA ;we-job reviews conducted for the
job. Personnel interviews of selected eng'neering ALARA personnel were
also conducted.
. . - _ - - - - - - - - - - - - - - -
. - - _ - _ - - - - _ - _ - _ ---_-- -.----------.-----
.
d' * 4
4
1
11
. t
The licensee replaced the CRD lines after leaks were found on insert and
withdraw lines inside containment during the reactor coolint system
hydrostatic test. Small weeping leaks were found on 5 lines on March 19,
1988. Additional CRD line leaks were found on subsequent inspections;
all leaks were repaired. A-brown discoloration on the lines was found, by i
CP&L's laboratory, to contain chlorides and sulfur. Two regional
inspectors reviewed the licensee's metallurgical investigation at the lab
'
(see report 325,324/88-17). The inspector will continue to follow the
licensee's resolution as cart of the LER closecut. .
No violations or deviations were identified.
10. Allegation No. RII-88-A-8011
This allegation was received by the Senior Resident Inspector on
February 24, 1988, and later, on February 29, was repeated by the alleger
to the Region II Allegation Coordinator in Atlanta, Georgie. On March 23,
an inspector conducted an announced inspection of the allegation which .
involved a Shift Operations Supervisor allegedly not being fit for duty.
The inspector reviewed several pertinent documents to include the Quality ,
, Check Report No. B-88-01-10/QCR No.14221, and met with the following
individuals.
C. Dietz - Plant General Manager
A. Bishop - Plant Operations Manager
S. Choplin - Director of Personnel Relations
- E. Enzor - Director of Regulatory Compliance
W. Ruland - Senior USNRC Resident Inspector
There is no USNRC regulation governing Fitness for Duty. However, the
licensae's policy, Drug and Alcohol Abuse Statement of Practice, states...
"The use of alcoholic beverages by an employee on or away from Company 1
property that may adversely affect the employee's job performance, or that
may n eflect unfavorably upon public or governmental confidence in the
manner in which the Company carries out its responsibilities may result in
disciplinary action, including possible termination".
- ha inspector learned that a similiar allegation had been anonymously
telephoned to the licensee's Quality Check Program during the evening 7
hours of January 25. Within a few hours after receipt, the Plant General i
Manager instructed his operational staff to conduct an immediate investi-
gation which included interviews of operation supervisors who had close
contact with the Shift Operations Supervisor during the shift in question.
The licensee concluded the allegation was without merit.
.
Based upon interviews and a review of documentation the inspector was
( unable to substantiate the allegation and, given the absence of an NRC ,
l regulation governing Fitness for Duty, found the licensee to have been
- responsive to this allegation.
'
i No significant safety matters, violations, or deviations were identified.
<
a
.
-
.,.
?..
.
.
r'.
.
12
11. Unusual Event / Fire (93702)
The licensee declared an Unusual Event for two minutes on March 9, 1988,
at 2:40 p.m., after a fire could not be confirmed out within 10 minutes.
The drywell chiller power cables (non-safety) on the Radwaste Building
roof were reported on fire at 2:27 p.m. The cable insulation had chafed
on the roof edge. The fire was announced at 2:28 p.m., and the fire
brigade was dispatched. The cables were de-energized at 2:31 p.m., and
the fire reported out at 2:36 p.m., by an I&C technician. Since the shift
fire brigade commander did not report the fire out vithin 10 minutes, the
licensee declared an Unusual Event per Emergency Frxecure PEP-2.1,
Revision 21, Initial Actions, which requires the declaration of an Unusual
Event with a fire within the protected area lasting more than ten minutes.
The shif t fire coannander reported the fire out at 2:42 p.m. No safety-
related equipment was affected by the fire.
Based on interviews with plant personnel, record and log review, the
inspector concluded that the licensee complied with their emergency
procedures.
No significant safety matters, violations, or deviations were identified.
12. List of Abbreviations for Unit 1 and 2
ALARA As Low As Reasonably Achievable
A0 Auxiliary Operator
APRM Average Power Range Monitor
BWROGS Boiling Water Reactor Owners Group
BSEP Brunswick Steam Electric Plant
CAC Containment Atmospheric Control
CAD Containment Atmospheric Dilution
CCW Closed Cooling Water
CRD Control Rod Drive
CST Condensate Storage Tank
DC Direct Current
DG Diesel Generator
DR Direct Replacement
EER Engineering Evaluation Report
ENP Engineering Procedure
EPA Electrical Protection Assembly
ESF Engineered Safety Feature
F Degrees Fahrenheit
FSAR Final Safety Analysis Report
GPM Gallons Per Minute
HP Health Physics
HPCI High Pressure Coolant Injection
HX Heat Exchanger
I&C Instrumentation and Control
IE NRC Office of Inspection and Enforcement
IFI Inspector Followup Item
JC0 Justification for Continued Operation
LER Licensee Event Report
__ - . - - -
,_
,
.
..+
. ,. ,
-
.
,
13
LLRT Local Leak Rate Test {
LOCA Loss of Coolant Accident ;
MG Motor Generator
MST Maintenance Surveillance Test
NRC Nuclear Regulatory Comission
NSW Nuclear Service Water
OER Operating Experience Report
OP Operating Procedure
PA Protected Area
PI Pressure Indicator l
PM Plant Modification ;
PNSC Plant Nuclear Safety Committee i
PSIG Pounds per Square Inch Gauge
PT Procedure Test
QA Quality Assurance !
QC Quality Control !
RB Reactor Building
RCIC Reactor Core Isolation Cooling
RHR Residual Heat Removal '
RPM Revolutions Per Minute
l RPS Reactor Protection System
RWCU Reactor Water Cleanup
i SP Special Procedure
l SRO Senior Reactor Operator
'
STA Shif t Technical Advisor
SW Service Water
TC/ Thermostatic Control Valve
TS Technical Specification
URI Unresolved Item
USNRC United States Nuclear Regulatory Comission
V Volt
VID Violation
WR/JO Work Request / Job Order