Notice of Issuance & Availability of Amend 18 to License NPF-3
ML19249A382
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/26/1979
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19249A373 List:
References
TAC-52156, NUDOCS 7908220367
Download: ML19249A382 (2)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSIOM DOCKET N0. 50-346 THE TOLEDO EDISON COMFANY AND THE CLEVELAND ELECTTTt C ILLUMINATING COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No.18 to Facility Operating License No. NPF-3, issued to The Toledo Edison hpany and The Cleveland Electric Illuminating Company (the licensees), which revised the license and Technical Specifications for operation of the Davis-Besse Nuclear Power Station, Unit No.1 (the facility), located in Ottaua County, Ohio. The amendment will become effective twenty days after issuance, unless a hearing has been requested.

The amendment adds a license condition relating to the completion of facility modifications for fire protection and modifies the Technical Specifications to require at least five individuals with fire protection training be on site at all times.

The licensees' filings comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations.

The Comission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license arcndnent.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

847 154 1908220%

7590-01 The Comission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the licensees' filings dated December 12, 1977, January 11, April ll, May 3, June 22, July 27, September 7 and 25, November 25, December 12,1978 and January 10, February 28, April 12 and July 9,1979,(2) Amendment No.18 to License No. NPF-3 and (3) the Comission's related Safety Evaluation. These items are available for public inspection at the Comission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the Ida Rupp Public Library, 310 Madison Street, Port Clinton, Ohio. A copy of items (2) and (3) may be obtained upon request addressed to the U. S.. Nuclear Regulatory Comission, Washington, D.C.

20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland, this 26th day of July 1979.

FOR THE NUCLEAR REGULATORY C0tHISSION h/h))I.

,,s Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors 847 155

.