Category:CORRESPONDENCE-LETTERS
MONTHYEARML20149G1941993-09-13013 September 1993 Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request IA-93-355, Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request1993-09-13013 September 1993 Partial Response to FOIA Request for Listed OI Repts.Record Listed in App D Being Withheld from Public Disclosure Because It Consists of Records Compiled for Law Enforcement Purposes.Nrc Continuing to Review Records Re FOIA Request ML20072C9611993-06-18018 June 1993 FOIA Request for Listed OI Repts ML20079D3191991-06-10010 June 1991 Forwards B Tatalovich Correspondence Re Plant ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20235W0981987-10-13013 October 1987 Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR IA-87-676, Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR1987-10-13013 October 1987 Final Response to FOIA Request for Records.No Records Subj to Request located.FOIA-87-40 in Name of Thomas Available in PDR ML20235W0951987-10-0808 October 1987 FOIA Request for All FOIA Requests Made for Zimmer Plant or GE Mark I or II Containment by Cincinnati Gas & Electric, Dayton Power & Light or Columbus & Southern Ohio Electric & FOIA 87-40 ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20209G6751987-03-27027 March 1987 FOIA Request for All Matls Made Available in Accordance W/ FOIA 87-40 & All Matls Produced to Either Plaintiffs in Zimmer Litigation &/Or GE ML20212H6601987-01-20020 January 1987 Final Response to FOIA Request.App F Documents Re Marviken II Project Encl & Available in PDR ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20210L2601986-03-20020 March 1986 Forwards Endorsement 31 to Nelia Policy NF-206 ML20141N2771986-01-14014 January 1986 Partial Response to FOIA Request for Seven Classes of Documents.Forwards App a Documents.App B Documents Available in Pdr.App C Documents Outside Scope of Request,Per 860114 Telcon W/Ca Reed ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20136D8751985-11-0606 November 1985 Further Response to FOIA Request for Documents Re H Hoyt & Aloot Oct 1983 Rept on NRC Investigations at Facility. Listed Documents Encl & Available in Pdr.Certain Documents Totally Withheld (Ref FOIA Exemptions 5 & 7) ML20136J3371985-08-0101 August 1985 Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7) ML20134D7991985-08-0101 August 1985 Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-84-604, Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-08-0101 August 1985 Responds to FOIA Request for Documents Re Ofc of Investigation Repts on Facility.Documents Listed on Encl Printout Located in Ofc of Investigations as of 850227. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-684, Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-08-0101 August 1985 Final Response to FOIA Request for Documents Re Facility.Documents Listed on Encl Printout Located in Ofc of Investigations.Documents Withheld (Ref FOIA Exemptions 5 & 7) ML20134D5821985-07-31031 July 1985 Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7) ML20133Q2231985-07-31031 July 1985 Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-787, Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7)1985-07-31031 July 1985 Responds to FOIA Request for Documents Which Resulted in Issuance of Notice of Violation to Util in Nov 1981. Documents Withheld (Ref FOIA Exemptions 5 & 7) IA-83-655, Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7)1985-07-31031 July 1985 Final Response to FOIA Request for Documents Re Wh Zimmer Nuclear Power Station.Forwards Computer Printout of Document.W/O Encl.Documents Contained in Ofc of Investigation Files Withheld (Ref FOIA Exemptions 5 & 7) ML20133Q3771985-07-29029 July 1985 Responds to FOIA Request for Ofc of Investigations Documents Re Wh Zimmer Nuclear Power Station.Forwards List of Documents as of 840227.All Documents Withheld (FOIA Exemptions 5 & 7) ML20129J4671985-07-15015 July 1985 Informs That Util 821124 Application for Extension of Const Completion Date Fee Exempt.Refund Being Processed ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20133B5651985-05-10010 May 1985 Partial Response to FOIA Request for Four Categories of Documents Re Facility.Forwards App a Documents.Documents Also Available in Pdr.App B Documents Already Available in Pdr.Search Continuing ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20127F5341985-04-18018 April 1985 Partial Response to FOIA Request for Records Re BNL Investigation of Ee Kent Allegations.Forwards App a Documents.Documents Also Available in Pdr.Remaining Documents Will Be Forwarded Upon Completion of NRC Review ML20099M2911985-03-15015 March 1985 Forwards Endorsement 27 to Nelia Policy NF-249 ML20129B9301985-02-19019 February 1985 FOIA Request for Documents Re DOJ Inquiry Into Potential Wrongdoing by NRC Employees in Dealing W/Tmi & Zimmer Plants & Dh Gamble Testimony from TMI Restart Proceeding ML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20125B8661985-01-17017 January 1985 Further Response to FOIA Request for Documents Re Oct 1983 Rept by H Hoyt & Aloot on NRC Investigations.Forwards App a Documents.Documents Also