Advises That No Adverse Findings Identified Based on Review of Proposed Amends to Licenses NPF-11 & NPF-18,changing Tech Specs Re Diesel Generator Lube Oil Mod
ML20138A927
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/09/1985
From: Parker M
ILLINOIS, STATE OF
To: Harold Denton
Office of Nuclear Reactor Regulation
References
DOE-85-156, NUDOCS 8510110141
Download: ML20138A927 (2)


Text

y ~ ~ N,

. - s STATE OF lLLINOIS DEPARTMENT OF NUCLEAR SAFETY 1035 OUTER PARK DRIVE Sr)RINGFIELD 62704 (217) 546-Es100 TERRY R. LASH DIRECTOR October 9, 1985 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555

SUBJECT:

LaSalle Units 1 & 2 Proposed Technical Specification Amendment Involving Diesel Generator Lube Oil Modification License No. WPF-11 & NPF-18 NRC Docket Nos. 50-373 8 50-374

REFERENCE:

H. L. Massin Letter to H. R. Denton Dated August 23, 1985 In Reply Please Refer To: DOE-85-156

Dear Mr. Denton:

The Illinois Department of Nuclear Safety has reviewed the proposed Technical Specificacion Amendment referenced above. We have determined no adverse findings as a result of that review.

However, we feel that the following coments should be addressed:

1.) The testing period for the in-service diesel generators should be specified, i.e. if not 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, what time period?

2.) Will LaSalle station make the available D/G's accessable to the crosstie since all three 0/G's may not be worked on at one time?

k kD g

o

  • Mr. Harold R. Denton Page 2 October 9, 1985 3.) It is uncertain from the Comonwealth Edison submittal whether the vital bus auto load shedding capability has been assured operable within time limitations required to prevent bus voltage degradation. Absent sup[,orting data, the timed auto load shedding capability should be demonstrated.

These comments were verbally conveyed to Mr. A. Bournia (NRC) on October 9, 1985.

'ncer y, M

Michael C. Parker, Chief Division of Engineering MCP:RRM:bkw cc: T. Lash G. Wright S. Swartz J. Keppler, NRC Region III R. Lickus, NRC Region III A. Bournia, NRC Washington, D.C.

H. Massin, CECO i