PY-CEI-NRR-2377, Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1
ML20196E532
ML20196G125
ML20209B582
ML20209C398
ML20209D134
ML20207H640
05000346/LER-1998-001-01, Forwards LER 98-001-01,which Provides Addl Info Re 980407 Occurrence.Changes Are Marked with Rev Bar in Margin.List of Util Commitments,Encl
ML20209G368
ML20210C438
ML17191B403
ML20210G515
ML20210G715
ML20211P307
ML20210G321
ML20210G439
ML20210G383
ML20210H049
ML20210G552
ML20210H610
ML20210P805
ML20210S607
ML20210T106
ML20211B016
ML20211J920
PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl
ML20211G391
ML20211D117
ML20211H020
ML20211K661
ML20211K095
ML20211K668
ML20211P300
ML20216E596
ML20212D350
ML20216J670
ML20217A564
ML20212L069
ML20217F837
ML20217G920
PY-CEI-NRR-2438, Informs That DBNPS & PNPP Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl
MODIFICATIONS TO MEET APPErlDIX R SECTION III.G.3 On March 23, 1982 we met with your representatives at the offices of Bechtel Co. in Gaithersburg, Maryland to review proposed plant modift-cations to meet the requirements of 10 CFR 50 Appendix R.Section III.G.3.
As a result of that meeting we have identified the following drawings which should be submitted for consideration in our review of the proposed modification.
Bechtel Co. Drawings:
M-269 LS Rev. 0 E 52B Sheet 1 Rev. 5 E 52B Sheet 438 Rev. 5 E 52B Sheet 43C Rev. 5 E 52B Sheet 43D Rev. 4 M 041 Rev. 34 Drawing Change Notices:
DCN H-041-ll 3 sheets DCN E-361-9 4 sheets Layout of Control Room:
F P 9502.00.0 l
Please submit these drawings as soon as possible but no later than 30 l
days of receipt of this letter.
l l
The reporting and/or recordkeeping requirements contained in this letter l
affect fewer than ten respondents; therefore, OMB clearance is not required under P.. L.96-511.
Sincerely.
nycm;L uGw ET J01d F.S M John F. Stolz, Chief f-g#4:DL 7perating Reactors Branch f4 ORB #4:DL C
)ivision o-f. Licensing-..
OFFICE )
..ADe A 3ggg
$URNAMEh
.4 8204220165 820408
?
DR ADOCK 05000 OFFICIAL RECORD COPY usme au-meeo
l d
3.4 '
g f
Toledo Edison Company ccw/ enclosure (s):
Mr. Donald'H. Hauser, Esq.
U.S. Nuclear Regulatory Commission The Cleveland Electric Residen't Inspector's Office Illuminating Company 5503 N. State Route 2 P. O. Box 5000 Oak Harbor, Ohio 43449 Cleveland, Ohio 44101 Mrs. Julia Baldwin, Librarian Gerald Charnoff, Esq.
Government Documents Collection Shaw, Pittman, Potts William Carlson Library and Trowbridge University of Toledo
Fuller & Henry 300 Madison Avenue P. O. Box 2083 Regional Radiation Representative Toledo, Ohio 43603 EPA Region V 230 South Dearborn Street Mr. Robert B. Borsum Chicago, Illinois 60604 Babcock & Wilcox Nuclear Power Generation Division 7910 Woodmont Avenue, Suite 220 Bethesda, Maryland 20814 Ohio Department of Health ATTN:
Radiological Health Program Director P. O. Box 118 President, Board of County Columbus, Ohio 43216 Commissioners of Ottawa County Port Clinton, Ohio 43452 Attorney General Department of Attorney General 30 East Broad Street Columbus, Ohio 43215 Harold Kahn, Staff Scientist Power Siting Commission 361 East Broad Street Columbus, Ohio 43216 Mr. James G. Keppler, Regional Administrator U. S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 A