Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement
Results
Other: 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228, 05000361/LER-1984-001-01, :on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned, L-85-001, Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl, ML13309B382, ML13310A255, ML13310B109, ML13310B303, ML13311A389, ML13316A877, ML13317A139, ML13317A430, ML13317B481, ML13317B484, ML13317B485, ML13323A455, ML13324A724, ML13324A726, ML13324A804, ML13324A807, ML13324A839, ML13326A740, ML13326A742, ML13330B160, ML13330B373, ML13331A845, ML13331A954, ML13333B085, ML13333B918, ML19324A617, ML20133D318, ML20141N665, ML20153F883, ML20199B108, ML20205G800, ML20207A610, ML20210D527, ML20210S805, ML20211M577, ML20211P095, ML20214Q977, ML20245B716
|
MONTHYEARML19317G9761977-12-0808 December 1977 Responds to NRC 770804 Request.Forwards Review of Requirements,Commitments & Procedures in Conjunction W/ Proposed Tech Specs Re Fire Protection.Util Has Complied W/Fire Protection Responsibilities During NRC Audits Project stage: Request ML19309A1261978-02-28028 February 1978 Double Bibbed Supplied-Air Hood, Prepared for Doe.Fr Notice Re Respiratory Protective Devices,Tests for Permissability & Fees Encl Project stage: Request IR 05000312/19780081978-06-19019 June 1978 IE Investigation Rept 50-312/78-08 on 780609.No Noncompliance Noted.Major Area Investigated:Allegation That Bechtel Neglected to Correct Significant Design Error in 1972 Project stage: Request ML19269B7831978-11-14014 November 1978 Responds to NRC 780921 Rejection of Design Criteria for Installation of Ionization Detectors in Areas Containing Both Combustibles & Equipment/Cables Required for Safe Shutdown.Requests Approval of Schedule to Make Related Mods Project stage: Request ML20148T4491978-12-0101 December 1978 Application for Amend 61 to License DPR-54,reflecting Changes to Table 3.1 of Fire Protection Safety Evaluation Project stage: Request ML13317B4841979-04-26026 April 1979 Reactor Overpressurization System PT-425X1 & PT-425X2 Installation Detail Project stage: Other IR 05000361/19820181982-06-0303 June 1982 IE Insp Rept 50-361/82-18 on 820413-16.No Noncompliance Noted.Major Areas Inspected:Emergency Plan Exercise & Associated Critiques Project stage: Request ML13302A5631982-06-30030 June 1982 Forwards Revision 5 to Physical Security Plan.Revision Withheld (Ref 10CFR73.21) Project stage: Request ML13317A4301982-11-22022 November 1982 Discusses Implementation of Safe Shutdown Mods to Minimize Risk of Addl Retrofit & Installation Schedule Per Request Re Fire Protection Program Review.All Mods Will Be Completed Prior to Cycle 11 Startup Project stage: Other ML13317A4171982-11-22022 November 1982 Forwards Comments on Technical & Safety Evaluation Repts for SEP Topic VI-4 Re Containment Isolation Sys (Electrical),In Response to NRC .Comments Delineate Differences Between Facility Design & Licensing Bases Project stage: Request ML13317A4641982-12-15015 December 1982 Forwards Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info, Supplementing 820630 Response to Generic Ltr 81-12,dtd 810220 Project stage: Supplement ML13333A9411982-12-31031 December 1982 Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info Project stage: Request ML13326A7401983-03-23023 March 1983 Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features.Date Extended to 831031 Project stage: Other ML13326A7421983-03-23023 March 1983 Notice of Issuance & Availability of Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features Project stage: Other ML13317A1391983-04-25025 April 1983 Corrects NRC Re Fire Protection Mods for Items 3.1.14 & 3.1.7(b) of Fire Protection Ser.Ref Cited Should Be 10CFR50.48(d)(3),not 10CFR50.48(d)(2) Project stage: Other ML13317B4851983-07-27027 July 1983 Wiring Diagram Nuclear Misc Devices:Press,Temp,Level & Flow Sws, as-built Project stage: Other ML13333B9181983-08-0404 August 1983 Advises That Only Rancho Seco & San Onofre 1 in Region V Remain to Be Inspected Per 10CFR50,App R,Section Ii.G Re Fire Protection.Rancho Seco to Be Inspected Between Mar & Sept 1984.San Onofre 1 to Be Inspected in Late FY85 Project stage: Other ML13310B1091983-12-0505 December 1983 Addresses Fee Requirements of 10CFR170 Re Actions Concerning Fire Protection Requirements of 10CFR50.Current NRC Policy Is to Exempt from Fees All Fire Protection Exemptions Granted Per 10CFR50.12 Unless License Amend Required Project stage: Other ML13305A5141984-02-10010 February 1984 Forwards Updated FSAR for San Onofre Nuclear Generating Station,Units 2 & 3,Vols 1-22.Update Submitted as Complete New Fsar,Removing Amend Numbers from Text & Corresponding Margin & Change Bars & Repaginating Pages Project stage: Request 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 8402281984-02-13013 February 1984
- on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228
Project stage: Other 05000361/LER-1984-001-01, :on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned1984-02-28028 February 1984
- on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned
Project stage: Other ML13309B3821984-03-19019 March 1984 Forwards Updated Fire Hazards Analysis,Vols 1-4 Project stage: Other ML13310B3031984-03-26026 March 1984 Responds to NRC Fire Protection Review of Installed Mods & Two Areas of Nonconformance.Corrective Actions:Addl Fire Stop Installation Expected to Be Complete Prior to Startup from Present Outage & Pressure Verification Retested Project stage: Other ML13310A2551984-04-30030 April 1984 Conceptual Design for Dedicated Safe Shutdown Sys Project stage: Other ML13330A1701984-12-13013 December 1984 Forwards Request for Addl Info Re Dedicated Shutdown Sys for Fire Protection.Info Requested within 45 Days of Ltr Receipt Project stage: RAI L-85-001, Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl1985-04-0303 April 1985 Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl Project stage: Other ML13311A3891985-05-21021 May 1985 Forwards Addl Info Re Util 840424 Submittal Concerning Dedicated Shutdown Sys (Dss),Per 841213 Request.Util Proceeding W/Efforts to Comply W/Schedules for Completion of Mods,Including DSS Mods,Established by 830323 Exemption Project stage: Other ML13333B2661985-05-22022 May 1985 Notification of 850625 Meeting W/Util in Bethesda,Md to Discuss Util Approach to Complying W/Section Iii.G of App R Project stage: Meeting ML13333B2761985-06-18018 June 1985 Notification of Rescheduled 850626 Meeting W/Util in Bethesda,Md to Discuss Approach to Meeting App R, Section Iii.G Project stage: Meeting ML13333B2801985-07-16016 July 1985 Summary of 850606 Meeting W/Util,Impell & Fluor Re Util Approach to Meeting Requirements of Section Iii.G of App R to 10CFR50 Concerning Fire Protection.Mods Will Be Completed During Outage Beginning on 851130.Viewgraphs Encl Project stage: Meeting ML13324A7261985-09-30030 September 1985 Requests Extension Until 851004 to Submit Info on App R, Section Iii.G Compliance Plans & Response to Generic Ltr 81-12,per 850919 Commitment Re Fire Protection Program Review Project stage: Other ML13333B0851985-09-30030 September 1985 Rev 0 to Southern California Edison San Onofre Nuclear Generating Station Unit 1 Generic Ltr 81-12 Response Project stage: Other ML13323A4551985-09-30030 September 1985 Rev 0 to Southern California Edison San Onofre Nuclear Generating Station,Unit 1 10CFR50,App R Exemption Requests Project stage: Other ML20133D3181985-09-30030 September 1985 Rev 0 to San Onofre Nuclear Generating Station Unit 1 10CFR50,App R,Section Iii.G Compliance Evaluation Project stage: Other ML13324A7241985-10-0404 October 1985 Forwards Southern California Edison...Generic Ltr 81-12 Response, Design Description for Dedicated Safe Shutdown Sys, Southern California...10CFR50 App R Exemption Requests & San Onofre...Evaluation.. Project stage: Other ML13333B3161985-11-0808 November 1985 Notification of 851114 Meeting W/Util in Bethesda,Md to Discuss Util App R Submittal Re Fire Protection Project stage: Meeting ML13316A8801985-12-0202 December 1985 Evaluation of Exemption Requests from 10CFR50.48 & App R to 10CFR50, Request for Info Project stage: Request ML20207A6101985-12-0303 December 1985 Forwards List of Current Fire Protection Enforcement Actions,Per 851106 Request.Suggested Schedule for Affected Licensees