Forwards Response to Request for Addl Info Re Review of Ipeees.Attachment to Ltr Provides Restatement of Questions, Followed by Response.Final EPRI NP-7498 Encl
ML20113D925
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/28/1996
From: Hunger A
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20113D927 List:
References
GL-88-20, NUDOCS 9607030441
Download: ML20113D925 (46)


Text

--

Stttion Support Dep;rtment 4 10CFR50.54(f) v

' PECO NUCLEAR nm %v ev Nuclear Grnup Headquarters A UNIT Of PECO ENERcv 5 Qbj"pje,fy9f 9 'd June 28,1996 Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Umerick Generating Station, Units 1 and 2 Response to Request for Additional Information Regarding Review of Individual Plant Examination of External Events

REFERENCE:

Letter, G. A. Hunger, Jr (PECO Energy) to USNRC Dated January 31,1996

Dear Sir:

5 1

Attached is our response to your Request for Additional Information dated December 22,1995, regarding review of the Limerick Generating Station (LGS), Units 1 and 2, Individual Plant Examination of External Events. The attachment to this letter provides a restatement of the questions, followed by our response.

Additionally, the remaining actions cited in the referenced letter (i.e., several housekeeping and maintenance concerns and administrative control of additional doors as " fire" doors) have been completed.

If you have any questions, p: ease contact us.

Very truly yours,

.h. o f.

G. A. Hunger, r., Director Licensing JLP/bgr 0300S9 g/

Attachment cc: T. T. Martin, Administrator, Region I, USNRC

/NN N. S. Perry, USNRC Senior Resident inspector, LGS R. R. Janati, Commonwealth of Pennsylvania

~

9607030441 960628 PDR ADOCK 05000352 P PDR

I COMMONWEALTH OF PENNSYLVANIA  :

SS COUNTY OF CHESTER  :

1 D. B. Fetters, being first duly sworn, deposes and says:

l That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the enclosed response to the NRC request for additional information dated December 22, 1995, i concerning the Limerick Generating Station Individual Plant i

Examination of External Events, and knows the contents thereof; I

and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

I h 10 ~ ; ~

Vice President i

i Subscribed and sworn to before me this day of 1996.

l W/ '

f_

No1/ary Public Notarial Seal redyfft n p h ter C un

, My Commission Expires May 17, 999

[ B.bTirar.Pemsyhtania Araiation of NOTA

+

y Dockit Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 l Response to Request for Additional Information l Umerick Generating Station, Units 1 and 2 l

. Individual Plant Examination of External Events (IPEEE)

I Seismic Analysis l Question l

1. Umerick has been identified in NUREG 1407 as a plant belonging to the 0.3g focused-scope seismic margin assessment bin; hence, the reduced-scope evaluation at 0.15g, as performed in the LGS seismic IPEEE, does not conform to the review guidance in NUREG 1407 and Supplement 4 to Generic Letter (GL) 88-20. Accordingly:
a. Provide a list of structures, systems, and components (including Safe Shutdown Equipment Ust (SSEL) items and containment systems equipment) l that did not screen at 0.3g.
b. Provide the basis for disposition of each such item at 0.3g. Indicate if the Severe Accident Risk Assessment (SARA) capacity calculations continue to be valid; discuss any other basis that has been used for component disposition, including any results of new calculations.

l c. Provide an evaluation of masonry / block walls that may influence the performance of success path components.

l d. Provide an evaluation of flat-bottomed tanks, as requested in NUREG-1407 and GL 88-20 for focused-scope plants.

Response

! 1. In a letter dated July 28,1994, PECO Energy notified the NRC that in light of the revised Lawrence Uvermore National Laboratory's seismic hazard curves, a reduced scope seismic margins evaluation would be performed at LGS. We believe our reduced-scope evaluation meets the intent of Supplement 4 to GL 88-20 for increased I understanding of seismic severe accident behavior and identification of seismic severe l accident vulnerabilitics.

l l

1 l

l J

y ___ . _ _. _ _ ______._ _. _ . _ _ .___ _ _ _ ._ __._ __ _ __._ ._. -

Dock *.t Nos. 50-352 50-353
License Nos. NPF-39 i NPF-85 f

Additionally, Supplement 5 to GL 88-20 states that ' Licensees who previously L; submitted their requests to modify their seismic IPEEEs may choose not to submit 4 any response to this generic letter supplement; should that be the case, NRC will l respond separately to their previous requests.' As such, we await NRC's response to

our July 28,1994 letter.

Question i

2. Provide a list of " bad actor" relays which are installed in the preferred and altemate i safe shutdown (SSD) paths for Limerick, including in your response all of the safe j shutdown (SSD) frontline systems in Section 3.1.2.5.1 of your submittal, and SSD j support systems identified in Section 3.1.2.5.2 of your submittal. For each " bad actor" i

relay identified, discuss the impact of malfunctions of the relay on integrity of the

! preferred and al'. ornate shutdown paths.

l Response i-

2. Identificadon of " bad actor' relays is not required in a reduced scope seismic j evaluation. However, in 1989, prior to the initiation of the LGS IPEEE project, PECO l Energy concluded a settlement with Limerick Ecology Action (LEA) to evaluate relays i and circuit breakers in those systems that would be used to achieve and maintain
safe shutdown following a seismic event. The objective of this agreement was to j identify those relays and circuit breakers that would be susceptible to relay chatter i during a seismic event beyond and outside the applicable regulatory requirements.

i The agreement with LEA was to perform this evaluation independently of the Nuclear

Regulatory Commission's request for nuclear power plant licensees to perform an i

IPEEE as requested in Supplement 4 to GL 88-20. This evaluation was completed in

1991. The evaluation was consistent with the methodology in EPRI NP-6041-SL Five chatter-prone relay types were identified as being used in risk significant systems.

They are listed below with their resolution.

General Electric PVD21-B i

The normally open 87H contact of this relay may chatter when it is energized or in the 4

closed position. LGS uses this contact in parallel with the 87L contact to pick up the 4 kV bus lock-out relay in order to trip and lock-out all circuit breakers on the associated 4 kV bus. Opening of the 87H contact will not affect the relay function

since the 87L contact has a lower setpoint and will remain closed to assure that the j trip and lock-out function is accomplished. Therefore, contact chatter is acceptable at j LGS for this relay type.

i l

}

Docktt Nos. 50-352 i 50-353 :

i License Nos. NPF-39 ,

NPF-85 [

l Westinghouse SV

This protective relay type is used as the diesel generator " ready to load' voltage i permissive relay. One contact to the SV relay is in series with the " ready to load'
i. frequency permissive relay to pick up the diesel generator " ready to load" (RL) relay.

l The RL relay supplies a closa permissive for the diesel generator output circuit

, breaker, if the SV contact inadvertently closed, there would be no adverse effect

{ since the frequency permissive or a circuit breaker close signalis not present. If the l SV contact inadvertently opened, there would be no adverse effect because once the '

circuit breaker is closed, no action by the RL relay can cause the circuit breaker to j open. Therefore, contact chatter is acceptable at LGS with this relay type.

l General Electric HFA l

1 l

l PECO Energy identified these relays during the documentation review to be chatter- .

j prone. The documentation review identifie:I that if the HFA relay was field converted l

to a NC contact configuration, and was nct subsequently adjusted for proper contact j and wipe, it might experience a problem.

l On the HFA-51/151 relay type, only the normally closed relay contact is a concem. A

review of LGS plant drawings verified that the normally closed relay contact for this j type relay is not used in a safety related application. Therefore, since all risk i significant systems analyzed are safety-related, this relay has no effect on the
identified risk significant systems.

General Electric HMA The GE HMA relay is an auxiliary type relay that was identified from the PECO Energy

documentation research as a relay that might be prone to chatter. The i

documentation search identified that on this relay type, only the de-energized, normally closed, relay contact is prone to chatter. A review of LGS plant drawings determined that the de-energized, normally closed, relay contact is used in only one

application. The normally closed relay contact is only used for indication of RCIC i turbine trip at the Remote Shutdown Panel. This usage will not adversely affect the
RCIC system.

i

! Westinghouse Type-W Contactor j A review of LGS plant drawings verified that only one contactor model type from the j PECO Energy documentation research is used at LGS in a risk significant system.

This contactor is a Westinghouse Type W contactor. The Type-W contactors are used i in safety-related DC MCCs 10D201,10D202,10D203,20D201,20D202, and 20D203

! and were identified as a potential chatter problem as a result of auxiliary contact

chatter during original MCC shake tests. Review of manufacturer documentation

}i .

i Docktt Nos. 50-352 50-353 j Ucense Nos. NPF-39 NPF-85 determined that the contactor performance is acceptable. The original seismic testing by ANCO, where the contactor exhibited contact chatter, had test inconsistencies that may have adversely affected the test results. Alternate seismic testing, proprietary to Westinghouse, confirms that the contactors are qualifHKi for use in LGS without any contact chatter.

Question

3. The altomate shutdown success path uses Low Pressure Coolant injection / Residual Heat Removal (LPCl/RHR) "C' and "D" loops for inventory control and the 'B' loop for suppression pool cooling. Identify and explain how the LPCl/RHR system is used in the alternate shutdown path (indicating what trains of the system must operate in order for the alternate shutdown path to succeed), and explain how non seismic failures were accounted for in this regard.

l

Response

3. The Limerick RHR system for each unit has four trains. Each train has its own injection path (four injection points total per unit). In the alternata success path, the

'C' and "D' RHR trains are used for dedicated LPCI mode, takire suction from the suppression pool and injecting into the reactor vessel. The "B' RHR train takes auction from the suppression pool and passes it through the 'B' RHR heat exchanger (suppression pool cooling function) to the reactor. The water returns to the suppression pool via an open SRV (reactor heat removal function). The complete pathway from the suppression pool through the RHR heat exchanger to the reactor vessel and through the SRV to the suppression pool is referred to as alternate shutdown cooling and is shown in Figure S3.1 (attached).

