Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement
Results
Other: 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228, 05000361/LER-1984-001-01, :on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned, L-85-001, Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl, ML13309B382, ML13310A255, ML13310B109, ML13310B303, ML13311A389, ML13316A877, ML13317A139, ML13317A430, ML13317B481, ML13317B484, ML13317B485, ML13323A455, ML13324A724, ML13324A726, ML13324A804, ML13324A807, ML13324A839, ML13326A740, ML13326A742, ML13330B160, ML13330B373, ML13331A845, ML13331A954, ML13333B085, ML13333B918, ML19324A617, ML20133D318, ML20141N665, ML20153F883, ML20199B108, ML20205G800, ML20207A610, ML20210D527, ML20210S805, ML20211M577, ML20211P095, ML20214Q977, ML20245B716
|
MONTHYEARML19317G9761977-12-0808 December 1977 Responds to NRC 770804 Request.Forwards Review of Requirements,Commitments & Procedures in Conjunction W/ Proposed Tech Specs Re Fire Protection.Util Has Complied W/Fire Protection Responsibilities During NRC Audits Project stage: Request ML19309A1261978-02-28028 February 1978 Double Bibbed Supplied-Air Hood, Prepared for Doe.Fr Notice Re Respiratory Protective Devices,Tests for Permissability & Fees Encl Project stage: Request IR 05000312/19780081978-06-19019 June 1978 IE Investigation Rept 50-312/78-08 on 780609.No Noncompliance Noted.Major Area Investigated:Allegation That Bechtel Neglected to Correct Significant Design Error in 1972 Project stage: Request ML19269B7831978-11-14014 November 1978 Responds to NRC 780921 Rejection of Design Criteria for Installation of Ionization Detectors in Areas Containing Both Combustibles & Equipment/Cables Required for Safe Shutdown.Requests Approval of Schedule to Make Related Mods Project stage: Request ML20148T4491978-12-0101 December 1978 Application for Amend 61 to License DPR-54,reflecting Changes to Table 3.1 of Fire Protection Safety Evaluation Project stage: Request ML13317B4841979-04-26026 April 1979 Reactor Overpressurization System PT-425X1 & PT-425X2 Installation Detail Project stage: Other IR 05000361/19820181982-06-0303 June 1982 IE Insp Rept 50-361/82-18 on 820413-16.No Noncompliance Noted.Major Areas Inspected:Emergency Plan Exercise & Associated Critiques Project stage: Request ML13302A5631982-06-30030 June 1982 Forwards Revision 5 to Physical Security Plan.Revision Withheld (Ref 10CFR73.21) Project stage: Request ML13317A4301982-11-22022 November 1982 Discusses Implementation of Safe Shutdown Mods to Minimize Risk of Addl Retrofit & Installation Schedule Per Request Re Fire Protection Program Review.All Mods Will Be Completed Prior to Cycle 11 Startup Project stage: Other ML13317A4171982-11-22022 November 1982 Forwards Comments on Technical & Safety Evaluation Repts for SEP Topic VI-4 Re Containment Isolation Sys (Electrical),In Response to NRC .Comments Delineate Differences Between Facility Design & Licensing Bases Project stage: Request ML13317A4641982-12-15015 December 1982 Forwards Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info, Supplementing 820630 Response to Generic Ltr 81-12,dtd 810220 Project stage: Supplement ML13333A9411982-12-31031 December 1982 Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info Project stage: Request ML13326A7401983-03-23023 March 1983 Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features.Date Extended to 831031 Project stage: Other ML13326A7421983-03-23023 March 1983 Notice of Issuance & Availability of Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features Project stage: Other ML13317A1391983-04-25025 April 1983 Corrects NRC Re Fire Protection Mods for Items 3.1.14 & 3.1.7(b) of Fire Protection Ser.Ref Cited Should Be 10CFR50.48(d)(3),not 10CFR50.48(d)(2) Project stage: Other ML13317B4851983-07-27027 July 1983 Wiring Diagram Nuclear Misc Devices:Press,Temp,Level & Flow Sws, as-built Project stage: Other ML13333B9181983-08-0404 August 1983 Advises That Only Rancho Seco & San Onofre 1 in Region V Remain to Be Inspected Per 10CFR50,App R,Section Ii.G Re Fire Protection.Rancho Seco to Be Inspected Between Mar & Sept 1984.San Onofre 1 to Be Inspected in Late FY85 Project stage: Other ML13310B1091983-12-0505 December 1983 Addresses Fee Requirements of 10CFR170 Re Actions Concerning Fire Protection Requirements of 10CFR50.Current NRC Policy Is to Exempt from Fees All Fire Protection Exemptions Granted Per 10CFR50.12 Unless License Amend Required Project stage: Other ML13305A5141984-02-10010 February 1984 Forwards Updated FSAR for San Onofre Nuclear Generating Station,Units 2 & 3,Vols 1-22.Update Submitted as Complete New Fsar,Removing Amend Numbers from Text & Corresponding Margin & Change Bars & Repaginating Pages Project stage: Request 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 8402281984-02-13013 February 1984
- on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228
Project stage: Other 05000361/LER-1984-001-01, :on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned1984-02-28028 February 1984
- on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned
Project stage: Other ML13309B3821984-03-19019 March 1984 Forwards Updated Fire Hazards Analysis,Vols 1-4 Project stage: Other ML13310B3031984-03-26026 March 1984 Responds to NRC Fire Protection Review of Installed Mods & Two Areas of Nonconformance.Corrective Actions:Addl Fire Stop Installation Expected to Be Complete Prior to Startup from Present Outage & Pressure Verification Retested Project stage: Other ML13310A2551984-04-30030 April 1984 Conceptual Design for Dedicated Safe Shutdown Sys Project stage: Other ML13330A1701984-12-13013 December 1984 Forwards Request for Addl Info Re Dedicated Shutdown Sys for Fire Protection.Info Requested within 45 Days of Ltr Receipt Project stage: RAI L-85-001, Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl1985-04-0303 April 1985 Comments on Generic Ltr 85-01, Fire Protection Policy Steering Committee Rept. Revised Interpretations of App R Requirements,Proposed Enforcement Action Guidance & Proposed Fire Protection License Condition Encl Project stage: Other ML13311A3891985-05-21021 May 1985 Forwards Addl Info Re Util 840424 Submittal Concerning Dedicated Shutdown Sys (Dss),Per 841213 Request.Util Proceeding W/Efforts to Comply W/Schedules for Completion of Mods,Including DSS Mods,Established by 830323 Exemption Project stage: Other ML13333B2661985-05-22022 May 1985 Notification of 850625 Meeting W/Util in Bethesda,Md to Discuss Util Approach to Complying W/Section Iii.G of App R Project stage: Meeting ML13333B2761985-06-18018 June 1985 Notification of Rescheduled 850626 Meeting W/Util in Bethesda,Md to Discuss Approach to Meeting App R, Section Iii.G Project stage: Meeting ML13333B2801985-07-16016 July 1985 Summary of 850606 Meeting W/Util,Impell & Fluor Re Util Approach to Meeting Requirements of Section Iii.G of App R to 10CFR50 Concerning Fire Protection.Mods Will Be Completed During Outage Beginning on 851130.Viewgraphs Encl Project stage: Meeting ML13324A7261985-09-30030 September 1985 Requests Extension Until 851004 to Submit Info on App R, Section Iii.G Compliance Plans & Response to Generic Ltr 81-12,per 850919 Commitment Re Fire Protection Program Review Project stage: Other ML13333B0851985-09-30030 September 1985 Rev 0 to Southern California Edison San Onofre Nuclear Generating Station Unit 1 Generic Ltr 81-12 Response Project stage: Other ML13323A4551985-09-30030 September 1985 Rev 0 to Southern California Edison San Onofre Nuclear Generating Station,Unit 1 10CFR50,App R Exemption Requests Project stage: Other ML20133D3181985-09-30030 September 1985 Rev 0 to San Onofre Nuclear Generating Station Unit 1 10CFR50,App R,Section Iii.G Compliance Evaluation Project stage: Other ML13324A7241985-10-0404 October 1985 Forwards Southern California Edison...Generic Ltr 81-12 Response, Design Description for Dedicated Safe Shutdown Sys, Southern California...10CFR50 App R Exemption Requests & San Onofre...Evaluation.. Project stage: Other ML13333B3161985-11-0808 November 1985 Notification of 851114 Meeting W/Util in Bethesda,Md to Discuss Util App R Submittal Re Fire Protection Project stage: Meeting ML13316A8801985-12-0202 December 1985 Evaluation of Exemption Requests from 10CFR50.48 & App R to 10CFR50, Request for Info Project stage: Request ML20207A6101985-12-0303 December 1985 Forwards List of Current Fire Protection Enforcement Actions,Per 851106 Request.Suggested Schedule for Affected Licensees to Comply W/App R Requirements Will Be Provided Project stage: Other ML13316A8771985-12-10010 December 1985 Forwards Franklin Research Request for Info Re 851004 Exemption Requests from 10CFR50.48 & App R to 10CFR50 Project stage: Other ML13317B4811985-12-31031 December 1985 Forwards Addl Info Re Compliance w/10CFR50,App R Safe Shutdown Requirements,Per NRC 851004,1115 & 1210 Requests. Response to Question 8 Delayed Until 860124 Due to Planned NRC 860114 & 15 Visits.W/Two Oversize Drawings Project stage: Other ML13331A8451985-12-31031 December 1985 Requests Fee for 851004 Application Requesting Fire Protection Exemptions Project stage: Other ML20137A6801986-01-0707 January 1986 Notification of 860113 Meeting W/Util in San Clemente,Ca to Review App R Fire Protection Submittal,Including Exemptions Requested for Certain Areas of Facility Project stage: Meeting ML13333B3311986-01-17017 January 1986 Summary of 851114 Meeting W/Licensee to Discuss App R Compliance Review,Including Design of Dedicated Shutdown Sys,Review of Exemptions from NRC Requirements Submitted or Pending & Possible Deviations from NRC Guidance Project stage: Meeting ML13324A8041986-02-14014 February 1986 Forwards Rev 2 to Updated Fire Hazards Analysis.Rev Includes Addl Info Which Amplifies,Clarifies or Updates Existing Text & Reflects All Changes to Facilities Up to 6 Months Prior to Filing Project stage: Other ML13324A8071986-02-18018 February 1986 Forwards List of Fire Areas Where Operator Action Necessary to Achieve Safe Shutdown W/Timing Requirements & List of All Exemption Requests Submitted,Per NRC 860113 Request During Site Visit Project stage: Other ML13331A8481986-02-25025 February 1986 Forwards Fee for 851004 Application for Review of Fire Protection Program,Per 851231 Request Project stage: Request ML20141N6651986-03-11011 March 1986 Responds to 860220 Request for Info Re Secy 85-306,including Licensees Using New Interpretations of App R to 10CFR50 & Effect of New Interpretations on Compliance Schedules in EDO 851226 Memo.List of Plants Requesting Evaluations Provided Project stage: Other ML13324A8391986-04-23023 April 1986 Forwards Rev 1 to 01-0310-1435, San Onofre Generating Station Unit 1,10CFR50,App R,Section Iii.G Compliance Evaluation. Rev Incorporates Evaluation of Circuits for Which Field Walkdown Required Project stage: Other ML13324A8551986-05-15015 May 1986 Forwards Safety Evaluation Accepting Listed Util Submittals Re Sections III.G.3 & Iii.L of App R to 10CFR50 Re Alternative Shutdown Capability Design Project stage: Approval ML13324A8581986-05-15015 May 1986 Safety Evaluation Accepting Util Proposed Alternative Shutdown Capability Design in Event of Fire to Comply w/10CFR50 App R Requirements Project stage: Approval 1984-03-26
[Table View] |
Text
Docket No. 50-206 DEC 5 - 1983 Southern California Edison Company ATTN: Mr. R. Dietch,lVice President Nuclear Engineering and Operations 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Gentlemen:
SUBJECT:
10 CFR 170 FEES FOR FIRE PROTECTION REVIEWS AND APPROVALS FOR SAN ONOFRE GENERATING STATION UNIT NO. 1 The purpose of this letter is to address the fee requirements of 10 CFR 170 as they relate to actions pertaining to the fire protection requirements of 10 CFR 50. On February 17, 1981, 10 CFR 50.48 and Appendix R, which added fire protection requirements for operating nuclear power plants, became effective. Prior to that date, fees were exempted for the review and approv al of fire protection actions based on Branch Technical Position BTP APCSB 9.5-1 and its Appendix A. Since the February 1981 amendment of 10 CFR 50, there have been a number oferequests filed by licensees for their plants.
These requests consist of exemptions from schedular and other requirements, and other reviews (e.g., alternate safe shutdown capability).
It is current NRC policy to exempt from fees all of the fire protection ex emptions granted pursuant to 10 CFR 50.12 by the staff of the Division of Licensing (DL) unless a license amendment or other approval is also required.
On this basis, fees have not been requested for any of these types of exemp tions. Fees will be charged for all other approvals and denials relating to fire protection. This means that the review and approval of the alternate safe shutdown capability and any reviews which result in a denial of a re quest for your facility are subject to fees pursuant to 10 CFR 170.22. A DL letter dated November 24, 1980, informed all reactor licensees with plants licensed prior to January 1, 1979, that fees were required for re quests for Commission action resulting from the fire protection rule.
Based on a review of the fire protection requests filed by your Company for the subject facility, we find that a total of $4,000 is required. The en closed list reflects each request, any fees paid, fees due, and the DL staff's OFIFCE)O.
OPPICE 8312120363 831205 SURNAME).-
PDR ADOCK 05000206 F
PDR DATE0I NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY
-2 DEC 5-1983 fee determination and action on each. It is requested that your Company remit
$4,000 to our office for fees currently due on your fire protection requests.
Fees for any future approvals by the DL staff on pending applications currently on file and any subsequent requests by your Company under the current 10 CFR 170 will be in accordance with the position set forth in this letter. For those portions of all applications on the enclosed list which were approved pursuant to 10 CFR 50.12, we have concluded that an exemption, pursuant to 10 CFR 170.11(b),
from the fee requirements is authorized by law and such exemption is otherwise in the public interest and is hereby granted for them.
If for some reason our list does not include all fire protection requests that your Company has on file with the DL staff, we will address the excluded ones in a later letter if fees are required, If they are.approved totally pursuant to 10 CFR 50.12, they will be exempted from fees, but an additional letter will not be sent to you unless required otherwise (e.g., fees paid and refund has to be made).
Sincerely, Original Signed by?
Wm. 0. Miller William 0. Miller, Chief License Fee Management Branch Office of Administration
Enclosure:
List of Applications and Fees DISTRIBUTION w/enclosure:
PDR LPDR W. Paulson, ORB-5 Regulatory Docket File (record 'y.)
H. Smith, ORB-5 T. Wambach, ORB-5 R. Diggs, LFMB LFMB Reactor File LFMB.Pending Check File LFMB R/F OFFICE)
LF
,DL LF DM LFMB:ADM SURNAME RF GS:rmfC loway WMiller j.....
. e.
. 4 DATE 1/,-,241/83 lA
-/83.
/83.
NRC......
ORM.318(080*...
.FICR........C
.C......
NRC FORM 318 (10-80) NRCMO0240 OFFICIAL RECORD COPY
Ljst of Applications and Fees San On re Generating Station, Unit No.*
Docket No. 50-206 Fees Application Date Fees Paid Applicable DL's Fee Determination & Action 3/19/81, supplemented None None Exempt - Issued pursuant to 10 11/9/81 CFR 50.12 on 5/10/82.
Schedular exemption 12/22/81 - Exemption None None Exempt -
Issued pursuant to 10 from installation of CFR 50.12 on 3/5/82.
emergency lighting 6/30/82
- 1. Alternate Safe None
$4,000 Single safety issue; approved on Shutdown 11/18/82.
- 2. Schedular None None Exempt - Issued pursuant to 10 CFR Exemption 50.12 on 3/23/83.
FEES DUE........$4,000