MONTHYEARML19317G9761977-12-0808 December 1977 Responds to NRC 770804 Request.Forwards Review of Requirements,Commitments & Procedures in Conjunction W/ Proposed Tech Specs Re Fire Protection.Util Has Complied W/Fire Protection Responsibilities During NRC Audits Project stage: Request ML19319D8981978-02-28028 February 1978 Amend 19 to License DPR-54,adding License Conditions to Completion of Fire Protection Mods Project stage: Other ML19309A1261978-02-28028 February 1978 Double Bibbed Supplied-Air Hood, Prepared for Doe.Fr Notice Re Respiratory Protective Devices,Tests for Permissability & Fees Encl Project stage: Request ML19319D9031978-02-28028 February 1978 Notice of Issuance & Availability of Amend 19 to License DPR-54 Project stage: Other ML19319D9021978-02-28028 February 1978 Safety Evaluation for Fire Protection Sys Supporting Amend 19 to License DPR-54 Project stage: Approval ML19319D8961978-02-28028 February 1978 Forwards Amend 19 to License DPR-54,safety Evaluation & Notice of Issuance & Availability.Requests Addl Info by 780301 Project stage: Approval IR 05000312/19780081978-06-19019 June 1978 IE Investigation Rept 50-312/78-08 on 780609.No Noncompliance Noted.Major Area Investigated:Allegation That Bechtel Neglected to Correct Significant Design Error in 1972 Project stage: Request ML19309B0561978-08-28028 August 1978 Submits Proposed Mod Design Details Re Fire Protection in Response to NRC 780228 Request for Addl Info Per Fire Protection Safety Evaluation.Revision of OL Amend 19 Requested to Delete Ref to Fire Area 50 Project stage: Request ML19269B7831978-11-14014 November 1978 Responds to NRC 780921 Rejection of Design Criteria for Installation of Ionization Detectors in Areas Containing Both Combustibles & Equipment/Cables Required for Safe Shutdown.Requests Approval of Schedule to Make Related Mods Project stage: Request ML20148T4491978-12-0101 December 1978 Application for Amend 61 to License DPR-54,reflecting Changes to Table 3.1 of Fire Protection Safety Evaluation Project stage: Request ML19256A6141978-12-14014 December 1978 Amend 25 to License DPR-54 Revising Completion Date for Mods Intended to Improve Level of Fire Protection at Facility Project stage: Other ML19256A6151978-12-14014 December 1978 Safety Evaluation Supporting Amend 25 to License DPR-54 Project stage: Approval ML19256A6181978-12-14014 December 1978 Notice of Issuance & Availability of Amend 25 to License DPR-54 Project stage: Other ML20147H1371978-12-14014 December 1978 Approves Supplemental Info Re Section 3 of Fire Protection Ser,Including Installation of Thermal Insulation on Channel A,C & D Conduits,Mod of Lube Oil Pump Control Circuits Associated W/Hpis & Procedures for Diesel Generators Project stage: Other ML19256A6111978-12-14014 December 1978 Forwards Amend 25 to License DPR-54 in Response to 781201 Application.Revises Completion Date for Mods Intended to Improve Fire Protection at Facility.Also Forwards Suppl 1 to Fire Protection Safety Evaluation Supporting Amend Project stage: Approval ML13317B4841979-04-26026 April 1979 Reactor Overpressurization System PT-425X1 & PT-425X2 Installation Detail Project stage: Other ML19257D6631980-01-17017 January 1980 Advises of Acceptability of Designs Proposed for Implementing Mods Re NRC Fire Protection Safety Evaluation Sections 3.1.30(2) & 3.1.31(2).Makeup Pump Room & Penetration Valve Area Altered to Assure Safe Shutdown Project stage: Approval ML19340B3881980-09-25025 September 1980 Forwards Questions Re Proposed Amend 68 to Tech Specs Project stage: Other ML17328B0571980-11-24024 November 1980 Ltr to All Power Reactor Licensees W/Plants Licensed Prior to 790101.Forwards Revised Section 10CFR50.48 & App R Re Fire Protection Features in Nuclear Power Plants & List of Requirements for Resolution of Open Issues.W/O Encl Project stage: Other ML20126F9621981-03-17017 March 1981 Ceramic Fiber Blanket Wrap for Fire Protection of Cable Trays & Conduits Project stage: Other ML19343C5151981-03-17017 March 1981 