Non-seismic failures were accounted for in the use of both "C" and "D" trains of RHR for level control. If necessary, the 'D' RHR pump may be aligned in non-LPCI modes l using the B RHR Heat Exchanger. Failure of an SRV is not significant because of the I number (5 ADS SRVs and an additional 9 non-ADS SRVs) available.

Question

4. Provide a copy of the ' Success Path Logic Diagram" (SPLD) which is referred to in Section 3.1.2.5.4.1 of the IPEEE submittal report.

4

l Docket Nos. 50 352  :

50-353 4

j Ucense Nos. NPF-39 j NPF-85 e

i l Response

  • i
4. Figure S4.1 (attached) is the SPLD for Umerick.

Question i

i

5. Ust all shutdown-path-related non-seismic failures and human actions, together with their failure rates, noting any lack of redundancies. Also provide a discussion i- concoming the anticipated effects of the seismic margin earthquake on rates of
operator errors which may impact the integrity of the preferred and alternate success  ;

{ paths. Identify the locations at which operator actions must be performed.

J

! Response  ;

i  !

i l

{ 5. The Umorick seismic analysis is a seismic margins analysis (SMA) and as such does ,

not explicitly itemize either non-seismic failures or human actions as a seismic PSA )

would.

l Non-seismic failures were accounted for in the analysis by providing altemates for j single train / low reliability systems (e.g., providing RCIC as an alternate to HPCI) per

EPRI SMA criteria. Also, system diversity was maximized between the primary and
altamate paths so that an equipment failure in one path would leave the other path available.

i

, As noted in the IPEEE report (Section 3.1.2.5.4.2), the actions called for in the SMA l l are nearly identical to those in the Umerick IPE. The IPE human reliability analysis j

, takes into account operators and other personnel performing actions required for safe i plant shutdown under the stress of plant transients ranging from a manual shutdown

to an A1WS or large break LOCA. The rate of operator error should not vary greatly

{ from the IPE values due to the trigger event being a seismic event. The actions involved are proceduralized and trained actions and are performed primarily from the i control room or locations in other seismically qualified buildings; and thus, access to  ;

non-control room locations is judged to be similar to other loss of offsite power scenarlos.

t i

5-4 4

4

Docket Nos. 50-352 50-353 License Nos. NPF-39

, NPF-85 Question

6. Indicate to what extent the cabinet intamals were checked for adequate installation, and provide the results of these checks.

Response

6. Cabinet intamals were checked for adequate installation in accordance with guidance provided in EPRI NP-6041. The implementation of this guideline has been discussed in the submittal report in the following sections:

3.1.4.1.4.2 Functional Capability

"...To address the functional capability of the equipment, certain equipment caveats based on earthquake experience data and Appendices A and F of EPRI NP-6041 were reviewed. As a minimum, the caveats noted in Appendix F of EPRI NP 6041 and Part B of the SEWS sheets and under Section 'i' of the walkdown checklists were reviewed during the walkdown."

3.1.4.1.4.3 Anchorage Adequacy "During the walkdown, the equipment anchorage (type, number, size, .

etc.) was reviewed for conformance with the design documents and qualification reports..."

3.1.4.1.4.5 Sampling

'A detailed review of at least one component for each equipment type in an equipment class was performed... However, all accessible components were ' walked by.' The ' walk by' considered the three parts of equipment assessment (functional capability, anchorage, and seismic interaction) but emphasized a confirmation that the construction pattom was typical and looked for unique seismic interaction concerns for each equipment item..."

Results of these checks have been documanted on the Screening and Evaluation Work Sheets (SEWS) that were prepared for this project. A summary of each equipment category evaluation is presented in Table 3.1.4-2 of the submittal report, and Section (18) of this table dise.usses Control Panels and Cabinets. Additionally, the ' walk by' that was performed for these cabinets included opening the doors for an intamals ' walk by' for all cabinets that could be opened, estimated to be at least 80%

of the total population.

6-

Docket Nos. 50-352 l 50-353 License Nos. NPF-39 NPF 85 i

i

Question

[ 7. Section 3.1.5.1 of the submittal references EPRI NP-7498 as providing the technical approach used for containment evaluation in the LGS seismic IPEEE. Please provide a copy of EPRI NP-7498.

i l Response

7. Attached is a copy of EPRI NP 7498.

i Question

8. NUREG-1407 requests an evaluation of seismic-fire interactions to consider
(i)
seismic-induced fires, (ii) seismic actuation of fire suppression systems, and (iii) 2 seismic degradation / failure of fire suppression systems. Examples of items found in 4

past studies include (but are not limited to):

i . Unanchored CO, tanks or bottles j . Sprinkler standoffs penetrating suspended ceilings

! . Fire pumps unanchored or on vibration isolation mounts j . Mercury or " bad actor" relays in fire protection system (FPS) a:tuation circuitry i . Weak or unanchored 480V or 600V (non-safety related) electrical cabinets in

, close proximity to essential safety equipment (i.e., as potential fire sources)

{. . Use of cast iron fire mains to provide fire water to fire pumps e

i NUREG 1407 suggests a walkdown as a means of identifying any such items.

j Please provide the related results of your seismic-fire interaction study. Provide j guidelines given to walkdown personnel for evaluating these issues (if they exist).

Response

i

) 8. Walkdowns were performed as suggested above to evaluate: unanchored CO2 /

j Halon tanks, Mercury or ' bad actor' relays, fire pump mounts, cast iron fire mains, electrical cabinet mounting, unanchored O, or H2bottles, and sprinkler system interactions. Other than those concerns documented in Section 4.8 of the IPEEE j{ submittal, there were no other concerns identified during the walkdown process.

7

i Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 Quest!on j 9. Failure of room cooling has been identified as an important failure mode in past

, probabilistic risk assessment studies. However, in Table 3.1.21 (" Preferred and ,

i Altemate Shutdown Paths'), pump room cooling is not mentioned. Discuss the need  ;

for pump room cooling for High Pressure Coolant injection (HPCI), Reactor Core

! laolation Cooling (RCIC), and RHR for achieving and maintaining safe shutdown

! conditions for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and discuss the extent to which pump room cooling j considerations were addressed during the walkdowns.

l

i l Response  !

j 9. Room cooling for ECCS systems is listed as a support system in Section 3.1.2.5.2 but j was not included in the referenced table. This was a clerical oversight. Room cooling

is provided by unit coolers supported by ESW as a heat sink. Since the time of the

! data cutoff for the IPEEE analysis, the requirement for room cooling for HPCI and i RCIC has been eliminated through analysis and modification. The RHR sistem still ,

j requires room cooling and the required components were included on the SPCL ar,d 1

were reviewed during the walkdown. I

! l l Question

  • 1

\

j 10. Discuss the performance of containment cooling and hydrogen control systems at the )

0.3g Peak' Ground Acceleration (PGA) review level earthquake. l l
l i

i i

Response

! 10. Heat removal from containment is accomplished via suppression pool cooling as l Ithad in the success path discussion in the IPEEE report. These suppression pool j tooling components were walked down with the results as described in Table 3.1.4-2.

, Both containment cooling in the form of the drywell unit coolers and hydrogen control 4 (post LOCA recombiners at LGS) are not required to prevent early containment failure 1 and thus were not credited in the Limerick IPEEE containment evaluation. Hydrogen 1 control is only required if there is fuel damage which the success paths are designed 1

to prevent. See also response to questions above.  !

8

_ -- . . - - - - . . _ _ . - - - ~ - - - . . - . - _ - - - - . . - . - - .- -=. _

l

+

Docktt Nos. 50-352 50 353 Ucense Nos. NPF 39 l NPF-85 i

l Question

' 11. Discuss the abilty of the preferred and attemate shutdown paths to respond to medium and large Loss of Coolant Accident (LOCAs) that may result from stuck-open ,

i safety-relief valves.

j Responsa j

11. Medium and large LOCAs are not required to be considered in the seismic margins l l analysis per EPRI NP-6041-L, Section 3. However, if an SRV would stick open,  :

{- reactor depressurization would result. Reactor depressurization is required for the l j altamate path to allow LPCI injection. Thus, a stuck open SRV only moves the plant

' l from the preferred to the alternate success path. i l Fire Analysis l l i i t j Questions

! l

1. The submittal (Section 4.0) states that 'quantification of fire induced safe shutdown  !

! system unavailability was obtained by propagating fire induced system failures l through a modified Probalistic Safety Analysis (PSA) plant modet." Identify which  !

i' plant model was used (e.g., was it the LGS IPE plant model or some other?), and I explain how the model was modified. In addition, discuss how this model was verified i

as accurately representing the plant configuration and its response to fire initiating  ;
events. i j Response

{

4  :

P

1. As identified in Section 4.6, the quantification was performed using the 1993 LGS PSA  !

i model. The 1993 LGS PSA model updated the IPE model with plant equipment and l j procedure changes that occurred after the freeze date of the IPE. Updates of the LGS  !

PSA model have occurred regularly to assure equipment and procedure changes are  !

l reflected in the risk profile. Specific changes associated with this update involved i inclusion of feedwater deep bed domineralizer system, update of initiating event  :

l frequencies and maintenance terms based on plant data, revision of instrument  !

j  !

9 i i 1 i i

Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 miscalibration events to better reflect plant practice and restructuring to increase ease of model solution and application of models. Verification of the modelling and dataha=a changes was performed independent of the initiator. Sensitivity analyses were performed to assure the model and the new results correctly reflected the current plant configuration. The changes to the PSA model for the quantification of safe shutdown system unavailability are provided in Section 4.6 of the IPEEE. See also response to Question F5 below.

