Notice of Issuance & Availability of Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features
ML13326A742
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/23/1983
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13326A741 List:
References
TAC-64883, NUDOCS 8304010254
Download: ML13326A742 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-206 SOUTHERN CALIFORNIA EDISON COMPANY AND SAN DIEGO GAS & ELECTRIC COMPANY NOTICE OF ISSUANCE OF AN EXEMPTION FIRE PROTECTION RULE The U. S. Nuclear Regulatory Commission (the Commission) has issued

-n Exemption relating to the Fire Protection Rule Schedular Requirements of 10 CFR 50.48(c) for San Onofre Nuclear Generating Station, Unit No. 1 (SONGS 1).

SONGS 1, which is operated by Southern California Edison Company (SCE)

(the licensee), is located in San Diego County, California.

The exemption request is related to the time allowed to complete modifications and additions to the fire protection features at SONGS 1.

For reasons as stated in the exemption request, SCE requested additional time to complete these modifications and additions.

The Commission has determined that, pursuant to 10 CFR 50.12, an exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest and has granted the following exemptions with respect to the schedular implementati.on.of modifications and additions to San Onofre Unit No. 1 to meet the requ.irements of Section III.G of Appendix R to 10 CFR Part 50:

1.

The effective date of the Fire Protection Rule used for computi.ng the implementation of the fire protection features specified in 10 CFR 50.48(c)(3) is replaced by October 31, 1983.

83040 08332j

,PDR

-AQ 5000206 P -

7590-01

-2

2. The date of NRC approval used for computing the implementation of the fire protection features specified in 10 CFR 50.48(c)(4) is replaced by October 31, 1983.

The Commission has determined that the granting of the exemption will not result in any significant environmental impact and that pursuant to 10 CFR §51.5(d)(4), an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this action.

For further details with respect to this action, see (1) the SCE's letters dated June 30, 1982 and August'3, 1982, and (2) the Commission's Exemption and letter of transmittal dated March 23, 1983.

All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D. C., and at the San Clemente Branch Library, 242 Avenida Del Mar, San Clemente, California.

A single copy of item (2) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:

Director of Licensing.

Dated 4t Bethesda, Maryland, this 23rd day of March, 1983.

FOR THE NUCLEAR REGULATORY COMMISSION Dennis M. Crutchfield, hief Operating Reactors Br nch #5 Division of Licensing