Available in Pdr.Info Partially Withheld (Ref FOIA Exemptions 2,6 & 7) ML20128E4161984-12-27027 December 1984 Interim Response to FOIA Request for All Agency Documents Re Oct 1983 Rept by Judge H Hoyt & Aloot on NRC Investigations at Facility.Forwards Documents.Documents Partially & Completely Withheld (Ref FOIA Exemptions 5-7) ML20101F7621984-12-20020 December 1984 Forwards Endorsement 26 to Nelia Policy NF-249 ML20129J2141984-12-0707 December 1984 Responds to FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility.Documents Withheld (Ref FOIA Exemption 5) ML20093M2541984-10-18018 October 1984 Requests Written Verification of Implementation of Site Restoration Plan So CPPR-88 May Be Terminated ML20129J2031984-10-11011 October 1984 FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility ML20107L6521984-07-19019 July 1984 FOIA Request for All Documents Re Insp Rept 50-358/84-04 ML20105C9801984-07-19019 July 1984 FOIA Request for Documents Re Ofc of Investigation Rept on Facility.If Requested Matls Still Protected,Copies of Matls W/Protected Sections Redacted Requested ML20151J1601984-06-0505 June 1984 Forwards IE Insp Rept 50-358/84-04 on 840220-0426.Insp Covered Status of Welding Procedure & Welder Performance Qualifications ML20091L5991984-06-0404 June 1984 Forwards Util 840601 Response to NRC 840503 Request for Addl Info Re Environ Review of Request to Withdraw Application for Ol.Five Oversize Drawings Encl.Aperture Cards Are Available in Pdr.Related Correspondence ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20128E3861984-05-22022 May 1984 FOIA Request for All Agency Records or Info Re Oct 1983 Rept by Judge H Hoyt & Aloot Re NRC Investigations at Facility ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per 1993-09-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20072C9611993-06-18018 June 1993 FOIA Request for Listed OI Repts ML20079D3191991-06-10010 June 1991 Forwards B Tatalovich Correspondence Re Plant ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20235W0951987-10-0808 October 1987 FOIA Request for All FOIA Requests Made for Zimmer Plant or GE Mark I or II Containment by Cincinnati Gas & Electric, Dayton Power & Light or Columbus & Southern Ohio Electric & FOIA 87-40 ML20209G6751987-03-27027 March 1987 FOIA Request for All Matls Made Available in Accordance W/ FOIA 87-40 & All Matls Produced to Either Plaintiffs in Zimmer Litigation &/Or GE ML20210L2601986-03-20020 March 1986 Forwards Endorsement 31 to Nelia Policy NF-206 ML20099M2911985-03-15015 March 1985 Forwards Endorsement 27 to Nelia Policy NF-249 ML20129B9301985-02-19019 February 1985 FOIA Request for Documents Re DOJ Inquiry Into Potential Wrongdoing by NRC Employees in Dealing W/Tmi & Zimmer Plants & Dh Gamble Testimony from TMI Restart Proceeding ML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20101F7621984-12-20020 December 1984 Forwards Endorsement 26 to Nelia Policy NF-249 ML20093M2541984-10-18018 October 1984 Requests Written Verification of Implementation of Site Restoration Plan So CPPR-88 May Be Terminated ML20129J2031984-10-11011 October 1984 FOIA Request for Interim or Final Repts Generated by Ofc of Investigation Re Facility ML20105C9801984-07-19019 July 1984 FOIA Request for Documents Re Ofc of Investigation Rept on Facility.If Requested Matls Still Protected,Copies of Matls W/Protected Sections Redacted Requested ML20107L6521984-07-19019 July 1984 FOIA Request for All Documents Re Insp Rept 50-358/84-04 ML20091L5991984-06-0404 June 1984 Forwards Util 840601 Response to NRC 840503 Request for Addl Info Re Environ Review of Request to Withdraw Application for Ol.Five Oversize Drawings Encl.Aperture Cards Are Available in Pdr.Related Correspondence ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20128E3861984-05-22022 May 1984 FOIA Request for All Agency Records or Info Re Oct 1983 Rept by Judge H Hoyt & Aloot Re NRC Investigations at Facility ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per ML20084M0911984-05-0404 May 1984 Advises That Preventive Maint & QA Programs Will Be Discontinued on 840518 Due to Termination of Const & Dismissal of Application.Snm Provisions Will Remain in Effect Until Removal of Matl ML20112H8101984-04-0505 April 1984 FOIA Request for Repts Resulting from Listed Environ Qualification of Equipment Site Audits to Be Placed in Pdr. Access to Any Repts Resulting from Audits Held Since Oct 1982 Also Requested ML20084P3501984-03-14014 March 1984 Requests Response to Encl W & V Smelser 840210 Inquiry Into NRC Attitude Toward Utils.Concerns Include Marble Hill & Bailly Cancellation,Withdrawal of Util Application for Zimmer & Denial of License for Byron Facility ML20114A3121984-03-12012 March 1984 FOIA Request for Facility Nonconformance Repts ML20113D2281984-03-0808 March 1984 FOIA Request for Copies of All Nonconformance Repts on Facility from Start of Const to Present ML20087D1131984-03-0505 March 1984 Forwards Natl Board of Boiler & Pressure Vessel Inspectors to State of Oh Re Util Abandonment of Facility as Nuclear Unit & Board Willingness to Provide Support Should Plant Be Reinstated ML20083P2521984-02-29029 February 1984 FOIA Request for Correspondence Between Util,Hj Kaiser & NRC Referenced in Encl Ohio Civil Rights Commission ML20114A3081984-02-28028 February 1984 FOIA Request for All Region III Insp Repts from Nov 1983 to Present & All Communications Between Region III & Bechtel, Dayton Power & Light Cincinnati Gas & Electric Co Representatives Re Facility ML20102A0241984-02-28028 February 1984 FOIA Request for Region III & IE Repts from Nov 1983 to Present & Communications Between Region III & Util,Bechtel or Kaiser Corp Officials ML20084R6521984-02-24024 February 1984 FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl ML20086P7291984-02-17017 February 1984 Forwards Revised Organization Chart,Effective as of 840217. Organizational Changes Due to Decision to Convert Station from Nuclear to coal-fueled Generating Facility ML20083N2371984-02-17017 February 1984 FOIA Request for Four Categories of Documents Re Facility ML20083N2621984-02-16016 February 1984 FOIA Request for Interim Repts Issued by Ofc of Investigation Re Plant,Including DOJ Rept Re Harassment of QC Inspectors ML20086P6321984-02-16016 February 1984 Confirms 840202 Telcon Understanding That,Pending Final Commission Action for Withdrawal of Application,No Need Exists to Continue Previously Required Submittals to NRC ML20112E1481984-02-10010 February 1984 Appeals Denial of 831123 FOIA Request for 831115 Transcript Re Pending Plant Investigations & Documents Prepared After Discussing 830701 Staff Decision Not to Approve Util Actions for Plant ML20080A9041984-01-30030 January 1984 Forwards Comments on Reactor Controls,Inc (Rci) 830915 Response to Draft IE Info Notice Re Const Deficiencies,Per 831017 Request.Work Orders for Lateral Restraint Beams Not Issued to Rci ML20079S2451984-01-27027 January 1984 Informs of 840120 Agreement to Cease Const of Facility as Nuclear Plant & Convert Plant to coal-fired Facility. Ej Wagner Designated Responsible for Closing Out Nuclear Activities at Facility ML20079P4161984-01-24024 January 1984 Requests Completion of Pending Actions on 831216 Plan to Verify Quality of Const,To Closeout Outstanding Items in 821112 Order to Show Cause & Order Immediately Suspending Const ML20079M8961984-01-20020 January 1984 Forwards Personnel Resumes Inadvertently Omitted from Re Independent Auditor for Plan to Verify Const ML20079N2161984-01-19019 January 1984 Requests Written Concurrence for Training Activities,As Outlined.Facility Site Directives & Master Training Plan for All Site Training Will Be Provided to Region Iii,Per ML20079N1991984-01-19019 January 1984 Informs That Training Directive ZPM-TR.101 & Master Training Plan Developed for NRC Review ML20079F1291984-01-16016 January 1984 Requests NRC Approval of Teledyne Engineering Svcs as Independent Design Review (Idr) Contractor.Teledyne Proposal Forwarded.Criteria Used During Evaluation & Presentation Matl from NRC 840113 Meeting Encl ML20079G1841984-01-13013 January 1984 Forwards Resumes for Principal Positions Noted on Organization Chart in Section IV of Ebasco 831205 Proposal Re Independent Auditor for Plan to Verify Const ML20086K1081984-01-13013 January 1984 Forwards Council of City of Cincinnati Resolution R/18-1984 Which Expresses Dissatisfaction Over NRC Failure to Require third-party Independent Review of Facility ML20080F0441984-01-13013 January 1984 Notifies of Approval of Resolution R/18-1984 Expressing City of Cincinnati Council Dissatisfaction Over NRC Failure to Require third-party Independent Review of Facility. Resolution Encl ML20079H2891984-01-11011 January 1984 Submits Partial Response to Util Plan to Verify Quality of Const for Facility.Counsel for Miami Valley Power Project Decision Not to Attend 840111 Public Meeting Clarified. Related Info Encl ML20086L8371984-01-11011 January 1984 Requests Development of Proposed Facility Public Oversight Committee.Committee Establishment Would Inspire Public Confidence ML20079F3731984-01-10010 January 1984 Forwards Packet of Newspaper Articles Re Facility.Packet Acts as Chronological Summary of Major Events During 14 Months Prior to 831201 ML20079E2401984-01-10010 January 1984 Forwards Quality Confirmation Program, Monthly Rept for Dec 1983,per Rf Warnick ML20080F0291984-01-10010 January 1984 Notifies of 840105 Adoption of Motion Advising NRC That Limiting Public Participation to Time Permitting at 840111 Meeting Not in Best Interest of City of Cincinnati or Citizens ML20083J1491984-01-10010 January 1984 Advises That Cincinnati City Council Adopted Vice-Mayor M Spencer Encl Motion Before Council Opposing Limited Public Participation at 840111 Meeting Between NRC & Util 1993-06-18
[Table view] Category:UTILITY TO NRC
MONTHYEARML20100B6181985-01-30030 January 1985 Forwards Payment of Bill D-0089.Fee Paid.W/O Encl ML20091J1321984-06-0101 June 1984 Forwards Environ Review of Zimmer Site Status for Cincinnati Gas & Electric Co, in Response to NRC 840503 Request for Addl Info Re Withdrawal of OL Application.W/ Three Oversize Figures.Apertures Cards Are Available in PDR ML20091A2141984-05-22022 May 1984 Forwards Ohio Edison Annual Rept,1983, Toledo Edison Co 1983 Annual Rept, Duquesne Light Co Annual Rept,1983 & Cleveland Electric Illuminating Co 1983 Annual Rept ML20084P2401984-05-11011 May 1984 Advises That Addl Info for Environ Review of Request to Withdraw OL Application Will Be Provided by 840601,per ML20084M0911984-05-0404 May 1984 Advises That Preventive Maint & QA Programs Will Be Discontinued on 840518 Due to Termination of Const & Dismissal of Application.Snm Provisions Will Remain in Effect Until Removal of Matl ML20086P7291984-02-17017 February 1984 Forwards Revised Organization Chart,Effective as of 840217. Organizational Changes Due to Decision to Convert Station from Nuclear to coal-fueled Generating Facility ML20086P6321984-02-16016 February 1984 Confirms 840202 Telcon Understanding That,Pending Final Commission Action for Withdrawal of Application,No Need Exists to Continue Previously Required Submittals to NRC ML20080A9041984-01-30030 January 1984 Forwards Comments on Reactor Controls,Inc (Rci) 830915 Response to Draft IE Info Notice Re Const Deficiencies,Per 831017 Request.Work Orders for Lateral Restraint Beams Not Issued to Rci ML20079S2451984-01-27027 January 1984 Informs of 840120 Agreement to Cease Const of Facility as Nuclear Plant & Convert Plant to coal-fired Facility. Ej Wagner Designated Responsible for Closing Out Nuclear Activities at Facility ML20079P4161984-01-24024 January 1984 Requests Completion of Pending Actions on 831216 Plan to Verify Quality of Const,To Closeout Outstanding Items in 821112 Order to Show Cause & Order Immediately Suspending Const ML20079N1991984-01-19019 January 1984 Informs That Training Directive ZPM-TR.101 & Master Training Plan Developed for NRC Review ML20079N2161984-01-19019 January 1984 Requests Written Concurrence for Training Activities,As Outlined.Facility Site Directives & Master Training Plan for All Site Training Will Be Provided to Region Iii,Per ML20079F1291984-01-16016 January 1984 Requests NRC Approval of Teledyne Engineering Svcs as Independent Design Review (Idr) Contractor.Teledyne Proposal Forwarded.Criteria Used During Evaluation & Presentation Matl from NRC 840113 Meeting Encl ML20079E2401984-01-10010 January 1984 Forwards Quality Confirmation Program, Monthly Rept for Dec 1983,per Rf Warnick ML20083J1551984-01-0606 January 1984 Forwards Rev 2 to Vols 1 & 2 of Environ Qualification Rept for Class IE Equipment & Vol 1 of Environ Qualification Rept for Mechanical Equipment ML20083J7881983-12-28028 December 1983 Responds to IE Bulletin 83-06, Nonconforming Matls Supplied by Tube-Line Corp Facilities at Long Island City,Ny;Houston, Tx & Coral Stream,Il. No Subj Matl Used in safety-related Sys.Approx 15 Manhours Expended in Review ML20083D6601983-12-22022 December 1983 Forwards Continuation of Const Plan, Submitted in Response to Section IV.B.(2)(b) of 821112 Order to Show Cause & Order Immediately Suspending Const.Response to 831028 & 1115 Questions Also Encl ML20083D6521983-12-22022 December 1983 Forwards Continuation of Const Plan, Submitted in Response to Section IV.B.(2)(b) of 821112 Order to Show Cause & Order Immediately Suspending Const (CLI-82-33) ML20083B6941983-12-19019 December 1983 Forwards Plan to Verify Quality of Const, in Response to Section IV.B.(2)(a) of NRC 821112 Order to Show Cause & Order Immediately Suspending Const (CLI-82-33) ML20083F6251983-12-16016 December 1983 Forwards Completed Facility Staffing Questionnaire,Per NRC 831206 Submittal.Eleven Reactor Operators & 35 Senior Reactor Operators Assigned to Shift Work ML20083B7171983-12-16016 December 1983 Forwards Plan to Verify Quality of Const, in Response to Section IV.B.(2)(a) of NRC 821112 Order to Show Cause & Order Immediately Suspending Const.Plan Includes Responses to Questions in 831028 & 1115 Ltrs ML20083G6181983-12-14014 December 1983 Notifies That WT Gott & RW Link Will Attend 840111 Meeting to Discuss Scheduling Problems W/Nrc Exam Process ML20083F9061983-12-14014 December 1983 Forwards Nov Monthly Status Rept for Quality Confirmation Program,Per ML20082V2151983-12-0909 December 1983 Forwards Correction to 831006 Response to NRC Request for Info Re Control of Heavy Loads.All Cranes & Hoists Purchased to Sargent & Lundy Specs ML20083A6641983-12-0808 December 1983 Forwards 831108 & 09 Deficiency Repts Re Evaluation of Cable Tray & Conduit Support Welding & Adequacy of Threaded Nelson Studs Used on Cable Tray Supports & Structural Steel Bolting ML20082T0801983-12-0808 December 1983 Submits Line Inadvertently Omitted from Page 20 of 831109 Response to NRC Question 5 Re Course of Action ML20083E4061983-12-0606 December 1983 Forwards Ebasco Svcs,Inc Proposal, Audit of Program to Verify Quality of Const & Continuation of Const Plan, for NRC Approval,Per 821112 Order to Show Cause Requiring Independent Auditor ML20082S5051983-11-30030 November 1983 Forwards Corrected Affidavit Replacing Affidavit Submitted w/830930 Application for Withholding from Public Disclosure Rev 1 to 003-1R-001, Safety Parameter Display Sys.. ML20082N0941983-11-29029 November 1983 Forwards Comments on Torrey Pines Technology 831116 Comments on Util Course of Action.Operations Personnel Will Be