Question

2. The submittal states (Section 4.0.2), " Fire-induced disabling of the control room l Heating Ventilating and Air Conditioning (HVAC) is not assumed to result in loss of control room habitability. The control room is constantly manned, and a heating or cooling failure would be corrected in a timely manner according to the applicable procedure." identify the fire areas from which a fire-induced disabling of the control room HVAC could occur and, comparing these scenarios with the applicable procedure, verify that the procedure steps would result in recovery of the control room HVAC system in time to prevent loss of habitability. Specify the criter!4 used to judge whether loss of habitability has occurred (e.g., a room temperature criterion). Further, demonstrate that no system or component failures would result from fire-induced loss of control room HVAC prior to loss of habitability. If such failures are possible prior to loss of habitability, demonstrate that the failures are recoverable or that their consequences can be adequately controlled by existing procedures.

Responsa

2. A fire induced loss of control room HVAC not resulting in the loss of control room habitability is an analyzed condition for an existing safe shutdown operator manual action. Safe shutdown components located in the control room were determined to be able to function continuously at a temperature of 120*F. A room heat-up analysis was performed for a period of 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />, at which time the temperature in the control room rises to 115.3*F. The procedure to maintain the control room below 120*F is a safe shutdown operator manual action that opens doors at entrances to the control room from a stairway and the turbine building then places portable fans with 20 foot flexible duct (to place the fans outside the control room to minimize the noise) in a suction / exhaust configuration. The fans are powered by a portable pnerator. All equipment is staged and maintained as required for safe shutdown operator manual .

actions. The operator manual action is deemed achievable within the time allowable to maintain the control room temperature below 120*F, thereby mitigating the potential for safe shutdown component failures.

. . - - . ~ - - . ~ - - . . . . - - . - - - - - -.- - .= - . .- - . ... - - - - . -

I Dock;t Nos. 50-352 50-353 Ucense Nos. NPF 39 j NPF-85 l

Question i

l 3. The submittal states (Section 4.0.2), " Fire brigade response time is assumed to be j equal to the manual fire suppression time." This assumption is not considered an

acceptable approach. An assessment of manual suppression times must include
(a)
time to detection, (b) brigade response time, and (c) extinguishment time. Provide the j effect on the screening analysis by considering all of these components of fire suppression time.

Response

1 j 3. The fire brigade response time as analyzed in the submittal included: (a) time to detection and (b) brigade response time; however, fire extinguishment was assumed j to be concurrent with the arrival of the fire brigade. Fire brigade response and credit 1

' for manual suppression has been re-evaluated with 20 minutes allotted for fire

extinguishment. This allows for 30 minutes from Ere detection to fire extinguishrnent.

j Due to the conservatism included in the original fire brigade response and manual

suppression calculatons, the results of the calculations were unaffected by the i additional time for Ere extinguishment.

r

! Manual suppression was credited in the screening analysis of the following plant l cc,Tiped,isents: 44,45,47,64,67,68, and 70. The results of the screening analysis

{ for these compartments remains as stated in Section 4.4.1.3 of the submittal.

i i

1' Question l 4. The submittal states (Section 4.0.2), 'For any analyzed fire only one worst-case

spurious actuation or signal is postulated (with the exception of Hi-Low pressure interfaces). Operator actions and repairs may be available to correct the actuation or
signal or redundant equipment may be utilized in order to provide the required safe i shutdown function. The analysis of spurious operations is identical to that performed j for Appendix R analyses." Explain how the "one worst-case spurious actuation or signal" is postulated (e.g., is it based on failure modes and effects analysis, on expert judgment, or on some criteria?). Justify the implicit assumption that multiple failures l - are not possible or are unimportant, and explain the basis for any related evaluations.

I i

i I  !

DockGt Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 9

Response

4. The " worst-case spurious actuation or signal" postulated is the evaluation of a control or power circuit for the effects of single conductor fire induced faults (i.e., short, open or ground) that have the potential to render a required safe shutdown component inoperable or in an undesired position. Safe shutdown components that supoort trains of equipment not required to be operational to effect safe shutdown ir$ toe area of concern are not analyzed for spurious operation. The evaluation of Hi Low pressure interfaces includes simultaneous multiple conductor faults (e.g.,

simultaneous 3-phase shorts in the proper phase rotation). The conductor faults that have the ability to affect the operation of required safe shutdown equipment are j mitigated. That is, for a valve that is required to remain in its normal position, an open or ground in the control circuit would not change the state of the valve; however, if a l

, short could change the state of the valve, the short being worst case would require l l mitigation by an operator manual action, repair or by the use of redundant L equipment. Combinations of, or multiple shorts, opens, and grounds required to occur simultaneously or within a specific time frame are not postulated to occur with the exception of the Hi-Low pressure interface. The evaluation of potential fire induced l circuit failures is consistent with the guidance provided in Generic Letter 86-10 which identifies the specsfic case where analysis of multiple failures is required.

Question

5. The IPEEE submittal notes that a generic event tree was developed to represent the potential shutdown systems available and was used as a template for individual fire areas. The event trees were then modified to specifically model each unique set of systems categorized as successful and failed for each particular fire compartment.

i Provide a copy of the event tree (including definitions of all event tree top events), a listing of the conditional probability of all events in the tree, and a discussion of the bases for the quantification values used.

Explain how initiating events other than an automatic or manual reactor trip (e.g., fire-induced loss of offsite power) were considered, including specifically how they were modeled.

i

! 12-

, DockGt Nos. 50-352 50-353 1

i Ucense Nos. NPF-39 NPF-85 l

4 4

l Response t

1

5. A copy of the event tree (s) is provided. The event tree top events and the conditional

, probabilities are represented directly on the tree (s). The bases for the quantification i values used are those typically described in the LGS IPE submittal. The one i exception to this is the quantification of the vent path failure. Only one vent path was considered in the fire analysis because of the number of cables that would need to be identified and tracked from a fire perspective if the multiple vent paths were modeled similar to the IPE.

l

! Question

6. The submittal states (Section 4.1.2), " Transient ignition sources were identified by
calculating a generic number (see Section 4.4.1.2) which was used for all fire i compartments at Limerick." This methodology is not consistent with the 'FIVE' computer code, and is also not considered to be an acceptable Probabilistic Risk i Assessment (PRA) practice. The generic number used in such an analysis must be i shown to bound the probability of transient combustible fires in each compartment

, throughout the plant. Provide either a FIVE-consistent analysis or demonstrate that j the generic number used in the IPEEE is bounding.

Response

6.- The generic transient ignition source factor was calculated following the information in the FIVE Methodology. The generic number was calculated to bound all possible transient ignition sources in all plant compartments, j j

Per plant Administrative Controls, no cigarette smoking or use of candles is permitted in plant structures; therefore, they are not included in the transient calculation. The remaining transients, Extension Cord, Heater, Overheating, and Hot Pipe were assumed to be allowed in all areas. Using this information, the ' generic" transient ignition source factor was calculated using the following equation taken from the FIVE  ;

Methodology Section 6.3.1.2. )

Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 j i

l Transient Factor = Total of factors allowed in comoar^ui.ent number of compartments '

Total of Factors:

Extension Cord 4 Heater 3 i Overheating 2 Hot Rp l

10 Transient Factor = 10 (number of fire compartments)

=

.10 127 l = 7.87 E-2 l

l Question l

7. Provide the results of the walkdowns. In addition, address how the walkdowns ensured that cable routing information used in the fire IPEEE represents as-built information, and how the walkdowns evaluated possible dependence between the remote shutdown and control room circuitry (as provided for in NUREG-1407, Appendix C, Section C.3).

I I

Response

l 7. As outlined in Section 4.2.4 of the submittal, the following walkdowns were performed to confirm information taken from plant clawings and documentation:

  • Fire ignition Source

{

  • Fire Source

!

  • Fire Compartment Boundary e CFZ Boundary 1

Dock:t Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 L  ;

e Sphere of Damage (SOD) i e Combustible Review e Sensitive Electrical Equipment l

Cable / raceway location and fire / seismic interactions walkdowns were also performed.

l These walkdowns were performed by qualified individuals and were performed in accordance with the project walkdown procedure. General results of the walkdowns are as follows.

i Fire ignition Source - These walkdowns were used to confirm the number of ignition sources in each plant compartment which was taken from PIMS and plant drawings.

The walkdowns confirmed the majority of information. Some compartments required revision to the number of electrical cabinet compartments; however, revised F, numbers did not vary significantly from the original calculated values.

l l Fire Source Locations and Quantities These walkdowns were used to confirm the location of each fire source and the relative amount of combustibles, and to provide ,

characteristics about the fire source. All equipment locations were as shown on the  !

plant layout drawings. Relative quantities of combustibles were in agreement with plant data. Characteristics gathered included information on:  !

e Cabinet size and height from foor level e Existence of cabinet vents and equipment locations e EQ status of equipment e Number of compartments within electrical cabinets This information was used during the fire modeling of significant compartments.

Fire Compartment Boundary Verification - This walkdown was conducted to confirm the requirements for barriers as stated in the FIVE Methodology Section 5.3.6,

" Perform Fire Compartment interaction Analysis." As a result of this walkdown, seve al fire areas which had been subdivided into compartments were recombined due to pathways between the compartments.