to Comply W/App R Requirements Will Be Provided Project stage: Other ML13316A8771985-12-10010 December 1985 Forwards Franklin Research Request for Info Re 851004 Exemption Requests from 10CFR50.48 & App R to 10CFR50 Project stage: Other ML13317B4811985-12-31031 December 1985 Forwards Addl Info Re Compliance w/10CFR50,App R Safe Shutdown Requirements,Per NRC 851004,1115 & 1210 Requests. Response to Question 8 Delayed Until 860124 Due to Planned NRC 860114 & 15 Visits.W/Two Oversize Drawings Project stage: Other ML13331A8451985-12-31031 December 1985 Requests Fee for 851004 Application Requesting Fire Protection Exemptions Project stage: Other ML20137A6801986-01-0707 January 1986 Notification of 860113 Meeting W/Util in San Clemente,Ca to Review App R Fire Protection Submittal,Including Exemptions Requested for Certain Areas of Facility Project stage: Meeting ML13333B3311986-01-17017 January 1986 Summary of 851114 Meeting W/Licensee to Discuss App R Compliance Review,Including Design of Dedicated Shutdown Sys,Review of Exemptions from NRC Requirements Submitted or Pending & Possible Deviations from NRC Guidance Project stage: Meeting ML13324A8041986-02-14014 February 1986 Forwards Rev 2 to Updated Fire Hazards Analysis.Rev Includes Addl Info Which Amplifies,Clarifies or Updates Existing Text & Reflects All Changes to Facilities Up to 6 Months Prior to Filing Project stage: Other ML13324A8071986-02-18018 February 1986 Forwards List of Fire Areas Where Operator Action Necessary to Achieve Safe Shutdown W/Timing Requirements & List of All Exemption Requests Submitted,Per NRC 860113 Request During Site Visit Project stage: Other ML13331A8481986-02-25025 February 1986 Forwards Fee for 851004 Application for Review of Fire Protection Program,Per 851231 Request Project stage: Request ML20141N6651986-03-11011 March 1986 Responds to 860220 Request for Info Re Secy 85-306,including Licensees Using New Interpretations of App R to 10CFR50 & Effect of New Interpretations on Compliance Schedules in EDO 851226 Memo.List of Plants Requesting Evaluations Provided Project stage: Other ML13324A8391986-04-23023 April 1986 Forwards Rev 1 to 01-0310-1435, San Onofre Generating Station Unit 1,10CFR50,App R,Section Iii.G Compliance Evaluation. Rev Incorporates Evaluation of Circuits for Which Field Walkdown Required Project stage: Other ML13324A8551986-05-15015 May 1986 Forwards Safety Evaluation Accepting Listed Util Submittals Re Sections III.G.3 & Iii.L of App R to 10CFR50 Re Alternative Shutdown Capability Design Project stage: Approval ML13324A8581986-05-15015 May 1986 Safety Evaluation Accepting Util Proposed Alternative Shutdown Capability Design in Event of Fire to Comply w/10CFR50 App R Requirements Project stage: Approval 1984-03-26
[Table View] |
Text
REGULAT@ *FORMATION DISTRIBUTIO Y
M (RIDS)
ACCESON NBR:8403220018 DQCDATE: 84/03/19 NOTARIZED: YES DOCKET #
50"361 San Onofre Nuclear Station, Unit 2, Southern Californ 05000361 50-362 San Onofre ivclear Station, Unit 3, Southern Californ 05000362 AUTHNAME AUTHOR AFFILIATION BASKINK,P.
Southern California Edison Co.
RECIPNAME RECIPIENT AFFILIATION DENTONH.R, Office of Nuclear Reactor Regulation, Director
SUBJECT:
Forwards."Updated Fire Hazards AnalysisVols 14.
DISTRIBUTION CODE: B0028 COPIES RECEIVED:LTR, ENCLI. SIiE
+
TITLE: Licensing Submittal;.Fire Protection NOTES:J Hanchett Icy PUR Documents, NRR/DL/SEP Icy*
05000206 J Hanchett Icy PLR Documents, ELD Chandler icy..
0I00361 J Hanchett icy PUR Documents.
ELD Chandler icy.
05000362 RECIPIENT-COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR ORB5 BC 1*
NRR L83 BC 1
1*
PAULSON#,V
- 01.
- 1.
ROO0H,.
01 1
INTERNAL: ELD/HDS2 1
0 IE FILE 07 1
1*
NRZ...
P
.2 NRR/DSI/ASB 1
f-EUFIL 4 1R GN 5.
1I EXTERNAL: ACRS 10 6
LPDR 03 2
2*
NRC PDR 02 1
i*
NSIC 05 1
1*
NTIS 1
1 NOTES:
31 3
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL 24
F Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE KENNETH P. BASKIN ROSEMEAD, CALIFORNIA 91770 TELEPHONE VICE PRESIDENT March 19, 1984 818-572-1401 Mr. H. R. Denton Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
FHA Update Consistent with 10 CFR 50.71(e)
Docket Nos.
50-361 and 50-362 San Onofre Nuclear Generating Station Units 2 and 3 Reference is made to the letter dated February 10, 1984 from Southern California Edison Company (SCE) to the Nuclear Regulatory Commission (NRC).
That letter transmitted thirteen (13) copies of the Updated Final Safety Analysis Report (Updated FSAR) for San Onofre Nuclear Generating Station, Units 2 and 3 (SONGS 2 and 3) in accordance with the requirements of 10 CFR 50.71(e).
As stated in the reference letter, the Updated Fire Hazards Analysis (Updated FHA) was to be transmitted to the NRC by separate letter.
SCE's letter to the NRC dated February 15, 1984 indicated that the Updated FHA would be submitted by March 16, 1984. Accordingly, enclosed are one signed original and 12 additional copies of the Updated FHA for SONGS 2 and 3.
The Updated FHA has been reformatted to provide more detail and clarity to the document than was included in the current FHA. Examples of new information provided in the Updated FHA are the addition of fire hazards analysis matrices for each fire area and zone and the addition of fire area features drawings, emergency lighting drawings and Technical Specification barrier drawings.
The results of this Updated FHA may be summarized as follows:
o The Updated FHA provides a total revalidation of the SONGS 2 and 3 fire protection program.
o The Updated FHA includes a Design Basis Table (Appendix D) that provides a direct and detailed comparison of the SONGS 2 and 3 fire protection program to the specific requirements of NRC Branch Technical Position (BTP) 9.5-1 (1977), Appendix A and 10 CFR 50, Appendix R, Sections III.G, 3 and 0.
o The BTP 9.5-1, Appendix A Design Basis Table clearly documents SONGS 2 and 3 compliance to the requirements and provides justification for any exceptions or alternative compliance noted.
840322D001 840319l It PDR' ADOCK 050002,06.
F
_PDR
0*
Mr. H.
March 19, 1984 o
Previous commitments have not been changed in the Updated FHA with the exception of a few instances that are noted with justification provided in the Design Basis Table (BTP 9.5-1, Appendix A).
Most of these instances involve deviations from NFPA codes. In such instances, equivalent fire protection has been provided in accordance with good engineering Judgment.
o The 10 CFR 50.Appendix R Design Basis Table identifies specific deviations from the literal requirements of Sections III.G, J and 0 of Appendix R. Deviations identified, that have already been accepted by the NRC in previous licensing documents, are included in the tabulation along with deviations that have not been specifically identified previously and require NRC concurrence. A deviation request justifying the latter deviations is provided as Enclosure 1 to this letter and NRC approval of these deviations is hereby requested. In addition, those deviations that have been accepted previously by the NRC are tabulated in Enclosure 2 to this letter.
o Notwithstanding the above request, SCE believes that the NRC was informed and knowledgable during the licensing process for those areas of the SONGS 2 and 3 fire protection program that are not in literal compliance with current NRC requirements and that SCE's commitments were acceptable to the NRC as providing equivalent fire protection for those areas.
o The Updated FHA does not alter any conclusions drawn in the current FHA regarding the plant's capability for safe shutdown and cooldown in the event of a fire.
As a result of the intensive program conducted by SCE in the preparation of the Updated FHA, a number of changes to the SONGS 2 and 3 Operating License conditions and Technical Specifications have been identified. Accordingly, concurrent with this transmittal of the Updated FHA, proposed changes to the operating licenses and technical specifications are being submitted by SCE under separate cover for NRC review and approval.
Until NRC approval of the proposed changes is obtained, SCE recognizes that the current FHA as referenced in the operating licenses establishes the fire protection provisions for SONGS 2 and 3.
SCE is cognizant of the latest guidance provided by the NRC regarding implementation of requirements of 10 CFR 50, Appendix R. The submittal of the Updated FHA and proposed license and technical specification changes represents a significant effort by SCE to ensure that the fire protection program for SONGS 2 and 3 satisfies the NRC requirements. SCE recognizes that a timely review of the proposed license and technical
Mr. H.
March 19, 1984
.sE specification changes in conjunction with the Updated FHA will require substantial NRC effort and SCE is prepared to provide assistance to the NRC as requested to facilitate review and approval.
If you have any questions regarding this matter, please call me.