Intimately Involved in Planning,Managing & Executing Startup Testing Program ML20082M2461983-11-29029 November 1983 Suppls 831121 Response to NRC Re Util Course of Action.Responses to Questions 16,17 & 2 Encl.Responses Do Not Reflect Replacement of Hj Kaiser W/Bechtel as Constructor ML20082H5891983-11-23023 November 1983 Discusses Proposed Course of Action for Verification of Const Quality & Completion of Const in Response to NRC .Bechtel Will Assume Responsibilities of Constructor,W/Kaiser Co Performing Limited Role ML20087J8181983-11-22022 November 1983 Requests Addl 60 Days to Accomplish Review of Work Performed by Reactor Controls,Inc,In Response to NRC 831017 Draft Info Notice.Extension Required Due to Physical Walkdown of Selected Sys ML20082H7801983-11-21021 November 1983 Forwards Responses to NRC Questions Re Course of Action,Plan for Vertification of Quality of Const & Continuation of Const Plan.W/O Response to Plan Continuation ML20082E7991983-11-21021 November 1983 Forwards Responses to NRC Questions Re Scope of Plan to Verify Quality of Const Raised in Encl 1 to 831115 Submittal ML20082J0001983-11-18018 November 1983 Provides Addl Info Re Scope of Plan to Verify Const Quality & Extent of Hardware Insps,In Response to Questions Raised at 831101 Meeting.Scope Will Encompass All safety-related Structures,Sys & Components ML20082E8141983-11-18018 November 1983 Forwards Addl Info in Response to Questions Raised During 831101 Meeting Re Scope of Plan to Verify Quality of Const & Extent of Insp of Hardware.Visual Insp Will Be Conducted on Hvac,Piping & Electrical Sys ML20082K5241983-11-15015 November 1983 Forwards Quality Confirmation Program, Monthly Rept for Oct 1983 ML20082E7381983-11-15015 November 1983 Forwards Certificate of Svc for Amend 152 in Form of Rev 98 to FSAR ML20082E8401983-11-0909 November 1983 Forwards Responses to Questions in Encl 1 of NRC Re Planned Course of Action.Responses to Encls 2 & 3 Will Be Provided W/Plan for Verification of Quality of Const & Continuation of Const Plan ML20081F3211983-10-31031 October 1983 Comments on Course of Action (Coa) Submitted to NRC by Cincinnati Gas & Electric on 831005.COA Fails to Recognize Dayton Power & Light (Dp&L) Investment by Not Giving Dp&L Meaningful Participation in Project Oversight ML20081F2671983-10-27027 October 1983 Forwards Response to NRC 821112 Order to Show Cause & Order Immediately Suspending Const.Response Includes Charters for Oversight Committee & Advisory Staff & Lists of Bechtel,Ge, Sargent & Lundy & Util Personnel Assigned to Facility ML20082B5581983-10-26026 October 1983 Requests Concurrence in Outlined Approach to Independent Design Review.Approval Necessary Prior to Contract Award. Bidders List,Rfp & Portions of Order Suspending Const Encl ML20081F2201983-10-25025 October 1983 Forwards Aug & Sept 1983 Quality Confirmation Program Status Repts & Summary Sheet ML20081J9971983-10-21021 October 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-358/83-17.Corrective Actions:Policy for Reporting Deficiencies,Per 10CFR50.55(e),revised to Provide Immediate Corrective Action to Ensure 30-day Written Submittal ML20078R4961983-10-21021 October 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-358/83-12.Corrective Actions:Procedure Mcar 83-13, Reverification of CG&E Corrective Action Program, Developed & Personnel Adequately Trained ML20080U5141983-10-18018 October 1983 Responds to IE Bulletin 83-05 Re ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co.After Review of Purchasing Documentation & Investigation of Suppliers & Subvendors,Util Determined IE Bulletin Not Applicable ML20078N4401983-10-12012 October 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-358/81-13.Provides Addl Info Pending Changes to ASME Code,Paragraph Nx 4427 ML20078M0361983-10-11011 October 1983 Summarizes Proposed Welding Reinsp Program of Class I Structural Steel as Discussed During 830811 Site Meeting. Welds Found W/Major Deficiencies Will Be Reworked.Program Details Encl ML20085J5941983-10-0707 October 1983 Forwards Certificate of Svc of Amend 151 to 830930 Application for Licenses in Form of Rev 97 to FSAR ML20078G4821983-10-0606 October 1983 Forwards Response to Phase I of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Per Bj Youngblood 830811 Request for Addl Info.All Cranes & Hoists Purchased to Sargent & Lundy Specs 1985-01-30
[Table view] |
Text
_
pp- ww y b'
TIIE CINCINNATI GAS & ELECTI11C CON 11'ANY c72
- 7- J CI NCINN AT1, OH 45202-4003 January 30, 1984 LOZ-84-0014 Docket No. 50-358 f twclPAL STAFF U.S. Nuclear Regulatory Commission Region III y gyei 3g
- gap NfS' 799 Roosevelt Road M R.A g-Glen Ellyn, Illinois 60137 agg acs V (fil Mr. J. G. Keppler 3A ML Attention: %;F Fi10 SOE Regional Administrator Gentlemen:
RE: WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 DRAFT IE INFORMATION NOTICE: REACTOR CONTROLS INCORPORATED CONSTRUCTION DEFICI?.NCIES W.O. 57300, JOB E-5590, FILE 956C This letter constitutes our response to your October 17, 1983 letter requesting comments on the Reactor Controls, Incorporated (RCI) September 15, 1983 response to the draft information notice.