CFZ Boundary Verification - This walkdown was performed to confirm the CFZ l boundaries were properly identified in the plant. Results of the walkdown show that j all CFZ boundaries were identified in the plant per the design basis documentation.

l SOD Walkdowns - SOD walkdowns were conducted to verify intervening combustibles and targets within each calculated SOD. The results indicated that information on the location of intervening combustibles was accurate. Some target information required i revision for proper location for fire modeling calculations.

l l

l l

Docktt Nos. 50-352

< 50-353 License Nos. NPF-39 l NPF-85 l

l i

l Transient and Fixed Combustible Review - These walkdowns gathered the information

] on the location and quantity of fixed combustibles and expected transient

combustibles. These walkdowns were performed by member (s) of the plant fire ,

l protection staff. This information was used as the basis for fire modeling in the '

compartments. Information was based on actual plant conditions, historical records, l 3 and the experience of the plant fire protection personnel. [

! f l Sensitive Electrical Equipment Verification - To support the evaluation of sensitive

) electrical equipment, walkdowns were performed to locate the equipment with respect i i to the SODS. Walkdowns were performed for all critical compartments. The i

equipment was then evaluated for damage using the fire modeling techniques outlined  ;

within the FIVE Methodology. l

{ Cable / Raceway Location - Section 4.2.1 discusses PECO Energy's management of  ;

, cable location data and Section 4.2.2 discusses Control Room / Remote Shutdown  ;

i Circuit Dependencies. To ensure adequate separation between the Control Room

, and the Remote Shutdown Room, raceway / cable locations were 100 percent verified

by walkdown. No anomalies were identified. For the remaining plant areas, when
required, raceway / cable locations identified by drawing review were verified by i
walkdown prior to updating the cable management system.  ;

{ Fire / Seismic interactions - To address the issue of fire / seismic interaction,  ;

proceduralized walkdowns were performed. The issue of fire / seismic interactions j including the results of the walkdowns are in Section 4.8.2.1. ,

} .

8. The study assumes that passive fire-barrier elements (e.g., walls, floors, ceilings, and l

, penetration seals) are 100% reliable. Such an analysis is not valid unless the  :

assumption is adequately justified and it can be demonstrated that there are no paths  !

through the barrier for the spread of damage. Provide such justification and  !'

demonstration for high-hazard fire areas, such as: the turbine building, diesel generator rooms, cable spreading rooms, switchgear rooms, and lube oil storage areas.

i i

Dock:t Nos. 50-352 50-353

Licent e Nos. NPF-39
NPF-85 i

l

! Response f

8. Section 5.2.1 of the FlVE Methodology states:

i

j. "The Phase i Screen takes credit for fire area boundaries (see j Definitions 2.1 and 2.2) being effective in controlling a fire from
spreading to the other side of a fire barrier. This is based on an j
assumption that the plant can demonstrate that the fire barriers and l their components (i.e., fire doors, fire dampers, and fire penetration seal ,

assemblies) are being inspected and maintained on a regular basis in

! accordance with established plant surveillance procedures and that J appropriate compensatory measures are being taken when

discrepancies in the barriers are found. This plant fire barrier l j surveillance program should be able to satisfy the intent of the l 1 guidelines in item 11 of the Sandia Fire Risk Scoping Study Evaluation  :

j (Attachment 10.5).

a h Fire barriers reviewed as part of the plant's Appendix R Safe Shutdown  !

i Analysis are assumed to be designed and installed correctly in j accordance with good fire protection engineering practice and  ;

l nationally recognized fire protection standards."  ;

}

l Fire compartments used in the analysis were identified by first dividing the plant into l fire areas as defined by the LGS fire safe shutdown analysis. These fire areas are i bounded by rated fire barriers as defined in the fire safe shutdown analysis and the

] FiVE Methodology. These fire areas were then subdivided as applicable into fire i

compartments using the methodology outlined in the FIVE procedure Section 5.3.6.

- Compartment barriers that were screened using the Fire Compartment interaction j Analysis (FCIA) had walkdowns completed by two qualified fire protection engineers to j verify the ability of the barrier (s) to withstand the expected fire and prevent fire spread i to the adjacent compartment (s).

l I

Fire barrier qualifications as addressed in the Sandia Fire Risk Scoping Study item ll l are discussed in Section 4.8.2.2 of the submittal. - The fire barrier control and inspection program at LGS in the Technical Requirements Manual was evaluated as being adequate to assure the proper design basis and function of fire barriers and any active components (fire dampers, fire doors) within these barriers. The fire barrier inspection and control program includes those areas ascribed in the question.

i Docket Nos. 50-352 l 50-353 License Nos. NPF-39 NPF-85 Question

9. The fire compartment interactico analysis (FCIA) is based on the assumption that fire barriers are effective as rated. For active fire barriers (e.g., a normally open fire door that gets closed by fusible link), the failure probability can be significantly high.

Provide a list of compartments with active fire barriers, a description of the active barriers, and a discussion regarding qualitative screening of these (and their adjacent) comphi. .ents.

Response

9. See response to Question F8 above. Additionally, it is believed that a detailed listing of fire compartments with active components or additional discussion of their screening (other than that provided in the submittal) would not be beneficial based on the above discussion.

Question  !

10. It is not considered technically justifiable that open hatchways in the reactor building .

are capable of containing hot gas and smoke spread. Provide an analysis of the  ;

effect on fire area multi-zone screening of considering the potential for hot gas and i smoke spread.  !

Response

r

10. The Units 1 and 2 reactor buildings at LGS are provided with an equipment hatchway which extends from the grade elevation (217') to elevation 332'. The hatchway is ,

provided with a suppression system at each elevation which is designed to prevent the spread of smoke and hot gases from one elevation to another. For the purposes of the LGS fire risk analysis, an evaluation was performed to analyze the effects of a j

~

fire on one elevation to the elevation (s) above. The results of these evaluations showed that with the expected fixed and transient combustibles in each reactor build'ng, a fire in one elevation would have no effect on cabling and equipment on ,

upper elevations due to the cooling of the fire plume as it rose up the hatchway. This evaluation did not credit the cooling effect of the hatchway sprinkler systems.

i

l-Dockit Nos. 50-352 50-353 Ucense Nos. NPF-30 NPF 85 l

l l

l Due to the rest.t of these evaluations, it was assumed in the reactor building l analyses that the smoke and hot gases from a fire would be contained to the l elevation of fire origin. This assumption provides a conservative approach as it l causes the fire plume to remain on the elevation of origin, thereby producing elevated i plume and hot gas layer temperatures for the area under consideration. This is consistent with the guidance provided in the FIVE Methodology.

Question i

11. Provide the details concoming the screening analyses of the following fire cerr@Li.cnts (including the relative separation between potential combustible sources and critical equipment, as well as whether or not any non-lEEE 383 rated l cabling is utilized):

Fire Compartment 1E - Recombiner Access Area l Fire Compartment 07 - 4kV Switchgear Corridor l Fire Compartment 22 - Unit 1 Cable Spreading Room Fire Compartment 23 Unit 2 Cable Spreading Room Fire Compartment 44 - Unit 1 Safeguard System Access

, Area l

Fire Compartment 45 - Unit 1 Control Rod Drive (CRD) j Hydraulic Equipment Area Fire Compartment 47 - Unit 1 Isolation Valve .

l Compartment Areas j l Fire Compartment 64 - Unit 2 Reactor Enclosure Cooling Water Equipment J l Area l Fire Compartment 67 Unit 2 Safeguard System Access Area

! Fire Compartment 68 - Unit 2 CRD Hydraulic Equipment Area Fire Compartment 70 - Unit 2 Isolation Valvem Compartment Area Fire Compartment 87 A/B/C Condensate Pump Rooms, Generator Equipment Areas, Operating Floor 4

l

l Dock:t Nos. 50-352 50-353 License Nos. NPF-39 NPF 85

Response

11. All 12 of the compartments were first analyzed using the qualitative (Phase 1) screening process as outlined in me FIVE Methodology Section 5.0. All of the compartments are fire safe shutdown analysis fire areas bounded by rated barriers except for Compartment 1E which was separated from other compartments in fire area 1 by following the compartment interaction analysis as outlined in the FIVE

'?:"-:-f-:4-Jy Section 5.3.6. Since all twelve compartments did not meet the screening criteria of the Phase 1 analysis (F, < 1E 6), they were subjected to the quantitative (Phase 2) screening process as outlined in Section 6.0 of the FIVE Methodology. Details of this screening process are described in the following' paragraphs and summarized in Table F11.1 below.

Compartment 1E The mTv&hnent was analyzed for the probability of fixed and transient combustibles exposure damage. The evaluation of fixed combustible loading determined that the only combustible present in the compartment was electrical cable insulation, which due to plant installation requirements is IEEE 383 rated. The methodology states that

'Self-ignited cable fires for IEEE 383 qualsfied cable will not be considered fire source initiations in this methodology, consistent with past PRA methods.' In accordance with the assumption in the methodology, the cable is not considered an ignition source.

No other material or equipment exists within the compartment.

The transient combustible evaluation showed that the ' typical" transient combustible that was used could damage redundant equipment in the area. Therefore, administrative controls could be established for the compartment which restricted transient combustibles from the area unless they are constantly attended. As stated in the FIVE Methodology, transient combustibles controlled in this manner do not need to be considered " exposed" combustibles. Therefore, no exposure due to transient combustibles is expected in the compartment.

Due to the lack of possible exposure from both fixed and transient sources, no fire damage to critical equipment is postulated for this compartment. Following the guidance of the FIVE Meth%y with P, = 0 and P. = 0, the compartment screens as F3 < 1E-6.

Compartment 07 This mTvmbi,ent was analyzed following the same methodology as Fire Compartment IE.

20

- - - . . . - . - . - - - - . ... - - ~ _ . -- . _ - -

Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 Compartment 22 This compeiunent was analyzed following the same methodology as Fire Compartment 1E.

Compartment 23 This compartmord was analyzed following the same methodology as Fire Compartment 1E.

