ML19347C725

From kanterella
Jump to navigation Jump to search
Ro:On 801213,sprinkler Sys Providing Protection for Reactor Bldg Heating,Ventilation & Air Conditioning Room Had Been Inoperable for 14 Days.Sys Isolated to Implement Mods for Corrective Action to Open Item in IE Rept 50-321/80-02
ML19347C725
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/19/1980
From: Manry M
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
PM-80-1237, NUDOCS 8101050235
Download: ML19347C725 (2)


Text

, e m,. .. .. .u.ir v

  • k .u 9 ?
  • }-

E, E

, c-2  % m L A- to 2

itch Nuck or Plan, GeorgiaIbwer l7 ", Edwin,

,; F_ , , e'.p ~ s . ,, ,4, - , . ,v.r c , wm v .. :

?

l  ;-

15

'~

December 19, 1980 PM-80-1237 PLANT E. I. HATCH Special Report Docket # 50-321 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Mariet ta Street Atlanta, GA 30303 ATTENTION: Mr. James P. O'Reilly Pursuant to section 6.9.2 of Hatch Unit 1 Technical Specifications, please find attached a Special Report.

-_ 6% ALfL A M. Manry ,

Plant Manager l BEB/pebc xc: J. T. Beckham, Jr.

W. A. Widner J. R. Jordan D. W. Howell W. F. Garner J. C. Vance T . .V . Greene C. T. Moore C. L. Coggin B. E. Brown File: L43 810105 0 A% S

O d

Special Report Georgia Power Company Plant E. I. Hatch Docket #50-321 December 18, 1980 INOPERABLE SPRINKLER SYSTEM on 12-13-80, at 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br />, the sprinkler system providing protection for the Unit I reactor building HVAC room had been inoperative for a period of 14 days. This system was isolated in order to implement design modifications that will bring the system into NFPA code compliance and will provide corrective action for NRC I&E open item 50-321/80-02-02.

Modificalion work and system functional test are expected to be complete by 1-1-81.

.