The attachment includes both the NRC draft IE Information Notice and the RCI response and provides CG&E's comments.
Pleas _ note that the November 4 due date requested in your letter was modified to November 22 per discussions with your Messrs. W. L. Forney and T.
P. Gwynn, and was later extended an additional 60 days as requested in our letter LOZ-83-0237 dated November 22, 1983.
We trust that the attached comments will be of use to you in finalizing the information notice.
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By
_ J. WAGB R ASSISTANT VICE PRESIDENT NUCLEA ENGINEERING DJC/cse Attachment cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site Supervisor ATTN: W. h. Hill NRC Zimmer Project Inspection, Region III ATTN: E. R. Schweibinz FEB g Jgg4 8402060393 840130 PDR ADOCK 05000358
-- - -- - -- --- *l'gh i
' GENERAL OVERVIEW In December 1973, CC&E CCD Contract H-2832 was awarded to Reactor Controls, Inc. (RCI) to furnish the Control Rod Drive (CRD) hydraulic system piping and drain lines, to design and install the CRD hydraulic system piping and supports, and to install the Reactor Pressure Vessel (RPV) internals.
In December 1980, a stop work order directed that all work on materials, equipment, or supports, furnished or installed by RCI, be discontinued, pending verification of the adequacy of RCI's design, procedures, and documentation, and the performance of field verification of installed hardware. A letter from the NRC dated December 24, 1980 directed that further work by RCI not be allowed until the NRC has reviewed corrective actions and has determined that such actions were satisfactorily completed. In July 1981, the responsibility for the design of the CRD tubing was transferred f rom RCI to S&L.
Except for the remo/al of various type S-7, S-8, and S-9 hangers, and work performed on the CRDM work platform (see CG&E response to Item 1), no modifications have been made to the equipment listed in the draf t IE Notice.
A preliminary walkdown, planned for scoping the completion of work, was completed January 6, 1984. The walkdown results were used to aid in our evaluation of statements made by RCI in their September 15, 1983 letter to the NRC. A detailed walkdown will be conducted as part of the Plan to Verify the Quality of Construction (PVQC).
CG&E's comments on both the draf t IE Notice and the RCI response are provided as follows. For your convenience, we have included the verbatim text of each item in the draft IE Notice, followed by the verbatim RCI response for that item, followed by the corresponding CG&E comments.
K5011901
4 NRC DRAFT IE NOTICE:
- 1. Control Rod Drive Mechanism (CRDM) Work Platform (Approximate el 523 f t)
This platform furnished by the nuclear steam supply system (NSSS) vendor was supported by a circular assembly of structural steel on which is mounted a circular steel track. The work platform rotates on this track. An examination of the support assembly showed the following:
- a. Tie plates f rom one section of the circular beam to another in four j locations did not have washers under the bolting as required by the design specification. The minimum bolt hole-to edge distance of at lecst two of the tie plates was not maintained. In once case, the web thickness appeared to be 1/4 in, compared with the required 11/16 in. (See Table 1.16.5 of AISC Specification " Design, Fabrication and Erection of Structural Steel for Buildings," 7th Edition, AISC Manual).
- b. The bolts holding the circular beam to the seats which were welded to wall embedment plates were installed through irregular holes.
These holes significantly exceed AISC requiretents foi enlarged holes and consequently require plates or plate washers for assembly. Such plates were not used. Bearing surfaces for wachers used were inadequate and the workmanship was unacceptable. This condition was common to all eight supports.
- c. The rail was bolted to the circular beam using A-307 machine bolts through clamping pieces fitted to the flange of the rail. No filler pieces were used to raise the clamping pieces to the minimum flange thickness in accordance with the suggested practice of AISC (pp.
1-140, 7th Edition, AISC Manual). This resulted in a significant eccentric load on the bolt heads which exceeded the maximum permissible slope of it20, as stated in the governing 1969 AISC specifica tion.