Compartment 44 Fire Compartment 44 consists of the Unit 1 Safeguard System Access Area on the 217' elevation of the reactor building. To meet the intent of 10CFR50 Appendix R, Section Ill.G.2.b, which is equivalent to CMEB BTP9.51 Section C.5.b(2), to which Limerick is committed, a 20 ft. separation zone is established in the area to separate j redundant safe shutdown methods. Although this separation zone is established, it '

was not initially credited in the IPEEE analysis, and thus served as a bounding analysis verifying the need for the separation zone.

Following the guidance provided in the FIVE Methodology, the probability of damage to targets (required safe shutdown equipment) was performed for both fixed and transient combustibles. Fixed combustibles consisted of electrical cabinets. An evaluation of the intervening combustibles for all fixed sources was performed, and the heat release rate (HRR) from these was added to the fixed source HRR. Each target was analyzed using the calculation sheets within the methodology. Due to the size of the fixed fire sources in the compartment and the relative positions to the targets, no damage from the fixed fire sources was expected; therefore, the probability of fixed combustible damage (P) was assigned a value of 0.0.

As described in Section 4.3.2.3 of the submittal, a bounding transient combustible -

was analyzed for each critical compartment in the plant. The probability of damage ,

due to this transient was analyzed using the calculation sheets within the FIVE ,

Methodology. Transient combustible damage was precluded by administrative >

controls on spatial separation and the response of the site fire brigade; therefore, the probability of fire suppression unavailability from transient combustible exposure (PJ was assigned a value of 0.1. Other transient combustible considerations were calculated as follows:

w: w is defined as the probability of having critical amounts of transient combustibles between periodic inspections. Due to the administrative controls on combustibles and to allow conservatism within the calculation, a value of 1.0 was assumed.

Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85

u
u is defined as the probability of the transient combustible being located where l It can cause damage, and is a ratio of the target areas to not floor area. This

! value was calculated as outlined in the FIVE Methodology Section 6.3.7.2, Step 3.5, to be 0.159.

p: p-is defined as the probability of having the transient combustible exposed.

Due to the administrative controls on the use and storage of combustibles in the plant, p was assigned a value of 0.1 as defined in the FIVE Methodology, Section 6.3.7.2, Step 3.6.

Using these values, the probability of transient combustibles exposure damage (P )

was calculated by:

l P. =P. u p w

= 0.1(0.159)(0.1)(1.0)

= 1.59E 3.

The probability of damage due to fixed and transient combustibles exposure (P 3) was calculated by:

j P3 = P,+ P.

= 0.0 + 1.59E-3

= 1.59E-3.

l l

The overall frequency of a fire occurring and damaging safe shutdown components in the compartment (F3) was calculated by:

F3 =PF 3 3  ;

= 1.59E-3(6.9E 3)  ;

= 1.1 E-5.

i This is the value as stated in Section 4.4.1.3 of the submittal. Because this value was above the screening criteria of 1.0E-6, an analysis on the availability of safe shutdown l equipment was performed.

i 22 -

Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 l

\

Subsequent to the calculation of F., this compartment was separated into its l respective Appendix R East / West cc,T,padu. cat designations by confirming the j adaquary of the separation zone consistent with the FIVE Methodology. Given this <

l confirmation, Compartment 44E and Compartment 44W were re-analyzed for fire-induced equipment failures.

The re-analysis involved the identification of the cables and components (targets) with respect to the known sources of fixed and potential transient combustibles. It was performed to confirm that credit could be given to specific equipment within this cc,T+s,aoent. When it was determined that a system or train would survive, the PSA ,

models were used to calculate the unavailability of the surviving systems from non-fire-  !

induced causes and again compared to the 1.0E6/yr. screening criteria. Because the ,

+datad P includes credit for systems outside the ccirps Li,ent, the final probability amaMa'ad with a fire in this compartment is F, divided by P, and then multiplied by >

P..

Compartment 45 Fire compartment 45 consists of the Unit 1 CRD Hydraulic Equipment Area on the 253' elevation of the reactor building. To meet the separation intent of 10CFR50, Appendix R, Section lil.G.2.b, which is equivalent to CMEB BTP9.5-1 Section C.5.b(2),  !

to which Limerick is committed, a 20 ft. separation zone is established in the area to l I

separate the redundant safe shutdown methods.

The ccmpartment was analyzed following the same methodology as Fire  !

Compartment 44.

Compartment 47 Fire Compartment 47 consists of the Unit 1 Isolation Valve Access area on the 283' ,

elevation of the reactor building. To meet the separation intent of 10CFR50, Appendix i R, Section Ill.G.2.b, which is equivalent to CMEB BTP9.5-1 Section C.5.b(2), to which i Umorick is committed, a 20 ft. separation zone is established in the area to separate the redundant safe shutdown methods.

The compartment was analyzed following the same methodology as Fire Compartment 44.

1 Compartment 64 Fire Compartment 64 consists of the Unit 2 RECW Equipment Area on the 201' elevation of the reactor building. The area was analyzed following the same methodology as Fire Compartment 44.

j

Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF 85 Compartment 67 Fire Comprubrient 67 consists of the Unit 2 Safeguard Systems Access Area on the 217' elevation of the reactor building. To meet the separation intent of 10CFR50, Appendix R, Section Ill.G.2.b, which is equivalent to CMEB BTP9.5-1 Section C.5.b(2),

to which Umorick is committed, a 20 ft. separation zone is established in the area to separate the redundant safe shutdown methods.

The compartment was analyzed following the same methodology as Fire Compartment 44.

compartment es Fire Compartment 68 consists of the Unit 2 CRD Hydraulic Equipment Area on the 253' elevation of the reactor building. To meet the separation intent of 10CFR50, Appendix R, Section Ill.G.2.b, which is equivalent to CMEB BTP9.5-1 Section C.5.b(2),

to which Limerick is committed, a 20 ft. separation zone is established in the area to separate the redundant safe shutdown methods.

The compartment was analyzed following the same methodology as Fire Compartment 44.

Compartment 70 Fire Compartment 70 consists of the Unit 21 solation Valve Access Area on the 283' elevation of the reactor building. To meet the separation intent of 10CFR50, Appendix R, Section lil.G.2.b, which is equivalent to CMEB BTP9.5-1 Section C.5.b(2), to which Umorick is committed, a 20 ft. separation zone is established in the artia to separate the redundant safe shutdown methods.

The compe,Liient was analyzed follow 5g the same methodology as Fire Compartment 44.

compartment s7 Fire Comps Lisent 87 includes the condensate pump rooms, generator equipment areas, and operating floor of the turbine building. This fire compartment consisted of fire areas 87,100,113, and 114 due to the inability to separate the areas by following the Fire Compartment interaction Analysis (FCIA). Although the barriers separating the areas were fire rated, the structural steel supporting the ceiling assembly in the condensate pump rooms was not protected and had not been evaluated por the NRC approved LGS structural steel analysis as being acceptable.

i Docket Nos. 50-352 ,

i 50-353 i

I Ucense Nos. NPF-39 NPF-85 i

!\  ;

j- As part of the LGS fire risk analysis, a structural stool analysis of the ceiling assemblies was performed. The results of the anarydis showed that the structural steel could withstand the expected fire hazard; therefore, the barriers were capable of l l providing separation of the areas. Following the FCIA methodology, the areas were i 00Tipsuui entalized into Compartments 87A (Fire Area 87), Compartment 878 (Fire 1 Area 100), and Compartment 87C (Fire Areas 113 and 114). These three

^

i

} 00Tip.usients screened in the Phase 1 analysis due to F, < 1E4.  ;

I \

{  !

l l TABLE F11.1 f . FIRE F, P, U P. P. F, l j

4 COMPARTMENT I 1E 7.7E-4 0.0 -

0.0 -

0.0 i

j 7 7.7E-4 0.0 -

0.0 -

0.0

! 22 4.0E-3 0.0 -

0.0 -

0.0 l 23 7.7E 4 0.0 - 0.0 -

0.0 44 6.9E-3 0.0 0.159 1.59E 3 1.59E-3 l 1.1 E-5 j 45 5.1E 3 0.0 0.0915 9.15E 3 9.15E-3 4.7E4 l 47 6.6E-2 0.0 0.0311 8.11E 4 8.11 E-4 5.3E-5 f 64 1.1 E-4 0.0 0.0114 1.14E-4 1.14E-4 1.2E4 1

67 7.1 E-3 0.0 0.3737 3.74E 3 3.73E-3 2.7E-5

68 4.7E-3 0.0 0.0642 6.42E-3 6.42E-3 3.0E4 i
  • l l 70 6.6E 2 0.0 0.0889 8.89E 4 8.89E-4 5.9E 5 I 87A 9.5E4 i 87B 1.1 E-7 4 87C 1.0E4 25 -

(

.=

DockGt Nos. 50-352 50-353 i

License Nos. NPF-39 NPF 85 l

1 l  !

l l l ouestion  ;

! i i

l 12. With regards to the analysis described in Section 4.3.3 in your submittal, have any l combustible fire barrier materials been used as the basis for establishing 20-ft-separation combustible-free zones? If so, has the analysis considered propagation of

, fire via combustion of these fire barrier materials? If not, please provide such an l assessment for fire spread.

