Insp Repts 50-324/89-04 & 50-325/89-04 on 890117-20 & 30.No Violations Noted.Major Areas Inspected:Review of Emergency Plan & Implementing Procedures,Emergency Facilities, Equipment,Instrumentation & Supplies
ML20235P383
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/10/1989
From: Rankin W, Sartor W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20235P366 List:
References
50-324-89-04, 50-324-89-4, 50-325-89-04, 50-325-89-4, NUDOCS 8903020202
Download: ML20235P383 (5)


Text

-- - - - - - - - - - - -

g 7-77;; - ,

,cyh ~*

' IP '

, ga r.to

.=  % UNITED STATES l[#*~ ,[ NUCLEAR REGULATORY COMMISSION-

'

c;, S REGION 11 101 MARIETTA ST., .

['

I i%*..*,,,, */

'

- ATLANTA, GEORGIA 30323 <

~

FEB 141989 Report.Nos.:l50-325/89-04 and-50-324/89-04

Licensee: . Carolina Power and Light Company, P. 0. Box 1551

.

Raleigh, NC 27602 Docket Nos.: 50-325 and 50-324 License Nos.: DPR-71 and DPR-62 Facility Name: Brunswick 1 and 2-

Inspection Conducted: Jan ary 17-20 and 30, 1989 Inspector:' A A 2-/6/87 Ddte Signed W. M. Sartor, J .

//

Approved by:660 M z//o/99 W. H. Rankin, Acting Chief Dhte Signed Emergency Preparedness Section

',

Emergency Preparedness and Radiological Protection Branch

Division of Radiation Safety and Safeguards

,

'

SUMMARY Scope: This ~ routine, unannounced inspection of - the licensee's emergency preparedness program involved review of the Emergency Plan and implementing procedures; emergency facilities, equipment, instrumentation, and supplies; organization and management' control; training; and independent reviews / audit The ' inspection also included a review of licensee action concerning previous enforcement items and inspector followup item Results: Significant improvements were noted in the licensee's training program for emergency preparedness. As the program matures and improvements'

are made, the training program should become a strengt The licensee is pursuing program enhancements by flowcharting Emergency Action Levels (EALs) to aid in emergency classification which was a problem area during the last NRC observed emergency exercise. No violations or deviations were identifie l l

'

8903020202 890214 PDR ADOCK 05000324 Q PDC ,

__-__-_:___-______ _ _ _ - - - _ - - - _ _ _ _ -

- _ _ - _ _ - - - - - - _ . . - _ _ __ - - -

d ~

- .

.

,

. .

REPORT DETAILS

. Persons Contacte Licensee Employees-

  • K. Altman, Manager, Maintenance
  • A. Cheatham, Manager. Environmental and Radiochemistry
  • Dorman, Supervisor, Quality Assurance
  • K. Enzor, Director, Regulatory. Compliance
  • J. Harness, General Manager
  • A..Hegler, Supervisor, Radwaste
  • R. Helme . Manager, Technical Support
  • B. Houston, Senior Specialist, Emergency Preparedness D. Norton, Engineer, HVAC System B. Saburn, Specialist, Technical 1 Training P. Snead, Senior Engineer, Radiation Control L. Tice, Specialist, Technical Training Other licensee employees contacted during this inspection -included engineers, operators, security force members, technicians, and administrative personne Nuclear Regulatory Commission W. Levis, RI W. Ruland,' SRI
  • Attended exit interview Emergency Plan and Implementing Procedures-(82701)

Pursuant to 10 CFR 50.47(b)(16), 10 CFR 50.54(q), and 10 CFR 50,

-Appendix E,'this area was reviewed to determine whether changes were made to the program since the last routine inspection (August 1988), and to assess the impact of these changes on the overall state of emergency preparednes The inspector reviewed Revision 27 to the Brunswick Steam Electric Plant Emergency ' Response Plan. The revision was promptly submitted to the NRC and the changes did not adversely impact the overall state of emergency preparednes No violations or deviations were identifie . Emergency Facilities, Equipment, Instrumentation, and Supplies (82701)

Pursuant to 10 CFR 50.47(b)(8) and (9),10 CFR 50.54(q), and Section I of Appendix E to 10 CFR 50, this area was inspected to determine whether the licensee's emergency response facilities and other essential emergency

_ _ _ _ - - _ _ _ _ - _ - _ _ _ _ _ _

_ _ - _ - _ _ - _ _ _

..

-

.

