ML20024E760

From kanterella
Jump to navigation Jump to search
Ro:On 830722,HPCI Auto Initiated & Injected Into Reactor to Restore & Maintain Level Following Loss of Feedwater Transient.Transient Initiated When RFPT 2B Tripped for Unknown Reasons.Rfpt 2A Out of Svc Due to Fire
ML20024E760
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/27/1983
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
PM-83-715, NUDOCS 8309070028
Download: ML20024E760 (2)


Text

, s Georgia' Power Company Post Office Box 439

. Baxley, Georgia 31513 Telephone 912 367 7781 912 s37- w s US//pg A TL t.t;7 .ijay ,,

CR$it.

8987piaFbwer Edwin I. Hatch Nuclear Plant [ jl g ,

PM-83-715 July 27, 1983 >

PLANT E. I. HATCH Special Report 50-366 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION: Mr. James P. O'Reilly-Pursuant to Section 6.9.2 and 3.5.1 action: c. of Hatch Unit 2 Technical Specifications, please find attached Special Report.

A s H. C. Nix General Manager HCN/SXB/fp xc: G. F. Head J. T. Beckham, Jr.

T. V. Greene C. T. Jones R. Rogers S. X. Baxley Control Room File M-58 Document Control J. A. Betsill

-Cppy

% :IA f~(vfr,[,

8309070028 830727 PDR ADOCK 05000366 S PDR gp Ifl

~4 , > ,

Special ReportL Georgia Power Company Plant E. I.~ Hatch Docket No. 50-366 HPCI INJECTION INTO REACTOR On 7-22-83 at 14:47, HPCI auto initiated and injected into the reactor to restore and maintain level following a loss of feedwater transient.

The transient was initiated when RFPT 2B tripped for unknown reasons.

RFPT 2A was out of service due to an insulation fire earlier in the day.

As of the date of this report, there have been twenty-five (25) in-cidents with HPCI injection into the reactor vessel.