Response

l 12. Thermo-Lag 330-1 fire barrier material is presently used on exposed electrical cabling in combustible-free zones. The material is used as the basis for removing the cabling as a combustible within the separation area. PECO Energy's Thermo-Lag Reduction Project is evaluating attemate methods of controlling combustibles within combustible-free zones. As a result of this effort the Thermo-Lag will be removed or fire propagation path eliminated.

j Per the information contained in NRC Information Notice 95-32, 'Thermo-Lag 330-1 l Flame Spread Test Results," the maximum distance of flame travel was approximately l 8 ft. during the 10 minute test period. As a result of these test results, the hazards i present, protection available and administrative controls which include hourly firewatches implemented as a GL 92-08 compensatory measure, it is not expected that the Thermo-Lag as installed in the combustible-free zones will affect the integrity l of the combustible free zones. l

, Question

13. The submittal states, ' Operator effectiveness in performing manual safe shutdown actions is not midored to be affected by areas which contain smoke and hot gases." This assumption is not considered to be acceptable. Please provide a l l t::$*-n of any sequences for which credit has been taken for operator actions in 1 t

the affected fire areas. Provide an assessment of the impact on area screening if no '

credit is given for operator recovery actions in an affected fire area.

1 i

l 28 -

Docket Nos. 50-352 50-353 Ucense Nos. NPF 39 NPF-85

Response

13. Operator effectiveness in performing manual safe shutdown actions has been analyzed for the effects of smoke and hot gases. Of the manual actions credited for fires at LGS,15 actions occur in the same fire area where the fire occurs.

Five of the 15 actions occur in the same area as the fire but are separated from the Are by a 20 ft. separation zone. As stated in Section 4.3.3 of the submittal, these zones have been evaluated as providing adequate separation to prevent smoke and hot gases from affecting equipment on the opposite side.

The ten remaining manual actions are required to be performed 2 to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> into the fire / safe shutdown event. As evaluated, the plant fire brigade is credited with pr'oviding manual extinguishment of fires at 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> into the fire event. It is assumed that operator actions will be unaffected by smoke and hot gases 1.5 to 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after fire extinguishment.

Question

14. Section 4.6.0 of the submittal states that ' pre-cursor" events (such as miscalibration of sensors) from the IPE models were used to derive the Are IPEEE PRA model. It is also assumed that all systems are available at the time of fire initiation (i.e., no test and maintenance unavailabilities were included). This practice could distort or mask important risk contributors. Provide an assessment of the impact on area screening if these factors are included in the analysis.

Response

14. As stated in 4.6.0(5), pre-cursor events such as miscalibration were not used in the fire analysis. The total initiator frequency in the IPE model (the addition of all transient, LOCA, ATWS, LOOP initiators) is several orders of magnitude greater than the total of all fire initiators. Pre-cursor events, as modeled in the IPE, did not significantly contribute to the risk as calculated in the iPE. Given the previous IPE results and the initiator probabilities, the pre-cursor events would not contribute to the calculated results in the fire analysis.

Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 A quantitative assessment of the impact of removing the test and maintenance unavailabilities was performed. The dominant contributors to the unavailability of systems not damaged by the fire were, as in the IPE, human actions. The contribution of the maintenance terms was sufficiently small that the screening of fire compartments did not change any compartment from one that screened to one that did not (i.e., migrate past the 1E 06 screening criteria).

Question

15. A listing of shared systems is not documented in the submittal. Provide a listing of shared systems (if any) and an analysis of dual-unit fire-induced core damage scenarios, including a discussion of whether or not additional fire compartments survive the screening analysis.

Response

15. The simultaneous impact of a fire in a particular compartment on both Umerick units was analyzed. Systems shared between the LGS units were reflected in the fire-induced failures and the quantification. Table 3.2.3-1 in the LGS IPE submittal indicates that portions of the Emergency Service Water (ESW) and the RHR Service Water systems are shared between the units. These systems were explicitly assessed on an individual train basis from fire impact and PSA quantification perspectives.

1 l

l i

28 -

l

Figure S3.1

{SRV MAINSTEAM LINE REACTOR J

t (h (h RilR RilR llEAT IIEAT EXCilANGER EXCilANGER B

A SUPPRESSION POOL

^

RilR PUMPS RllR PUMPS ALTERNATE SilUTDOWN COOLING

.)

i n

w 1

b I

l L

- R(1C -

~

lutR ~

(%IM) r

- HPCI -- f ,

R OR - RilR HEAT  !

W ~

EXC1LLNGFRS

~

h I

b it rtVRI $nt 6 %I% RHR

- NHR I {

C 9 Ar NMTR (I M1) -4 oro y 9 oc nmrR w . rw Runn s. Run: w u n g

  • Aos cs e--

9Rnv _

O RIEN%V g , }g k f 9 IN5IRt MLNI GtS , , (7,gp' . - RHR , 5 9 St ITRL$33ON NM)t. g 9

9 5%51RITifWI 41M)N IMtMI g e SIMM g h L_ LIQt'ID s

  • . (TKNTROL S)SIMI i

Limerick Staccess Path Logic Dingram ,

Figure S4.1 t

v 1

4 2

_ . _ _ . . _ , _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _____m - _ _ _ _ . _ . . . _ _ _ - - - . , , _ . . - _ . - _ e -. - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _

i r

s F lft A3W A L D55 UF f fEDetAif H CUNLi t6A T E HPCI HCIC [EFHL55 CURE 5FMAr a S P ,

Islila10R DFf SITE AWAIL8Btf FOR &(AIL A8tE FOR AVAll ASLF FOR AVAILARE FOR AV A(L ABLE AdAIL ABLE FOR PGufR ]NJECTION INJECIION INECT IOf4 [NECTION INJECTION SE M NCE O O DESCRIPTOR S W M NCY FIAF t00P Fd CONO HPCI RCIC X CSA s

T ALuf1P 2 hE-03 Mi 'IN # I 3tE-G3 L

AL 50i #1ptLOOP

- - - - - - - - - - - - - - - - I RF 1 &$ Q1 y i

k f_ , -- 50 $ J IRL OGit a 154 > 00C+00 .

i 1

504 3 IML0lWV Wf'Ord) TAF A 9 4 -02 C 1

? '

W 0"

t~ .

. Core SO*a #1NLUUPF MLONOMPL E TAP 1 60F-02  !

N6 DK C2 "i

i $U s-W f gg SOE clNLOUW MCONDHPLifs IRF  ! . R'1 - 0 3 E- T fX-Of l E'-

," e S$

w.

Qh h _g, 507 !REL00pracDtO@CI AC IIE 1 OtE-04 j M* RCIC

", t . 50E -01 l IE i

, *a Wc ff LM of we esatnortm D o*4' tat is 1 3dt -cf 5 '. -

S

- r.

b8 FIRE AEA EVENT IREE FOR LIMERICK GEpERATING STATION INITIAL FIFE EVENT TREE 4 .

.m......_m.< .-. ._....__.....m.._....~. . ..m__.. _ . . . _ . - - - _ _ . . _ _ . . _ . -

. - . . _ . _ _ . . . ~ . . . .

n t

b L OSS OF fJF F 511E HPLI RCic DtPHE S$ .

CUFE 5PRAF a S P POWER SEQ Avaltam.E 'OR S v &[L AR E F DR AV AILABLE Avalt ABt.E FOR TRANSFER FRCps INJECTION INJE CTION INJEC1194 EME D FIREsot O DESCRIPTOR S mEQUENCY . j F1 HPCI RC]C A CSA l

1' ,

[

L r

501 73 IAF  ? 3sE-C3 1

f ilAESCt 502 1FfT.! TM i t'JE-04 2 31E-03 i i

t

<= I

? I 50's f1HPCIACIC I AF 1. JrJE - 08, HPCILP +

O* E EE-On

y. +

1

=

"M "E I

- i n -

3E 1 g,-k f- k ' tMT1RCICCSA iM SO4 4 Pft 05 i-fj

  • HC1CLP 4m Teat-os e$

=-

di

  • m.P

. To $ gg_g, SOS TtFetIACICJ JA 7. t ** - 06 E"

n C:

8; 3L 65 FIRE AREA EvtNi TEE FOR LIMERICK GEERATING STATTON LOSS OF OFFSITE POWER SEQUENCES TRANSFER FROM FIRES 01

iw sinetos e t t unut n sisMW hSION W M Sb10N SUFM5510N SUNE Sh!ON vt h f im S iP 't F IRE 502 AvAIt A8LE FOR POOL COOLING A POOL COOLING C FOOL 000 LING POOL COOL [NG AvAIt AGt E FOR L FN {NJ 1( Af E h0V AL AVAIL ABLE FOR AVAIL ABLE FOR A W AIL ABLE FOR AVAIL ARLE FOR HE. A T RE 40 r AL E SE M NCE 'D ,

HEAR M 40 VAL HEAT M40 VAL *( AT RENGVAL e(At Muova O DESCRIPTOR S N OUENCY .

F2 hfu # #

SPA SPC SPB SPO mv 501 52 W ,

[

31AE502 3 0GE -e t 502 F2NF W V QTMS "9 M-02 50 1 F PNF MTA .#

? I o

$PCA

, h HiN 504

  • FW WSDASPC P f ga r*

1 ru et J tw $

O W

e EdE-03 505 62WFNSPASPC3PB y 2 '.-

}s _

nt

  • aG 7g SPCB F

' 4 6tE-03 c ]

  • ?

S u>

-- SOf ' 2mF N'FA'4ttJ'tPPl1 'F a <y .

g i O

4.,e a 6X-G3

.s 5 g f_. [gh, sci

  • Pw MwAvtsPesrouw ?A i w to r:

2r

.L bs FIRE AREA EVLNI TREE FOR ,

LIERICK GENERATING STATION TRANSFER FROM FIRES 02 FEEDWATER INJECTION SUCESSFUL i.

__ - _ _ _ ______.__._.___-m_.-_ - _ _ - . . _ _ _ _ . - _ _ _ . . _ _ _ ___ _ _ . _ _ _ . - _ _ . _ _ _ _ _ _ _ _ _ _ - __ m__.___________e _ _ _ _ _ - - _ _ _ _ _ _ _ _ -

b taAwtaemm sme com snuicom smtoowa sHu ruom (rtsu sm roowiLL IEm. SHutDOW4LL TE.m 5HUTDOF'tLIERN SHUIDUse VFhil% fur S IP F IM$03 COOL IFE A COOLifG C C00 Lim B C00LIrs D C00 Lits A COOL!tG C COOLIrG 8 COOLIr6 D HE A1 N MGvat I Cato 1% AVAIL ABLE FOA AVAIL ABL E FDA AVAIL ABLE FOR AvaltaaLE F0H AVAILASLE FLM AVAIL ABLE FOR AVAIL ASt E FOR AvalL A&.E FOR E SE0E NCE O HE AT rem 3dAL HFAT REMOWAL tf AI NM0d AL M ai HEMOWAL HF AT M MOW AL M AT MmGWAL TEA T R NOV&t if $1 MMOWAL 0 DESCRIPTCR S FREQUENCY F3 SDA SDC SOB S00 ASDA ASDC A508 ASOCO nw se t r3 y a

^ 1 AES0 3

gg sor  ; 3soA y T -02 50 ) v 33GAsDr. w So, som c asoAsocus ><

SDEB g TM-0J 50t ' 3SDASDCHEW W

? ,

is t o i oo  !

soco  !

E' . Y adt --02 ~

SUt f 3SDA50CS00SLOASDA Jer

's >

t Ei A SDCA ,

) ist-02 S07 8 3SGA50C50B500A5DAA5 3k i "hs 1 '

i g r. -

l8 1

?, A50CC e -02 SCt'

  • 3SLASDC5Dh50CASDAA$ 3E4 S QOE.00

.8 L kb 1 Asots 1

1. 9AE -02
  • 5 509 iTLASDCSDt45DCASDA A5 A5 tA M )OO C" Asoco  !

nE TTTG2 l E$ $ ,, sit r 3scAsocsosscorcAAs- .A s. msa I.at  !

th '.

M.

- li

, od i

FIRE AREA EVENI TREE FOR ,

LIMERICK GEteERATING STATION  !

TRANSFER FROM FIRES 03 .

CONENSATE FOR INJECTION i i

_ . - . . - - . - _ . . --__ ~ _ - - - . . . _ _ _ _ _ - - . . _ _ . . - - _ _ _ _ _ . _ _ _ _ - - - _ . _ _ _ - _ _ _ - _ - _ _ - - . _ _ - _ - - _ - - _ _ _ _ _ _ _ _ _ - _ _ . _ - _ - _ _ _ _ _ _ _ _ -__

i IRArt9 t H F HUM S t L DNATER SUMHt 55 ]IX4 MA PHE 5510N 9A'Ht $51(#4 SUPHES$10N (A P6t h5URllAf l DN VENilts AVAIL AtA E S P  !

F lHESO4 AVAILABLE FOR POOL C00 Lits a POOL CUCLIFE C POOL C00 Lits POOL COOLIN6 A vAli ABL E FOR HE AT RMOVAL ,

HACI 14J P( Al REMOV AL ' AvallABLE FOR AWAIL ABLE FOR AVAILABLE FOR AVAIL ABLE FOR E SEQUENCE D ,

HE A T HE MOs AL . HF AT MMOVAL HE AT RE MOVAL of AT MMOWA O DESCRIPTOR g FREQUENCY ,

F4 nF m SPA SPC x ey SPB SPD

?

k

- . - . _ w1 ;4 y

- IRE 504 rung -

502 ' de m >

CINS rw.ca soi c ae ssr A w r

SPCA 9 6tl-G3 SG4 'ed M'}$5PC 'W h i Nh l

i p, - t y= secc -

g 064T-M sat >4wn+Awlse .s ,

,o r "4

~5  :

g- i

)ec SPCB 5 6M43 50ti ' Ad WSPA9'LSPB90 N 4 t.0E Ch g

AR .

?, t e

e8 SPCD e 6X-03 gi

? so ? e dw nspawtwesrs, at R* ,

sta

g s ca44 N'd4, ses aw awAwcsrestav 2A t . r 1E ca

?. "

bt

"/ ?.  !

od '

FIRE AREA EVENT TREE FOR LIERICK GEERATING ST4 TION r IRANSFER FROM FIRESO4 FEEDWATER INJECTION SUC)iSSFUL L

s T R AN9 t R F HOM F EECaATEH SUPPN.55 I Ore SJ*PHE % & Ott SUPHE SS10rd SUPHE 551Gro DtPRESSUR]IAT!We V1411% S P F IAE505 AVAIL ABLE FOR POOL COULIM A POOL COOLIM C POOL COOLING POOL 000Ll?Ki AVAIL ABLE AWAll AOLE FCR ACIC !!O M AT AEh0V AL AWA1L ABLE FOR Ava!L ABLE FOR AVAIL ABLE FOR AVAIL AHLE FOR IEAT REMOVAL E SE M NCE D HE AT Mm0 VAL HE A T HE MCvat HE AT Ruoval War HMOWAL G DESCRIPT0R S N OUENCY FS nF M SPA SPC SPB SPO x av sas es Oe

'IAES05 iW:5g ~'

Sun iSW n M Gims 9 7*d -02 50 ) / Sv W',P A t#

SPCa 53 tE -03 %4 **AfNSPASPL #

8+

C fi

  • y- tswc g irne -n see res asPASPLSPD W m

"G ~

  • , sPcs

( 5'N-" SOE c 5sd wW A5PLSPESPD iM 1 SAE -06 a

?,

a b I 33

]

e so e Sv nsr Aspcspespor an T

g, .[.eT54 s

C

$00 F6W MSPASPLSPBSP0 int 2A 1.00E*00 e

hi S- E.

N FIRE AREA EVtNI IREE FOR LIMERICK GEfERATING STATION TRANSFER FROM FIRES 05 FEEDWATER INJECTION SUCESSFUL

s iHAfr5f t R F NOM SHU T [)CW4 SHIJf DOW4 $8tliDOW4 SHU'C04A !L if MN SHUIDOWiLL 4tFFJ. SHUTOOsen AL TERN Sri!TDCW4 LLif M SrKIIDGW VLNilW 6 9 F IFf %6 COOL ING A COOL ING C COOL ING B COOLING D CDOLING A COOLING C CDOLING B C00L ING D A t& TL ABL r FOR CONO Im a d AILABL E FOR avail APLE F0n AVAIL ABL E FOR Ay&ILABLE FOR AVAILABLE FOR AVAIL ABLE FOR Ava!L ABLE FOR AWAIL ABLE FOR HE A R *" . dGVAL E SE0tKNCE D M AT REMOWAL HE AT RE Mot &L M AT EMOdAL tE A T REWJys' HE AT REMOvat HE AT REMOVAL t( AT M407AL tf A l M MOV AL Q OESCRIPTOR S FREQUCNCY F6 S00 SOA SDC SDB ASDA ASOC ASOB AS00 ww 501 86 C#

c lf4506 y y ggg 502 6SCA SDr A i 2'M -02

~~ D # #3DM F SDCC y y 34 q SO 4 r6SLASDCsts SOCB C

'1 P9E-02 50t #6SCASDC$rebOL) @

?

M c-O&

". SDCD E T DXe SOE r6SDASDC5tf350u1SDA .w 1

ru "

"A 5

ASOCA 2 s tE-62 $47 36SDA5DCSDBSDO A%A AS y E1 8'

A

?, ASDCC

  • I SOE '6%A50(.St4fSDO A%A A5 3r{ ti OGL .fAJ ET n

mi ASDCB

  • est -02

'e% 509 '65DASDLSMDLIASDAA5 AS. 'A'HIl - 10 ASDC0 eE T'iT1 w-lf 5"d .,, sic :ssDAsoc50esOcasoAas Asi insma e

.,=

  1. h od FIRE AHEA EVENI 1REE FOR LIERICK GEERATING STATION TRANSFER FROM FIRES 06 CONDENSATE FOR INJECTION

s i

ramsr e u + aum tw smAv e Lect A tect c tPct a tect o wwsn a rttonAf ta S P F IFE SG F avail ABLE FOR Avalt. ABt f FOR Avatt AR E FOR A v AIL ABL E FOR Avalt.ABLE FOR AV AIL ABL E F OR AVAIL ABLE FOR re NIGH PR IHJ . lNJECTIOrt 3MJEti!(N INJECIION I U Cf10N INJECT !GN INJE CT ION H AI RFaCVA1 E SEQUENCE D cs F AIt 5 0 S FREQUENCY DESCRIPT0R F7 CS8 t.PCA LPCC t PCB tPCO RSaB nF W a

5b1 e7 8 4

9t -02 I# " If ' i D7 I

303 5105R 26

>1RESG7 t Ctf-G4 g g SC A - TCSBNF u trf 8 99E-c?

- 105

  • KSHLFCA 36 1

CSB TBeiE -02 g - - - -

Sur * /CSrst PLAW u itt t A*d 03 s

?