- d. The rails were spliced with plates which were jammed between the flange and the underside of the upper rail section. These splice plates did not seat properly in the web of the rail, leaving an excessive gap of more than 3/8 in, between the plates and the web.
This resulted in less than full-thread engagement between the track bolts and the nuts. The condition was common to all eight plates (four splices).
l K5011901
RCI RESPONSE:
Item 1 - Control Rod Drive Mechanism (CRDH) (sic) Work Platform a,b,c & d At anytime during installation of the customer supplied equipment, of which this item is one example, when the work could not be completed in accordance with drawings and/or specification requirements, the customer or his agent were contacted to provide resolution. Any and all deviations were approved by the customer or his agent through issuance of a Field Deviation Disposition Request (FDDR). Reactor Controls, Inc. did not supply any waterial or items for this installation, and any deviations f rom the AISC Manual or other specifications, were the responsibility of the equipment designer and supplier. RCI did not provide any of the materials or items installed. Everything was provided to RCI by the owner except welding materials, which RCI did provide.
RCI can accept as fact that the items as reported during the recent examination may be true. However, we strongly point out that in the years since RCI lef t that jobsite a lot of disassembly, reassembly and modifictions may have been performed. Therefore, to suggest that the present status is the work of RCI is presumptious.
Comment: At the time of installation, the CRD Work Platform was considered temporary due to interferences preventing proper operation and future modification would be required to enable proper operation. RCI did the work in accordance with the customer instructions as the platform was necessary to perform other installation operations. The rework of the platform was not performed by Reactor Controls, Inc. and possibly has been reworked since RCI left the jobsite.
CG&E COMMENTS
- The only work which has been done on the CRDM Work Platform since RCI left the site was performance of load testing, adjustment of brakes, and replacement of cables.
GE Drawing No. SEI 10170 R3 Sheet 3 of 5 provides a list of material supplied by GE and details of splices. RCI did not conform to the design.
GE Drawing No. 761E259 states the following:
"Only the parts listed and identified by vendors name and identification numbers have been approved. A substitute shall not be used without prior approval by APED engineering."
A review of the available documentation found no record of correspondence f rom RC1 regarding missing parts or other deficiencies noted by the NRC regarding the CRDM Work Platform. This suggests that the deficiencies noted in parts la through Id were the responsibility of RCI. In addition, GE Drawing No. 761E259 requires the platform to conform to AISC, AWS, ANSI, SSPC, and OSHA standards. RCI did not meet these requirements.
K5011901
'NRC DRAFT IE NOTICE:
- 2. CRDM Lateral Restraint Beam (Approximate el 533 ft)
This beam surrounded the lower CRDM housings and restrained CRDM lateral novement. It was bolted to eight seats which were welded to embedment plates in the wall of the reactor cavity. Each connection was made by l eight 1-in., A-325 structural steel bolts.
I a. The bolting of the beam to the supports was found to be loose. Two I bolts were finger tight. Three others checked with a torque wrench .
were found to be only snug tight. Gaps in the faying surfaces indicated that the condition was common to all eight supports,
- b. The frame itself was assembled with tie plates which did not have washers on the structural steel bolts. This condition was common to all eight plates. On one tie plate it was found that three common machine bolts had been substituted for the high strengh structural steel bolts.
RCI COMMENTS:
Item 2 - CRDH (sic) Lateral Restraint Beam
- a. During installation of the beams, all bolts were tightened with wrenches without reference to specific torquing valves (sic). RCI did not receive specific torque value requirements for any bolting installations for the period of time work was performed. Lat e r, Sargent & Lundy Engineers did prepare and issue a torquing procedure titled Ccncrete Fastener Installation Procedure (CFIP) but it was not issued to Reaator Controls. Inc. It is likely, others have performed work in these areas since RCI lef t the site as it has been determined all bolts were tight when installation was complete.
- b. The use or non use of washers during installation cannot be determined from information available to RCI. The use of common machine bolts by RCI is unlikely as RCI did not provide any equipment or material during installation.
Comment: Attached please find a copy of a CG&E Field Work Order No.
RCI-l dated August 22, 1975. This is typical of the manner in which RCI was directed to perform operations which did not initially meet drawing or specification requirements. RCI does not have copies of the FDDRs as CG&E issued Field Work Orders to direct RCI performance of work outlined in the FDDRs.
CG&E COMMENTS:
Item 2 The CFIP procedure referenced in RCI's response applies to concrete expansion anchors, not high strength bolting. Therefore, this is an incorrect ref e re nc e. Torque requirements for high strength structural bolting is provided in the AISC Code, as referenced in ba'. Specification H-2832.
Our review indicates that the GE design called for washers to be installed and that no FDDRs were implemented on the lateral restraint beams. In addition, there were no work orders issued to RCI for modifications to the lateral re straint beams.
K5011901
NRC DRAFT IE NOTICE:
- 3. CRDM Housing Support Assembly This device was assembled in an apparently temporary fashion. The assembly was reported to conform to NSSS drawings. The following apparent anomalies existed between drawings and the installed assembly:
- a. The assembly had sharp angular faces resting against flat washers in a fashion contrs2y to accepted practice.