Very truly yours, Enclosures cc: Mr. H. Rood, Project Manager (w/o encl)
Licensing Branch 3
- 3. B. Martin (w/encl)
Region V Administrator A. E. Chaffee (w/encl)
NRC Site Inspector
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA
)
EDISON COMPANY, ET AL. for a Class 103 )
Docket No. 50-361 Unit 2 License to Acquire, Possess, and Use
)
UPDATED FHA Two Utilization Facilities and Related )
Licenses in Connection with Units No.
)
Docket No. 50-362 Unit 3 2 and 3 of the San Onofre Nuclear
)
UPDATED FHA Generating Station
)
SOUTHERN CALIFORNIA EDISON COMPANY, ET AL. hereby submit the Updated Fire Hazards Analysis (FHA) for San Onofre Nuclear Generating Station, Units 2 and 3 that has been updated consistent with the requirements of 10 CFR 50.71(e).
This update provides a revision to the original FHA (up to and including Amendment Number 13) and includes additional information which amplifies, clarifies, or updates the original text. This update also removes amendment numbers from the text and corresponding margin change bars and repaginates pages. The information contained in the responses to NRC questions is incorporated into the body of the Updated FHA. This submittal fulfills the requirements of 10 CFR 50.71(e) for both San Onofre Unit 2 and Unit 3 and reflects all changes up to a maximum of 6 months prior to the date of this filing.
The information included in this update supersedes and replaces the previously issued FHA information.
DLC:0639F
00@0 Subscribed on this day of ___a_____,
1984.
Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By:
Kenneth P. Baskin Vice President Subscribed and sworn to before me this day of 22ZAze6 /5'
/ V Not y Public in and for the County of Los Angeles, State of California My Commission Expires:
J
/7&
Charles R. Kocher OFFICIAL SEAL James A. Beoletto AGNES CRABTREE Attorneys for Southern NOTARY PUBUC - CALFORNIA California Edison Company PRINCIPAL UFFICE IN LOS ANGELES COUNTY My Commission Expires Aug. 27, 1986 By:
Jam A. Beoo
SAN DIEGO GAS & ELECTRIC COMPANY By: 664 David R. Pigott Samuel B. Casey Orrick, Herrington & Sutcliffe Attorneys for San Diego Gas & Electric Company By:
Subscr ed and sworn to before me this day of/8 OFFICIAL SEAL LORAINE E. GRAY NOTARY PUBLIC -CALIFORNIj l
PRINCIPAL OFFICE IN ary Public in and fdr the City SAN DIEGO COUNTY and County of San Diego, Ca ifornia My Commission Exp. April 6, 1986
THE CIFY OF ANAHEIM By: 9 GORDON W. HOYT by DALE POHLMAN Alan R. Watts Rourke & Woodruff Attorneys for the City of Anaheim By:
Subscribed and sworn to before me this
( T/v day of f
Notary Pliblic in and fdr the County of Orange, State of California OFFICIAL SEAL E LUCILtE MOSES NOTARY PUBLIC - CALIFORNIA M
COUNT My comm. exies JNI 16, 1987
THE CITY OF RIVERSIDE By:
FRED KRAY Alan R. Watts Rourke & Woodruff Attorneys for the City of Riverside By:
Subscribed and sworn to before me this 7th day of
- February, 1984.
Notary Public in and for the County of Riverside State of California OFFICIAL SEAL MARGARET 1. ALLEN NOTARY PUBLIC RIVERSIDE CO., CALIF.
My commission expires 4-29.87
Introduction to Enclosures 1 and 2 During the update of the San Onofre Nuclear Generating Station, Units 2 and 3 Fire Hazards Analysis, a systematic review of the fire protection program was conducted. In an attempt to insure compliance with license conditions and NRC fire protection requirements, SCE took advantage of participation in the Nuclear Industry Fire Protection Seminar held February 13 and 14, 1984 in Washington, D.C. In addition, recent NRC guidance provided by Generic Letter 83-33 and IE Information Notice No. 84-09 was carefully reviewed.
As a consequence of this process, deviations to 10 CFR 50, Appendix R were found, which had not previously been identified and accepted by the NRC. These deviation rdquests are detailed in Enclosure 1. In each case, a statement of the issue and a technical basis to support the deviation request-is provided.
In addition, Enclosure 2 identifies those deviations to NRC fire protection requirements that have been approved by the NRC and documented in the Safety Evaluation Related to the Issuance of Operating License NPF-15, San Onofre Nuclear Generating Station, Unit 3, Docket No. 50-362, dated November 15, 1982.
Deviations to 10 CFR 50, Appendix R that have not been previously approved by the NRC.