ML20134G126
| ML20134G126 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 08/19/1985 |
| From: | Parker M ILLINOIS, STATE OF |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| DOE-85-133, NUDOCS 8508230058 | |
| Download: ML20134G126 (1) | |
Text
r STATE OF lLLINOIS DEPARTMENT OF NUCLEAR SAFETY 1035 OUTER PARK DRIVE SPRINGFIELD 62704 (217) 546-8100 TERRY R. LASH o ncran August 19, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C.
20555
SUBJECT:
LaSalle Unit 1 Proposed Technical Specification Change Involving Waiver of 18 Month Surveillance Interval License No'. NPF-11 NRC Docket No. 50-373
REFERENCE:
H. L. Massin Letter to H. R. Denton dated July 15, 1985 In Reply Please Refer To: DOE-85-133
Dear Mr. Denton:
The Illinois Department of Nuclear Safety has reviewed the Proposed Technical Specification amendment referenced above. We have determined no adverse findings as a result of that review. We have previously verbally provided NRC with this result.
Sincerely, ffian, JU l
Michael C. Parker, hief Division of Engineering MCP:RRM:bkw cc: T. Lash G. Wright J. Keppler, NRC Region III R. Lickus, NRC Region III A. Bournia, NRC Washington, D.C.
H. Massin, CECO 0508230058 850019 1(0 DR ADOCK 05000373 PDR