Discusses Util Plans for Implementing App R Requirements to 10CFR50 Re Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101,in Response to NRC 810220 Request.Reassessment of Each Fire Area Encl Project stage: Other ML20010E3111981-08-20020 August 1981 Notice of Issuance of Amend 35 to License DPR-54 Project stage: Approval ML20010E3051981-08-20020 August 1981 Forwards Amend 35 to License DPR-54,safety Evaluation & Notice of Issuance.Amend Revises Tech Specs to Incorporate Newly Installed Fire Protection Sys Project stage: Approval ML20010E3081981-08-20020 August 1981 Amend 35 to License DPR-54 Revising Tech Specs to Incorporate Newly Installed Fire Protection Sys Project stage: Other ML20010E3091981-08-20020 August 1981 Safety Evaluation Supporting Amend 35 to License DPR-54 Project stage: Approval ML20038A9151981-11-19019 November 1981 Forwards Sketches of Raceway Layout in Fire Area 47 of Facility,In Response to Gage-Babcock Associates,Inc Request. Trays M39A1,M39AG1 & M39AD8 Have Been Insulated W/Kaowool Blankets.Table Re Function of Raceway Cables Encl Project stage: Other ML20039D5401981-12-14014 December 1981 Advises of Postponement Until 820122,for Installation of Control Room Emergency Lights Required by 10CFR50.48. Installation of Lights Requiring Outage for Placement Will Begin Sept 1982.Delays Due to Late Deliveries Project stage: Other ML20040C8211982-01-0707 January 1982 Special Rept:Due to TMI-related Mods,Several Fire Barrier Penetrations Have Been non-functional for Periods Greater than 7 Days Project stage: Other ML20040E2041982-01-12012 January 1982 Forwards Safety Evaluation of Westinghouse Basic Safety Rept.Transient Analysis for Startup of Inactive Reactor Coolant Pump,Excess Load & Loss of Normal Feedwater Acceptable Project stage: Approval ML20041A9801982-02-12012 February 1982 Advises That NRC Will Conduct Fire Protection Review on 820208 to Evaluate Util 810317 Request for Exemptions from Section III.G.2 & Iii.J of App R to 10CFR50.Social Security Info Withheld Per Privacy Act Project stage: Other IR 05000361/19820181982-06-0303 June 1982 IE Insp Rept 50-361/82-18 on 820413-16.No Noncompliance Noted.Major Areas Inspected:Emergency Plan Exercise & Associated Critiques Project stage: Request ML13302A5631982-06-30030 June 1982 Forwards Revision 5 to Physical Security Plan.Revision Withheld (Ref 10CFR73.21) Project stage: Request ML13317A4171982-11-22022 November 1982 Forwards Comments on Technical & Safety Evaluation Repts for SEP Topic VI-4 Re Containment Isolation Sys (Electrical),In Response to NRC .Comments Delineate Differences Between Facility Design & Licensing Bases Project stage: Request ML13317A4301982-11-22022 November 1982 Discusses Implementation of Safe Shutdown Mods to Minimize Risk of Addl Retrofit & Installation Schedule Per Request Re Fire Protection Program Review.All Mods Will Be Completed Prior to Cycle 11 Startup Project stage: Other ML13317A4641982-12-15015 December 1982 Forwards Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info, Supplementing 820630 Response to Generic Ltr 81-12,dtd 810220 Project stage: Supplement ML13333A9411982-12-31031 December 1982 Conceptual Study of Remote Shutdown Panel & Associated Circuits Evaluation Re App R,Section III.G.3 & NRC Request for Info Project stage: Request ML20263M6301983-03-0909 March 1983 Tray Lay-out Fire Area 34. No Drawing Date Project stage: Other ML13326A7421983-03-23023 March 1983 Notice of Issuance & Availability of Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features Project stage: Other ML13326A7401983-03-23023 March 1983 Exemption to Time Allowed to Complete Mods & Additions to Fire Protection Features.Date Extended to 831031 Project stage: Other ML13317A1391983-04-25025 April 1983 Corrects NRC Re Fire Protection Mods for Items 3.1.14 & 3.1.7(b) of Fire Protection Ser.Ref Cited Should Be 10CFR50.48(d)(3),not 10CFR50.48(d)(2) Project stage: Other ML13317B4851983-07-27027 July 1983 Wiring Diagram Nuclear Misc Devices:Press,Temp,Level & Flow Sws, as-built Project stage: Other ML13333B9181983-08-0404 August 1983 Advises That Only Rancho Seco & San Onofre 1 in Region V Remain to Be Inspected Per 10CFR50,App R,Section Ii.G Re Fire Protection.Rancho Seco to Be Inspected Between Mar & Sept 1984.San Onofre 1 to Be Inspected in Late FY85 Project stage: Other ML13310B1091983-12-0505 December 1983 Addresses Fee Requirements of 10CFR170 Re Actions Concerning Fire Protection Requirements of 10CFR50.Current NRC Policy Is to Exempt from Fees All Fire Protection Exemptions Granted Per 10CFR50.12 Unless License Amend Required Project stage: Other ML13305A5141984-02-10010 February 1984 Forwards Updated FSAR for San Onofre Nuclear Generating Station,Units 2 & 3,Vols 1-22.Update Submitted as Complete New Fsar,Removing Amend Numbers from Text & Corresponding Margin & Change Bars & Repaginating Pages Project stage: Request 05000361/LER-1984-001, :on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 8402281984-02-13013 February 1984
- on 840111,preparation of Fire Hazard Analysis & Review of Fire Protection Surveillance Results Identified Deficiencies in Fire Protection Program.Review in Progress. Complete Rept Will Be Submitted by 840228
Project stage: Other 05000361/LER-1984-001-01, :on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned1984-02-28028 February 1984
- on 840111,preparation of Updated Fire Hazards Analysis Resulted in 91 Nonconformance Repts (NCR) Re Fire Protection Program Deficiencies.Compensatory Measures Established.Ncr Dispositions Planned
Project stage: Other ML13309B3821984-03-19019 March 1984 Forwards Updated Fire Hazards Analysis,Vols 1-4 Project stage: Other ML13310B3031984-03-26026 March 1984 Responds to NRC Fire Protection Review of Installed Mods & Two Areas of Nonconformance.Corrective Actions:Addl Fire Stop Installation Expected to Be Complete Prior to Startup from Present Outage & Pressure Verification Retested Project stage: Other ML13310A2551984-04-30030 April 1984 Conceptual Design for Dedicated Safe Shutdown Sys Project stage: Other ML13330A1701984-12-13013 December 1984 Forwards Request for Addl Info Re Dedicated Shutdown Sys for Fire Protection.Info Requested within 45 Days of Ltr Receipt Project stage: RAI 1982-11-22
[Table View] |
Text
AUG 0 4 1983 r -3Q Y'flE Corr MEMORANDUM FOR:
Leon E. Whitney, Lead Staff Contact for Fire Protection Division of Quality Assurance, Safeguards, and Inspection Program FROM:
G. B. Zwetzig, Chief, Engineering Programs Section
SUBJECT:
10 CFR 50 APPENDIX R SECTION II.G. FIRE PROTECTION INSPECTION SCHEDULE Region V only has two plants remaining to be inspected in accordance with TIs 2515/61 and 62. They are Rancho Seco and San Onofre Unit 1. As indicated in our telephone conversation of August 1, 1983, these plants are expected to be ready for inspection as indicated below:
PLANT MONTH Rancho Seco March - September 1984 SONGS 1 End FY 85 The basis for these estimates are as follows:
It is our understanding that Rancho Seco submitted their latest exemption request in January 1983 with an additional response in March 1983.
Therefore, it appears that the earliest Rancho Seco should be inspected is March 1984.
San Onofre Unit 1 (SONGS 1) is currently shutdown and intends to remain in this condition until NRR renders a decision on the licensee's back fit proposals. In any event it does not appear that SONGS 1 would be ready for such an inspection until late in FY 85.
8308090397 830804 PDR ADOCK 05000206 G
PDR
Leon E. Whitney
-2 AUG vi3 If you have any questions concerning this schedule, please contact Ken Scown at FTS 463-3849.
G. B. Zwetzig, Chief Engineering Programs Section cc:
V. Benaroya, NRR/CEB T. V. Wambach, NRR J. M. Taylor, IE L. J. Anderson, RI C. C. Williams, RIII M. E. Murphy, RIV T. E. Conlon, RII K. M. Scown, RV T. Young, RV D. F. Kirsch, RV H. Canter, RV A. D'Angelo, RV bcc:
RSB/Document Control Desk (RIDS)
Distributed by RV:
State of CA Mr.Martin Docket file copy pink & green copies RV SCON/dot ZWE IG 8/ /83 8/