ML20083J788

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp Facilities at Long Island City,Ny;Houston, Tx & Coral Stream,Il. No Subj Matl Used in safety-related Sys.Approx 15 Manhours Expended in Review
ML20083J788
Person / Time
Site: Zimmer
Issue date: 12/28/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-83-06, IEB-83-6, LO2-83-161, LOZ-83-0161, LOZ-83-161, NUDOCS 8401050419
Download: ML20083J788 (2)


Text

,

3

-ms THE CINCINNATI GAS & ELECTRIC COMPANY M

CINCINN ATI. OHIO 45201 December 28, 1983 LOZ-83-0161 J. WILLI AM S, JR semos vics PatssorNT NUCLE AR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J.G. Keppler Regional Administrator Gentlemen:

RE:

WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 IE BULIETIN 83-06, NONCONFORMING MATERIALS SUPPLIED BY TUBE-LINE CORPORATION FACILITIES AT LONG ISLAND CITY, NEW YORK; HOUSTON, TEXAS; AND CAROL STREAM, ILLINOIS W.O.

57300, JOB E-5590, FILE NO. 956C, This letter is in response to I.E.Bulletin 83-06 concerning nonconforming materials supplied by Tube-Line Corporation Facilities at Long Island, New York; Houston, Texas; and Carol Stream, Illinois.

A review of purchasing documentation and subsequent investigation of suppliers and subvendors, determined that CG&E did not receive any Tube-Line material for use in safety related systems at Zimmer Nuclear Power Station.

I.E.Bulletin 83-06 is therefore not applicable to this facility.

In accord with your request to provide the following information, we advise that approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> were expended inthe review and preparation of this response.

There was no radiation exposure associated with the investigation.

~_

8401050419 831228 PDR ADOCK 05000358 G

PDR Thb g

ifE1Lil'\\o

ka t

Mr. J.G. Keppler Regional Administrator December 28, 1983 LOZ-83-0161 Page 2 We trust this will complete our responsibility in responding to I.E.Bulletin 83-06.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By

. 206

~

~

. IfYLLIAPIf,' J SENIOR VICE P SIDENT DJB/sfr cc:

NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Resident Site Supervisor ATTN:

W.M. Hill, Jr.

NRC Zimmer Project Inspector, Region III ATTN:

E. R. Schweibinz U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 (original)

-