ML13324A804

From kanterella
Jump to navigation Jump to search

Forwards Rev 2 to Updated Fire Hazards Analysis.Rev Includes Addl Info Which Amplifies,Clarifies or Updates Existing Text & Reflects All Changes to Facilities Up to 6 Months Prior to Filing
ML13324A804
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/14/1986
From: Baskin K
Southern California Edison Co
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML13324A805 List:
References
TAC-64883 NUDOCS 8602200164
Download: ML13324A804 (10)


Text

Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE KENNETH P. BASKIN ROSEMEAD, CALIFORNIA 91770 TELEPHONE VICE PRESIDENT 818-302-1401 February 14, 1986 Mr. H. R. Denton Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Subject:

Docket Nos. 50-206, 50-361 and 50-362 San Onofre Nuclear Generating Station Units 1, 2 and 3 In accordance with 10 CFR '50.71, Southern California Edison Company (SCE) is transmitting Revision 2 -to :he San Onofre Nuclear Generation Station Units 1, 2 and 3 Updated Fire HaN ds Analysis (UFHA).

This annual revision includes additional information wtch amplifies, clarifies or updates the existing text and reflects all changes made in the San Onofre Units 2 and 3 facility up to a maximum of six mc ths prior to the date of this filing.

The revision consists of a complete re ssue of the UFHA sections pertaining to San Onofre Units 2 and 3 to expedite i corporation of changes.

Each revised page includes both a vertical change bar drawn in the margin adjacent to the changed portion and the date of the revision. This revision does not alter any conclusions drawn in the UFHA regarding the safe shutdown capability in the event of a fire for San Onofre Units 1, 2 and 3. This submittal fulfills the requirements of 10 CFR 50.71 (e) for San Onofre Units 2 and 3.

As part of the NRC Systematic Evaluation Program (SEP), San Onofre Unit 1 is not required to meet the schedular constraints of 10 CFR 50.71.

However, San Onofre Unit 1 has committed to update the Unit 1 portions of the UFHA. The Unit 1 specific information is currently being revised to reflect the efforts underway to achieve compliance with the safe shutdown requirements of Part III.G of Appendix R to 10 CFR 50, as discussed in our "05000361/LER-1984-020, :on 840326,w/unit in Mode 2 at 2% Power,Reactor Trip Occurred on High Steam Generator Level.Caused by Overfeeding Steam Generators During Manual Operation of [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Control Sys|letter dated April 24, 1984]]. The transmittal of this information to the NRC is expected in mid-1986.

8602200164 860214 PDR ADOCK 05000206 F

PDR

Mr. H. R. Denton

-2 Enclosed are one signed original and 12 additional copies of Revision 2 to the San Onofre Units 1, 2 and 3 UFHA.

Should you have any questions or comments, please contact me.

Very truly yours, Enclosure cc:

(w/o enclosure)

H. Rood, NRC Project Manager San Onofre Units 2 and 3 R. F. Dudley, NRC Project Manager San Onofre Unit 1 J. B. Martin Regional Administrator, Region V F. R. Huey, USNRC Senior Resident Inspector Units 1, 2 and 3

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON

)

COMPANY and SAN DIEGO GAS & ELECTRIC

)

COMPANY for a Class 104(b) License

)

DOCKET NO. 50-206 Unit to Acquire, Possess, and Use a Utilization )

UPDATED FHA REVISION 2 Facility as Part of Unit No. 1 of the

)

San Onofre Nuclear Generating Station

)

SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS & ELECTRIC COMPANY hereby submit Revision 2 to the Updated Fire Hazards Analysis (UFHA) for San Onofre Nuclear Generating Station, Units 1, 2 and 3. This revision to the UFHA includes additional information which amplifies, clarifies or updates the original text and reflects all changes up to a maximum of 6 months prior to the date of this filing for San Onofre Units 2 and 3. This submittal fulfills the requirements of 10 CFR 50.71(e) for both San Onofre Unit 2 and Unit 3.

As part of the NRC Systematic Evaluation Program (SEP), San Onofre Unit 1 is not required to meet the schedular constraints of 10 CFR 50.71.

However, San Onofre Unit 1 has committed to update the Unit 1 portions of the UFHA to reflect changes made to the as-built facility. The Unit 1 specific information is currently being revised to reflect the efforts underway to achieve compliance with the safe shutdown requirements of Part III.G of Appendix R to 10 CFR 50.

The transmittal of this information to the NRC is expected in mid-1986.

The information included in this revision supersedes and replaces the previously issued UFHA information.

Subscribed on this -/_-3 day of Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By:

Kenneth P. Baskin Vice President Subscribed and sworn o before me this 3

da yof y

7 &A OFFICIAL SEAL AGNES CRABTREE NOTARY PUBLIC -

CALIFORNIA I

%Pl~iNCIPAL QFIF i

,7 LOS ANGELES COUNTY My Commission Expires Aug. 27, 1986 Notar Publc in and for the County of Los Angeles, State of California Charles R. Kocher James A. Beoletto Attorneys for Southern California Edison Company By:

V-K Charles R. Kocher

Subscribed on this /.3 day of A

(

Respectfully submitted, SAN DIEGO GAS & ELECTRIC COMPANY By Subscribed and sworn to before me this

/3 day of

/___

JILL QUIGLEY NOTARY PUBUC*CAUFORNIA PRINCIPAL OFFICE IN SAN DIEGO COUNTY My Commilsson Exp. March 7, 1989 ry Public/

an or e County of n4Diego, ?Pte of Calil rnia My Commission Expires:t AkaL.2 /M7 David R. Pigott Samuel B. Casey Orrick, Herrington & Sutcliffe Attorneys for San Diego Gas & Electric Company By David R. Pigott

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON

)

COMPANY, ET AL. for a Class 103 License to )

DOCKET NO. 50-361 Unit 2 Acquire, Possess, and Use Two Utilization

)

UPDATED FHA REVISION 2 Facilities and Related Licenses in

)

Connection with Units No. 2 and 3 of the

)

DOCKET NO. 50-362 Unit 3 San Onofre Nuclear Generating Station

)

UPDATED FHA REVISION 2 SOUTHERN CALIFORNIA EDISON COMPANY, ET AL. hereby submit Revision 2 to the Updated Fire Hazards Analysis (UFHA) for San Onofre Nuclear Generating Station, Units 1, 2 and 3. This revision to the UFHA includes additional information which amplifies, clarifies or updates the original text and reflects all changes up to a maximum of 6 months prior to the date of this filing for San Onofre Units 2 and 3. This submittal fulfills the requirements of 10 CFR 50.71(e) for both San Onofre Unit 2 and Unit 3.

As part of the NRC Systematic Evaluation Program (SEP), San Onofre Unit 1 is not required to meet the schedular constraints of 10 CFR 50.71.

However, San Onofre Unit 1 has committed to update the Unit 1 portions of the UFHA to reflect changes made to the as-built facility. The Unit 1 specific information is currently being revised to reflect the efforts underway to achieve compliance with the safe shutdown requirements of Part III.G of Appendix R to 10 CFR 50. The transmittal of this information to the NRC is expected in mid-1986.

The information included in this revision supersedes and replaces the previously issued UFHA information.

Subscribed on this day of Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By:

Kenneth P. Baskin Vice President Subscribed and sworn to before me this

/

day of YA

,/ff{

OFFICIAL SEAL AGNES CRABTREE NOTARY PUBLIC -

CBu ORNIA PRINCIPAL OUFiCL iN LOS ANGELES COUNTY My commission Expires Aug. 27, 1986 Nota Public in and for the County of Los Angeles, State of California Charles R. Kocher James A. Beoletto Attorneys for Southern California Edison Company By:

Charles R. Kocher

SAN DEGO GAS & ELECTRIC COMPANY By:

David R. Pigott Samuel B. Casey Orrick, Herrington & Sutcliffe Attorneys for San Diego Gas & Electric Company By:

Subscri ed and sworn to before me this

/3 day of Notary. Pt61c in and ffe'r the City and County of San Diego, California OFFICIR SEL JILL QUIGLEY NOTARY PUBUC-CAUFORNIA PRINCIPAL OFFICE IN SAN DIEGO COUNTY My Commission ExLp.

March 7,1989

THE CITY -F ANAHEIM By:

GORDON W. HOYT Alan R. Watts Rourke & Woodruff Attorneys for the City of Anaheim By:

Subscribed and sworn to before me this da y of L><*4,/

Notary Public i{'/a'nd for the County of Orange, State of California OFFIC 1

L NL CAMY KyAPOW NOTARY PUB C (:CALIFORNIA PRINCIPAL OFFICE IN ORANGE COUNTY MyCommission Expires May19, 1989

THE CITY OF RIVERSIDE By:

EVERETT ROSS Alan R. Watts Rourke & Woodruff Attorneys for the City of Riverside By:

7 Subscribed and sworn to before me this day of c

/9 Notary Public nand for' the County of R+ves4de, State of California OFFICIAL SEAL CAT[Y KARPOW D

NOTARY PUBLIC lALIFORNIA PRINCIPAL OFFICE IN ORANGE COUNTY My Commission Expires May 19,1989