Forwards Schedule for Completion of Open Items in NRC Review of Application for Ol,Per 830324 Request.Submittal Dates Not Const Dates Since Const Dates Cannot Be Determined Until Stop Work Order Lifted
ML20073J650
Person / Time
Site: Zimmer
Issue date: 04/14/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8304190360
Download: ML20073J650 (3)


Text

7

. : .m n THE CINCINNATI GAS & ELECTRIC COMPANY M CINCINNATI. OHIO 4520t L A BOROMANN SENIOR VICE PRCBIDENT April 14, 1983 Docket No. 50-358 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

RE:- WM. H. ZIMMER NUCLEAR POWER STATION -

UNIT 1 - SCHEDULE FOR COMPLETION OF OPEN ITEMS IN THE STAFF'S REVIEW OF THE APPLICATION FOR AN OPERATING LICENSE FOR ZIMMER This is in response to the NRC's March 24 letter to Mr. E. A. Borgmann from Mr. B. J. Youngblood, Chief Licensing Branch No. 1. Attached is a schedule for submission of information on the docket to NRR. Please notice that these are submittal dates and are not construction dates since construction dates cannot be determined until.the Stop Work Order is lifted.

Very truly yours, THE CINCINNATI GAS & ELECTR'IC COMPANY i O g)l By E. A. BORGMANN EAB: dew Enclosure cc: With Enclosure (See Reverse Side)

State of Ohio )

County of Hamilton)ss Sworn to and subscribed before me this /Y b day of April, 1983. ,

0}u,_ ]% . hinu b 0304190360 830 4 Notary.Public PDR ADDCK 05 58 ALICE M. LEURCK b PDR Notary Public, State of ONo My Commission bpires December 16.151.

~

(

cc: John H. Fry'e III M. Stanley Livingston Frank F. Hooper Troy B. . Conner, Jr.

John E. Dolan James P. Fenstermaker Steven G. Smith William J. Moran Stephen F. Koziar, Jr.

Samuel H. Porter James D. Flynn W. F. Christianson Lynne Bernabei, Esq.

John D. Woliver Deborah F. Webb David K. Martin George E._Pattison Andrew B. Dennison L. Kintner

e 4/14/83 ..

Y Wm. H. Zimmer Nuclear Power Station - Unit 1 Schedu3e for Completion of Open Items Applicant Subject Date* Status Toxic Chemical Protection 5/31/83 SSER 3 Para. 2.2.1 Contain. Internals, and Vac. Break 8/31/83 SSER 1 Para. 3.9.2 Pipe Vibration Test Criteria 1/31/83 C Staff Letter Containment and Internal Structures 8/31/83 SSER 3 Para. 3.8.1 and (Mark II) Para. 3.8.2 Seismic and Dynamic Qualification 12/28/82 C. SSER 3 Para. 3.10 of Equipment Environmental Qualification Report 2/3/83 C SSER 3 Para. 3.11 Staff Letter 2/22/83 Environmental Qualification 6/30/83 SSER 3 Para. 4.6.2 SDV Pipe Break (NUREG-0803) 3/31/83 C Staff Letter 1/10/83 Meteorological Data and Model 5/15/83 Staff Letter 12/6/82 Control System Failures 12/3/82 C 'SSER 3 Para. 7.7.3, FSAR Rev. 89 Hydrodynamic Loads in Containment 8/31/83 SSER 3 Para. 6.2.1 (Mark II)

Containment Vacuum Breaker 8/31/83 SSER 3 Para. 6.2.1 (See Response to 0110.32.& .33 in Rev. 91)

Humphrey Concerns 9/30/82 C SSER 3 Para. 6.2.1, FSAR Rev.

Interlocks for LPCI Valves 5/31/83 Staff Letter 2/22/83, Q212.81 Station Blackout Procedures 6/1/83 SSER 3 Para. 8 .1. 2 '

Separation for Conduits 3/31/83 Staff Letter 2/22/83

1 4/14/83 Wm. H. Zimner Nuclear Power Station - Unit' 1 Schedule for Completion of Open Items (Cont'd) Page #2 Applicant Subject Date* Status Modifications to Diesel Generator 3/31/83 SSER 3 Para. 9.6 Seismic & LOCA Loads on Fuel 6 / 8 / 8 3*

  • SSER 3 Para. 4.2.3 SDV Pipe Break (NUREG-0803) 3/31/83 C SSER 3 Para. 4.6.2, Staff Letter 1/10/83 Control of Heavy Loads 6/1/83 SSER 3 Para. 9.1.4 Revisions of FSAR 3/31/83 Staff Letter 2/22/83 I.D.1 Control Room Design Review 4/15/83 Response to Suppl. 1 to NUREG-0737 I.D.2 Safety Parameter Display 4/15/83 Response to Suppl. l' to NUREG-0737 I.C.5 Procedures for Feedback of 5/5/83 SSER 3 Para. 22.2 Operating Information I.C.1 Procedures for Transients 4/15/83 Response to Suppl. 1 to and Accidents NUREG-0737 III.A.l.1 Upgrade Emergency Prg. 11/19/82 C SSER 3 Para. 22.2 Suppl. 1 to NUREG-0737 III.A.l.2 Upgrade Emergency 4/15/83 Response to Suppl. 1 to Support Facilities NUREG-0737 III.A.2.2 Long Term Emergency Plan 4/15/83' SSER 3 Para 22.2 Response to Suppl. 1 to NUREG-0737 FEMA Findings N/A Notes:
  • Applicant date is the date for information submitted by the applicant by FSAR revisions '

or letters. A "C" after the date indicates the submittal was completed cn1 that date.

    • Generic Iten. between GE and NRC p

.. J