MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station TXX-9530, Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
.
2 -
g
= Log # TXX-92195 Fi1e # 10010.2 Ref. # 10CFR50.36 7tlELECTRIC April 15,1992 i WI!!!am J. Cahill, Jr.
Group Vice resident Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington,- OC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CISES) - UNIT 1 DOCKET NO. 50-445 MONTHLY OPERATING REPORT FOR MARCH 1992 Gentl einen :
Attached is the Monthly Operating Report for March 1992 prepared and submitted i
rsuant to Specification 6.9.1.5 of Appendix A (Technical Specifications) to ne Comanche Peak Unit 1 Steam Electric Station Operating License, NPF-87.
Sincerely, William J. Cahill, Jr.
By: U D. R. Woodlan Docket ',1 censing Manager JLR/grp Attachment c - Mr. R. D. Martin, Region IV Mr. T. Reis Region IV Resident Inspecters, CPSES (2)
Mr. T. A. Bergman, NRR Document Control Desk 9204210210 920331 }.' '
PDR ADOCK 05000445 ,
PDR R 400 N. Olive Street LB. 81 Dallas, Texas 7520t I Jl ~. t
Attachrhent to TX $ 92195
- i. Page 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETic. 50-445 UNIT: CPSES 1 DATE: April 15,1992 COMPLETED BY: Glenn G. Davis TELEPHONE: 817-897 5277 OPERATING STATUS
- 1. Repo,d.ing Period: March,1992 Gross hours in reporting period: 744
- 2. Currently authorized power level (MWt): 3411 Max. d > pend. capacity (MWe-Net): 1150
- Design Electrical Rating (MWe Net): 1150
- 3. Power level to which restricted (if a ly) (MWe-Net): None
- 4. Reasons for restriction (if any):
THIS MONTH YRTO DATE CUMULATIVE
- 5. Number of hours reactor was critical 744 2163.2 10578.4
- 6. Reactor reserve shutdown hours - 0 20.8 2003.3 744 2140.1 10349.3
- 7. Hours generator on line 0 0 0
- 8. Unit reserve shutdown hours 2,079,346 6,500,002 31,831,996
- 9. Gross thermal enorgy generated (MWH)
'~
688,005 2,164,318 10,501,316
- 10. Gros.; electrical energy generated IMWH)
- 11. Net Actrical energy generated (MWH) 655,850 2,069,703 9.965,267
- 12. Reactor Service factor 100.0 99.0 73.9
- 13. Reactor availability factor 100.0 100.0 87.9
- 14. Unit service factor 100.0 98.0 72.3
- 15. Unit availability factor 100.0 98.0 72.3
- 16. Unit capacity factor (Using MDC) 76.7 82.4 60.5
- 17. Unit capacity factor (Using Design MWe) 76.7 82.4 60.5 l 18. Unit forced outage rate 0 2.0 8.3 l' 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each): Refueling outage 2 wheduled to begin September 17,1992, with a duration of 70 days.
- 20. If shutdown at end of report peiiod, estimated date of startup:
- 21. Units in test ' status (prior to commercial operation): ACHIEVED Commercial Operation 900813 Estimated l
A'ttachmer' to TXX 92195 Page 2 of t AVERAGE DAILY UNIT POWER LEVEL DOCKETNO: 50 445 UNIT: CPSES 1 DATE: April 15,1992 COMPLETED BY: Glenn G. Davis TELEPHONE: 817 897-5277 MONTH: March ,1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEEL
- (MWe-Net) (MWe-Net) 1 1096 17 1100 2 1096 18 1100 3 1112 19 1102 4 1092 20 1091 5 1101 21 571 6 1069 22 460 7 911 23 462 8 947 24 521 9 1064 25 518 10- 1099 26 554 11 1100 27 536
-12 1101 28 536 13 1099 29 535 14 1097 3 '. 535 15- 1099 31 530 16 1095
Attachm3nt to TXX. 92195 Page 3of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO-. 50-445 UNIT: CPSES 1 DATE: April 15,1992 COMPLETED BY: Glenn G. Davis TELEPHONE: 817-897-5277 MONTH: March,1992 03/01 0000 Unit started rnort.h in Mode 1.
03/06. 1603 Power reduction to ren.ove moisture separator reheaters from service to perform minor leak repairs.
03/09- 0240 Initiated return to full power operation.
03/20 2100 Power reduction to perform maintenance on main feedwater pumps.
03/31 2400 Unit ended month ;n Mode 1.
l '
l Attachment to TXX- 92103 -
Page 4 of 4 ,
UNIT SHUTDOWNS AND POWER REDUCTIONS ,.
DOCKETNO- 50-445 UNIT: CPSES 1 DATE: April 15,1992 COMPLETED BY: Glenn G. Davis REPORT MONTH March,1992 METHODOF TYPE FHUTTING DOWN Ff0RCED DURATION THEREACTOROR N1 DATE SSCH5 DiiLER (HOURS) REAEX'N REDUCtNG POWER CQREECTIVE ACTIONSCON*AENTS 3 920306 S 58.6 B 1 mir.or leak repairs on moisture separator reheaters 4 920320 S 267.0 B 1 maintenance on main feedwater pumps l
- 1) REASCN 2) METHOD A EQUIPMENT FAILURE (EXPLAIN) E OPERATOR TRAINING AND UCENSE EXAMINATION 1: MANUAL B: MAINTOR TEST F: ADMINIST RATIVE 2: MANUALSCRAM C REFUEUNG G OPERATIONALElGOR(EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRlCTION H: OTHER (EXPLA:N) 4: OTHER (EXPLAIN)