Forwards Safety Evaluation of Util Requested Mods to Comply w/10CFR50 App R Sections Iii.G,Iii.J & Iii.O Re Alternate Svc Water Capability.Proposed Mods Acceptable
ML20053E522
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/02/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20053E523 List:
References
TAC-43690, TAC-52156, NUDOCS 8206080485
Download: ML20053E522 (2)


Text

DCh-Q/b JW 0 21982 nIXToinHTION GfGkt FiTh DEisenhut Gray File ASLAB ADe Agazio Tuambach LSchneider

  • (RC PDR RIngram Ridgley, ASB DBrinkman L PDR OELD H0rnstein CMiles AE0D EBlackwood RDiggs Docket o.

0-346 IE OParr/WJohnson ACRS-10 TBarnhart-4 Mr. Richard P. Crouse Vice President, Nuclear Toledo Edison Company Edison Plaza - Stop 712 300 Madison Avenue Toledo, Ohio 43652

Dear Mr. Crouse:

SUBJECT:

MODIFICATIONS TO COMPLY WITH SECTION III.G AND III.L OF APPENDIX R TO 10 CFR 50 Paragraph 50.48(b) of 10 CFR 50, which became effective on February 17, 1981, required all nuclear plants licensed to operate prior to January 1, 1979 to meet the requirements of Sections III.G, III.J and III.0 of Appendix R to 10 CFR 50 regardless of any previous approvals by the Nuclear Regulatory Commission for alternative design features for those items. On March 19, 1931 Toledo Edison Company submitted design informa-tion f~ a modification to provide alternate service water capabilities to meet the requirements of Section III.G of Appendix R.

In that sulnittal, Toledo Edison Company indicated that with this modification the facility will comply with the requirements of Sections III.G. III.J and III.0 of Appendix R and that no other open items remain from the prior NRC review (cf. NRC letter November 24, 1980).

On March 23, 1982 Toledo Edison Company met with the NRC staff to discuss the design modification. At that meeting Toledo Edison Company indicated that two other areas of non-compliance with Appendix R requirements had been identified and that exemptions would be requested for these two areas.

The exemption requests were submitted by letter dated April 29,1982 (No.

815) and are under consideration.

The NRC staff has reviewed the proposed modification to provide alternate service water capability and has found it to be acceptable. Based on this approval the required schedule for implementation is as given in Paragraph 50.48(c)(4) to 10 CFR 50.

Our Safety Evaluation Report on this issue is the enclosure to this letter.

Sincerely.

"0EIGIML SIC 2.2D BY J0Di F. Srow C-0R3#4:DL B206080485 820602 z

PDR ADOCK 05000346 John F. Stolz, Chief PDR

-.k 82 F

Operating Reactors Branch #4

/

ORB #4 N "W

"ntig"g' * '*t/T!m a i""

q' )' 7 ASB :D ["C-ASB :DSI "3 Rid O P uY'f " M " I omen >

...g.cT650t'o?"" Safety" Evaluation"'

suR m e>

....jpgggg-p g y.- -Q, 7-- -

g7j.,g?---.

................g7 cmy 74RC FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY usa m mi-m ua L

N c>

1 Toledo Edison Company cc w/ enclosure (s):

Mr. Donald H. Hauser, Esc.

U.S. Nuclear Regulatory Commission

~

The Cleveland Electric Resident Inspector's Office Illuminating Company 5503 N. State Route 2 Cleveland, Ohio 44101 Oak Harbor, Ohio 43449 P. O. Box 5000

~

Mrs. Julia Baldwin, Librarian Gerald Charnoff Esq.

Government Documents Collection Shaw, Pittman, Potts William Carlson Library and Trowbridge University of Toledo 1800 M Street, N.W.

2801 W. Bancroft Avenue Washington, D. C.

20036 Toledo, Ohio 43606 Paul M. Smart, Esq.

Fuller & Henry 30011adison Avenue P. O. Box 2088 Regional Radiation Representative Toledo, Ohio 43603 EPA Region V 230 South Dearborn Street Mr. Robert B. Borsum Chicago, Illinois 60604 Babcock & Wilcox Nuclear Power Generation Division 7910 Woodmont Avenue, Suite 220 Bethesda, llaryland 20814 Ohio Department of Health ATTN: Radiological Health Program Director P. O. Box 118 President, Board of County Columbus, Ohio 43216 Commissioners of Ottawa County Port Clinton, Ohio 43452 Attorney General Department of Attorney General 30 East Broad Street Columbus, Ohio 43215 Harold Kahn, Staff Scientist Power Siting Commission 361 East Broad Street Columbus, Ohio 43216 Mr. James G. Keppler, Regional Administrator U. S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Ted Myers Manager, Nuclear Licensing Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, Ohio 43652

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _.