Ro:On 801213,sprinkler Sys Providing Protection for Reactor Bldg Heating,Ventilation & Air Conditioning Had Been Inoperative for 14 Days.Caused by Implementation of Design Mods to Bring Sys Into NFPA Code Compliance
ML19340D825
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/19/1980
From: Manry M
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
PM-80-1237, NUDOCS 8101050427
Download: ML19340D825 (2)


Text

.

.-i b o- b \

i u.m djnuseum GCO!yia POWCf

,Di in

1

? December 19, 1980 PM-80-1137 PLANT E. I. HATCH Special Report Docket y 50-321 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region 11 Suite 3100 101 Marietta Street Atlanta, GA 30303 ATTENTION: Mr. James P. O'Reilly Pursuant to section 6.9.2 of Hatch Unit 1 Technical Specifications, please find attached a Special Report.

?

f,__fht- /Q G4~G 44 M . Manry Plant Manager BES/pebe xc: J. T. Beckham, Jr.

W. A. Widner J. R. Jordan D. W. Howell W. F. Garner J. C. Vance T. V. Greene C. T. Moore C. L. Coggin B. E. Brown File: L43 8101050 417 Q

Special Report Georgia Power Company Plant E. I. Hatch Docket #50-321 December 18, 1980 INOPERABLE SPRINKLER SYSTEM On 12-13-80, at 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br />, the sprinkler system providing protection for the Unit I reactor building HVAC room had been inoperative for a period of 14 days. This system was isolated in order to implement design modifications that will bring the system into NFPA code compliance and will provide corrective action for NRC I&E open item 50-321/80-02-02.

Modification work and system functional test are expected to be complete by 1-1-81.