- b. The assembly had two dif ferent surface treatments of the parts contrary to the drawings which specified Carbo-Zinc paint only.
- c. Examination of the upper support beams which spanned the reactor cavity and support the CRDM housing support assembly, showed that the west end of beam No. 3 was locked into the wall socket by a fillet veld. This fittlet (sic) weld was cracked.
The applicant has asked the NSSS vendor to provide definitive procedures and drawings for this assembly. Design document changes (DDCs) issued aga i..s t this assembly were for field changes only and thus could not affect the design of the assembly itself.
RCI COMMENTS:
Item 3 - CRD Housing Support Assembly
- a. This assembly was installed as designed and supplied. Attached are pictures of this type of assembly in the Hatch Nuclear Power Plant which is identical to Zimmer. A check of the G.E. Co. installation drawing revealed this is normal for this installation and the installation was in accordance with the drawing. A check with the component designer, G.E. Co., indicated this is the actual design of the component.
- b. RCI had no responsibility for surface treatment of the components.
The supplier of the equipment provided the surface treatment.
- c. Keeping in mind RCI has been off site since 1979, the fact a fillet weld is cracked at this time is not evidence it was cracked at time of installation or that inadequate techniques were employed to perform the welding.
CG&E C0KMENTS:
3a. RCI is correct. G.E. parts 7 and 8 shown on drawing 761E740 Rev. 4 are designed to have 10 degree cuts on both ends. Drawing 761E740 Rev. 6 changed parts to the later configuration; the parts used are correct as installed (Ref erence FDDR No. KN-1-1055 Revision 0) .
3b. The statement by RCI is correct. The steel for this assembly was supplied with a prime coat of carba-zinc per the design drawing. The top coat of Phenoline was applied subsequent to RCI installation in accordance with S&L Specification 9-4.
3c. Since the beams have not yet been exposed to the design dynamic loading, it is unlikely that a crack could have been initiated and propogeted in the period since RCI left the site. It is more likely that non-destructive examination performed by RCI failed to discover the fillet weld crack.
K5011901
a -
NRC DRAFT IE NOTICE:
- 4. Reactor Lower Head Insulation Frame
' Three circumferential joints were examined to determine conformance of bolting with the reference specification. It was found that:
- a. Bolting for this frame was assembled without washers,
- b. At one location nuts did not show suf ficient thread engagement. l RCI COMMENTS:
Item 4 - Reactor Lower Head Insulation Frame This work was not in the scope of the RCI contract as evidenced by S&L Specification H-2832, page 1-9, paragraph 17.
CG&E COMMENTS:
RCI's statement is correct.
J t
f l
l l
l l
l t
l l
! K5011901
NRC DRAFT IE NOTICE:
- 5. Scram Discharge Volume Level Switch Supports Numerous deficiencies resulting from inspection of two RCI supports (lRD177SR and BP-4) were identified. These support deficiencies included: self-drilling anchor bolts used instead of the wedge type, threaded rod substituted for bolting, a slugged weld, threaded rod tack welded to the back of the base plate as an anchor bolt substitute, connection details not in accordance with the drawing, oversized bolt holes in base plates, use of " hardware store" quality nuts and washers, and U-bolt supports formed f rom threaded rod. In addition, weld rod was found stuf fed into a tubular support member for 1RD177SR.
RCI COMMENTS:
Item 5 - Scram Discharge Volume Level Switch Supports The use of self drilling anchor bolts was common practice at the time of installation. The system design specification was supplied by Sargent & Lundy Engineers and it was not until issuance of IE Bulletin 79-02 that emphasis was given to anchor bolts. The action taken by S&L at that time was given to anchor bolts. The action taken by S&L at that time was the issuance of CFIP (Concrete Fastener Installation Procedure) and it was !.ssued to other contractors on the Zimmer jobsite but was not included in the design specification for the RCI scope of work. The use of threaded rod being substituted for bolting is not a normal RCI practice and was apparently performed without Site personnel knowledge.
The use of " hardware store" quality nuts & bolts is a condition we cannot comment on as we do not have knowledge of what that is or where the bolts were used. The use of threaded rod for a U-bolt was an approved design condition indicated on the installation drawing.
To comment on weld rod being stuffed into a tubular support member would be preseumptious to assume it was RCI filler material. All filler material issued by RCI was documented out and in and a record of all transactions is on file.
The other items identified here may or may not have been performed by RCI during installation. Again, keep in mind that RCI work has been modified by others since RCI left the site.
CG&E COMMENTS:
The use of self-drilling anchors was acceptable at the time of installation. All self-drilling type anchors on the CRD System will be reviewed for adequacy. The other deficiencies (i.e., threaded rod substituted for bolting, slugged weld, threaded rod tack welded to the back of the base plate as an anchor bolt substitute, connection details not in accordance with the drawing, oversized bolt holes in base plates, and use of hardware store quality nuts and washers) are AISC & AWS code violations and remain the responsibility of RCI.
As noted in the general overview, the only work performed on any CRD supports subsequent to RCI leaving the site was the removal of various type S-7, S-8, and S-9 hangrrs. No other modifications have been made to supports furnished or installed by RCI.
K5011901