Forwards Emergency Preparedness Insp Rept 50-331/97-03 on 970203-07.No Violations Noted
ML20136E029
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/05/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20136E034 List:
References
NUDOCS 9703130094
Download: ML20136E029 (2)


See also: IR 05000331/1997003

Text

~- _ . ._ _ _ . . _ . . . . _ _ _ _ _ . . . _ _ _ . . _ _ . . ._ ._ _ __

4

'

+

, r +

-

.

p

.

March 5, 1997

Mr. Lee Liu

! - Chairman of the Board,

President, and Chief

Executive Officer

L IES Utilities, incorporated

200 First Street SE '

<

P.O. Box 351

i Cedar Rapids, IA 52406 '

- SUBJECT

'

(DRS)

Dear Mf. Liu:

On February 7,1997, the NRC completed an inspection at the Duane Arnold Energy

Center. The enclosed report presents the results of that inspection.

4

i

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of a selective examination of procedures and representative records,

[ interviews with personnel, and observation of activities in progress. The purpose of the

inspection effort was to determine whether activities authorized by the license were

' conducted safely and in accordance with NRC requirements. The summary contained in

. the repcet provides an overview of our assessment of your performance in the area of

. Emergency Preparedness, an aspect of Plant Support.

This inspection was to perform the emergency preparedness core inspection as identified

,

in Inspection Procedure 82701, and to review the status of previous open inspection

i

findings. At the conclusion of the inspection, the findings were discussed with those

menibers of your staff identified in the enclosed report.

The overall effectiveness of your emergency preparedness facilities, equipment, training,

,

and organization was very good. Plant personnel had performed conservatively during an

,

actual activation of the Emergency Plan and Emergency response facilities were well

maintained. Quality assurance oversight of the program was also very good,

No violations of NRC requirements were noted in the areas inspected.

i

\r

.

\

-

9703130094 97030S

'

PDR ADOCK 05000331

G PDR

[ 130014

, espappspp.55

-

4

.- . , - , - , - . . , - - - - , _ . ._-

- . _ -~ . _ . _ . _._ .. _ _ ._. . . .

'

.

L.Liu -2 turch 5, 1997

i

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

.

,

'

and its enclosures will be placed in the NRC Public Document Room (PDR).

,

Sincerely,

l

/s/ M. Icach (for)

Geoffrey E. Grant, Director

Division of Reactor Safety

, Docket No. 50-331

License No. DPR-49

Enclosure: Inspection Report No. 50-331/97003(DRS) '

cc w/ encl: G. Van Middlesworth, Plant Manager

i

K. E. Peveler, Manager, Licensing I

and Emergency Planning ,

Cheirperson, Iowa Utilities Board

Distnbution:

Docket File w/enci Rill PRR w/enci Enf. Coordinator, Rlli w/enci

PUBLIC IE-35 w/ encl SRI, DAEC w/enci CAA1 w/enci

OC/LFDCB w/enci LPM, NRR w/ encl

DRP w/ encl A. B. Beach, Rill w/ encl

DRS w/enct W. L. Axelson, Rlli w/ encl

DOCUMENT NAME: G:DRS\DUA97003.DRS

Ye secshe a copy of this document. insecatein the ben:

m No e.py "C* = Copy without attachment / enclosure "E" a Copy with attachment / enclosure