8 30/ 4 /C58' PCAt Pt.C at LPCla 8 'i 95E-02 if

  • j ('"j . , soe icsetPcAt Pt.rw rw tr e r ose-u m

". -L NN ICNN Al kCS P[.fi M

-M ETcE -02 E. e,

5tC # 7 cst % PCALPLI LPCBwf a trf 1.00E+09 a

@$ iPcis g4 T M -02 511 ' ?CSBLPLALPCCLPCR PC. 2 e

I 3f g ( ';"h --- stt ricca PL At PCu Prm ir eW ) OGf +00

e rico, e' *

{j -@Q sn iC2LPC At PCCt PCR PL & GCE +00 n

6d FIRE AREA EVENI 1REE FOR LIERICK GENERATING STATION TRANSFER FROM FIRES 0)

NO HIGH PR. INJ. CSA FAILS

_ _ , , _ . _ _ ~ . ~ '

T k 3 3 I w h 6 5 h $

a = a LO@*  % b h  % 4 h

  • M $

~ =

  • e v i

s< s d 3

= 1 &- s 6 b m

gg 2 @

=

  • q w*

1  % e 5 @ @

$a$ a y x 0- g g

  1. 2 s s s a W$ ,

O {

d 3

g s s e

S B

-s 5-a

~ a  ? O '  :

On y

~

  • ,, m -

mwo* 8 o

  • S 8 s
  • j 8

x 8 $

e 2

  • *Y Z Ed

}

W*W

$s, g

(QW w

I -u m

? K ,

Ek "

ET g 5 .a

_k ow$ d,

{T*Y etw $*

g5e o

$ !Y g5

-6 3

9=ga ws Gew@ g

!W e*

5sen h 3, k Y

_um, Ej I

b' wy o l id g @

s oge. -

  • 3 t U

l' e?

  • r h-

-~

N t h

I E i

_8 = w .d

)

i f92S 8*

i tr a

  • 3 s k gg;_*

$T @

s-

-a <W r

.ow. bd

}

i "g 4 e

Od5 va. oE 6 e g**E

  • b l

! Y j 5555 =Y

!6 ga

.ows h Y i

%'$ds -

MW I

gg se v'te r*wa 54

-f$YS se a P

j  !!s:T  ; $

!.S e g

1, p# .

~

w .

Soc-t?

$ *% 2

-p S[

G13-#C B = .4M2 7tih $350 00 4 95-40 9 a sea uoi aen 4 c avenc 003d EC'E veonN 96-40-9 4000 :C0 G 163 V4f,361350h O

lHAN35 t>I F ROM SUPPHt 55104 SUPPM 5$I ON 5tDM SS]G4 SJM.SSIG4 DE PHE SStEnIIAllON WEN!!Nu S P F!502 PC3L COElits A POUL COOLING C POUL COOL ING POOL COOLPG A va!LAR E AWAltaLE FOR HPCI ]NJ AvalL ABL E FOR avail ABLE FGA AvAILaa E FOR AVA]LABLE FOR H AT PE.MGVAL SE M NCE D HE AT AE nqval HE. A T HE Mot AL M AT REMOWAt 6*E AT RENOVAL G DESCRIPTOR s OUENCY L1 SPA SPC SPO SPD x uw 501 .t 3r

'1501 2 3tE.gy 502 stSPA JF SPC ALP 4 E4E-01 - - - - - - --

SG3 1SPASPC Y S

4 SPCCL P g 9. 45E -03 504 . 15PASPC5PB .*

O*

W' I

u Na (9 0 DM

9 set , tsPAsPC5PBspo IAF 1. 3 tE -04 ra u,

an -

7b SPCDLD

9. 45E - 0 3 to

$lff IYAW)SSPG# #

$R a

~

NLP

" e, $WE -04 g'g ((i_,, soi . nsPAsocspeseo,nv n 1. w -or r-El

s L cd FI N AREA EVENI IAEE FOR LIERICK GEERATING STATION TRANSFER FROM FISOt HPCI INJECTION SUCCESSFUL

. . . . - . - - . - - _ _ . . - . - . _ _ _ . - . - . - . _ - - _ _ - - _ _ - . _ _ _ - - - - - - - - .-. _., u. r- - - _ .- --- -- - _ _ _ _ - - r --

t '

rsAru tR Fr<se samtssiar. . stsWE SSION SJM 5510rt 515M S510re FISC2 9001 C00LitsG A DLPHES$tMM U lure vt ht irs S P POOL C00L!r6 C POOL COOLir6 POOL COOLiffa AV AILABLE Avalt ABLE FOR HCIC lisJ AV AIL ABL1 F OR AVAll AR E FOR E 0 M AI RM01E ME AT REMOVEL AVAIL &BLE FOR HE AT HEMOVAL AVAILABLE FOR W AT REMOVAL SE M G HEAT EDOVAL Q S N OUENCY DESCRIPTOR L2 SPA SPC SPB SPD x gy 0 #

i-n sa t _2 s

1562 s e x .g.

500 s25PA y spcAt >

4 iT(-ci S03 asPAsPC y E

C SPCCtP

$ $74-03 SGd 1. 2SP15PC5HI y e-le "

=

nJ

&* sPCBLP gO 505 .25FASPCSPOSPD IRF 5 5tE-05

  • e Et

$~

+ @2 speoLP Yh-os e

o $. sot 29Avc5fe5Poe y

-- 4 a

RP d, 5 04E-04

.E G%

6"I ,, so r . PsPA secvesPoee r >A r 3x ca u e.

M S7 cs d FIE AREA EVENT IEE FOR LIMERICK GEPERATING STATION TRA:GFER FROM F1502 RCIC INJECTION SUCCESSFUL

. _ _ _ - . _ _ _ _ _ _ _ . ..-_ _______ - - - - - - - -- --- - - ~ ' -

TAatP4 E R f F SHUTDOW4 SHU T [F.M4 SHUIDOW4 5HUTLOW4 ' L IERPG . SMUIDOlf L L T E RI SHuTDowi aL TERPe SHUIDOIr9 Lt. TESIN SHuf 00er YENTING S P F1503 CGOL IF6 A COCLING E LOOL If6 B COOLING D CtXLING A COOLING C CDR ING B C00L ING D Ava!LABLE FOR csA IN AvartAatE ran AvatL ABLE FDR AWAIL ABLE FOR AV AIL AR E FDA S W AIL ABL E FOR AVAILABLE FOR AVAIL AR E FOA AVAIL AR E FOA M AT a m0t AL. E. SERENCE D 4 A7 ptwnwat ur At nemovat war aucv&L He st aucvat Hest awovAt e< AT MuavAt H AT amavat w AT amovat G FREGLENCt DESCRIPTOR S L3 SOA SDC SOB S00 ASDA ASDC AS00 AS00 av 401 t3

  • g - --

502 <3SDA v W t. 35 DAW F

-2 3#' '3SDASDC5LB F g 3 3 505 3SDASDCStaiSOD 7

?

lt tu o tw "e 5DCIR P g 3 91-02 SOF 3SDASDOSIB500ASDA .F a

O

r. :'
  • O ASDC AL P E, t '6#-91 50? u 3SDASDCSte500ASDAA5 Jir EI 8"

a0 h ASDrCLP 8 " -08 50e L 15t>ASDC5tE5DCASDA as mg

$i i M

  1. 4 AsocatP g 5 18E C2
  • 509 L 3%ASOr$0BSDDASDA AS ambi A500 5S
    • ASDLTAP

]eo IW-01 0%

"g ,'E3 "d _,, si s3soasocsassonA wAAs m sms u

9L 65 FIRE AREA EVENI TREE FOR LI84ERICK GDERATING STATION TRANSFER FROM FIS03 COAES SPAAY A FOR INJECTION

IRAFU ER f WJe LONE SPRAf B t PCI A LPCI C LPCI B LPCI D wsu a S P FtSO4 avail ABLE FOR AVA!! ABLE FOR SWAIL ABLE FOR A V AIL ABL E FOR AyalL ABLE FOR AVAIL ABLE FOR NO HIGH PR Ita) [4 ECTION IPLJE CTIOPa IPLM CIION INJECTION IN E CTION INJECT ION E SEQUENCE D cs r A:Ls 0 DESCRIPTOR g FRCOUCHCY t4 CSB tPCA LPCC 4PCB t PCO RSWB 501 4 tri i $2 0-J

-~ 150 4

.gg 502 .atSB tr e 2 05E 01 C5BL P

1. t((-01 503 'dCSBLPCA

. TRF t TEE 04 d

E (PCI AL P

3R -02 5Gd 6 dCSBLPCAt PCC im i Ow 05 B'

W*

8 g6_d LPCICLP g 50t t aCSBL PCaLPCCL PCB TN t 14E 06

$E sa a%

76 LPCIEILP 2 . 07E -02

  • $ S06 L 4LSSL PC ALPLCL PCBL PL t*# 2 SW 06 L PCIDL P

". d 07E-02

>E C=

p MQ .o7 : acsst Pr AtPCuPca et te

. i die ci re C:

n:

  1. 4 b5 FIRE AEA EVENI 1REE FOR LIERICK GEERATING STATION TRANSFER FROM FiSO4 NO HIGH PR. INJ. CSA FAILS

w w

S m

gggg g g & & A b a

: d se s 9 R g s s s g 5 e m

It gg 4 3

1 9 9

$  !* E d s i s 7

! d $3 {$$ '

59 i i  ! 5

-3 5. '

,  !  !  !  ?  ?  !  !

owa.

a a

8  :

y y a

s s e

si

.w EE sh g.g - >

sY b

$$s NU yft ,

n -r nB e

'W- *"

it

  • j:t

. a ,

B L $

j Eiabf ild 8*

s!!: ng 5 :t se.

_m ,

sga: -

,e*r K5 i

_ m . I. ,

t=e

,saa:

ug, s $

k 8..b.d s!s: $

2, :t #

o.da.

  • ew9 sa$d b*

1%=: k

'jt Sh b

...E a.

p"e: b it 9

. s . Y. 4 l

f9WS ,

d $

  • d?

$'8:~Y sw

g4  !

m i,.  ;

6,*4 l

  • 6e: g wt . *i gitW.

hto '

l bS$ 3 5 l sE s,M -@

s suo-3tc e - ma ivica ai t es-sc-r e no uc,r aen p aare OJ30 EC E Vash 95.-se s GE e want 6E G = A3 vth3tl14301% C