,

.

equipment, instrumentation, and supplies were maintained in a state of operational readines Discussions were held with a licensee representative concerning modifications to facilities, equipment, and instrumentation. Since the last inspection, no modifications had been made. The licensee informed the inspector that the Emergency Action Levels (EALs) were being flowcharted to aid in emergency classificatio The inspector selectively examined emergency supplies maintained in a cabinet for the Emergency Operations Facility (E0F). The supplies were found to be properly documented and inventoried on a periodic basi Randomly selected equipment that was checked for operability was found to be fully functional and displayed current calibration sticker No violations or deviations were identifie . Organization and Management Control (82701)

Pursuant to 10 CFR 50.47(b)(1) and (16) and Section IV.A of Appendix E to 10 CFR 50, this area was inspected to determine the effects of changes in the licensee's emergency response organization and/or management control systems on the emergency preparedness program, and to verify that such changes were properly factored into the Emergency Plan Implementing Procedures (EPIPs).

The organization and management of the emergency preparedness program were reviewed and discussed with a licensee representativ Particular attention was given to the recent change of the EP Specialist realignment from the Director of Administrative Support to the Director of Regulatory Compliance. Discussions and observations supported the earlier evaluation that the change would not adversely impact the overall emergency preparedness progra No violations or deviations were identifie . Training (82701)

Pursuant to 10 CFR 50.47(b)(2) and (15),Section IV.F of Appendix E to 10 CFR 50, and Section 19 of the Emergency Plan, this area was inspected to determine whether the licensee's key emergency response personnel were properly trained and understood their emergency responsibilitie The inspector reviewed selected training records and interviewed selected personnel. In both cases, an adequate training program appeared to be in i place. A review of the licensee's training modules for selected emergency organization personnel was performed in detai No violations or deviations were identified.

,

- _ _ - - - _ _ _ _ _ - - _ - - - . - - _ . _ _ - - . - - - - _ _ - - _ _ _ - - - - - - - - - - _ _ _ -

E , .

~

,e . .

.

,

.

l LicenseeAudits(82701)

Pursuant to 10CFR50.47(b)(14) and 10 CFR 50.54(t), this area was inspected to determine whether the licensee'had performed an independent review or audit of the emergency preparedness progra The 1988 records of audits of the emergency preparedness program were reviewed. The records reflected that the Quality Assurance Department had conducted an independent audit during the last 12 months and had provided it to corporate and plant management with a letter dated September 12,

-198 The part of the review involving the evaluation for adequacy of interface with State and local governments was provided to the appropriate State and local governments with a letter dated November 30, 1988. The inspector also reviewed the licensee's records on the 1988 Emergency Exercise to determine that an effective system was in place to ensure deficiencies identified were being tracked for correction. The system in place appeared to be adequat No violations or deviations were identifie . Action on Previous Inspection Findings (92702) (92701) (Closed) Violation 50-325, 324/87-23-03: Failure to maintain in effect Section 4.4.2.1 of the Emergency Plan as indicated by the inoperability of the Public Address / Evacuation Alarm System in the Feedwater Pump Room 1A Are The licensee responded on September 4, 1987, and again on October 13, 1987, with a supplemental response. The corrective action included additional guidance and instructions for Security to ensure notification of personnel in areas where Public Address (PA)

modifications were not complete Corrective steps to be taken included the installation of new volume override switches on the remaining approximately 100-125 PA unit During the inspection, documents were reviewed indicating the volume override units had been installed, tested, and declared operational on the Unit 1 Accessible PA System, and on both the Unit 2 Accessible and Inaccessible PA Systems. The inspector was informed that the Unit 1 Inaccessible PA System installation of the volume override units remained on schedule per the October 7,1987 Supplemental Respons The schedule delineated work completion by February 1,1989. On January 30, 1989, a licensee representative informed the inspector that all modifications had been completed and accepted, and the paperwork for same would be provided to the Resident Inspector's office. A telephone conversation with the Senior Resident inspector confirmed the receipt of the documentation for the installation and acceptance of the Unit 1 Inaccessible PA System volume override units. The licensee's corrective action has now been implemented, therefore this issue is close '

- - - _- __ ___ _ ___ _ ______ __-_-_ - ______- _ _ _ _ - ._ _ _ _ _ _ _ _ _ - _ _ - . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _

m t '

, .,ss.' '

'.

.

..

[

l (Closed) InspectorFollow-upItem(IFI) 50-325, 324/87-23-01: Ensure timely training of newly hired E&RC Technicians on Emergency First ;

Ai {

l The inspector reviewed the training records for E&RC technicians i hired since January 1, 198 In all cases, the personnel had !

received prompt emergency first aid trainin j i (Closed) IFI 50-325/87-34-01, 50-324/87-33-01: Inconsistencies in EP Training, i.e., plan, procedures, and actual training all diffe The inspector reviewed the training program and did not find any inconsistencies between the documentation and implementation of the progra (Closed) IFI 50-325, 324/88-37-04: Message Form Not Proceduralize 'i The Emergency Communicator Plant Emergency Procedure (02.6.21) I approved on December 13, 1988 provided for using the three-part memo l when making follow-up notification . Exit Interview The inspection scope and results were summarized on January 20, 1989, with those persons indicated in Paragraph 1. Dissenting comments were not received from the license l l

l i