OPERATING DATA REPORT 50-366 DOCKET NO.
DA1E
'-3-'9 CO31PLETED BY S.
Wilson TELEPIIONE ol2-367-7781 OPERATING CTATUS N"
- 1. Unit Nime:
" itch - 2
- 2. Reporting Penod:
Januarv
- 3. Licensed Thermal Power (51Wt):
243p
- 4. Nameplate Rating (Grors Slwe):
7d'
- 5. Design Electrical Rating (Net 51Wel:
716
- 6. Sfaximum Dependable Capacity (Gross SIWE):
- 7. 51aximum Dependable Capacity INet ?.lWei:
- 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:
thanged To Reficct New Utility Ratings
- 9. Power Level To hhich Restricted. If Any (Net alwe;
- 10. Reasons For Restrictions.lf Any:
This 31onth Yr.-to-Dat e Cumularise 744 744 5161 i1. Hours In Reporting Period 23.0 2a.0 2655.5
- 12. Number Of Hours Reactor Was Critical 0
0 o
13, Reactor Reserve Shutdown Hours 0
0 1386.6
- 14. Ilours Generator On Line 0
0 0
!!. Unit Resene Shutdown Hours 1012 1012 2006953
- 16. Gross Thermal Energy Generated OthH) 0 0
53o600
- 17. Gross Electrical Energy Generated (5th Hi
-3978 4g9534
-3978
- 18. Net Electrical Energy Generated OthH)
N/A N/A N/ A
- 19. Unit Senice Factor N/A N/A N/A
- 20. Unit Availability Factor N/A N/A N/A
- 21. Unit Capacity Factor IUsing 51DC Net)
N/A N/A N/A
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Nest 6 31onths (Type. Date,and Duration of Each :
- 25. If Shut Down At End Of Report Period. Est; mated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed 7-4-78 INITIAL CRITICALITY 9-22-id INITIAL ELECTRICITY 3-1-79 CO%1\\1ERCI A L OPER A TION (4/77 )
7 9 0 213 0 dll
AVERAGi. DAILY UNIT POhER LEVEL 50-366 DOCKET NO.
UNIT Hatch -
DATE 2-5-79 S. Wilson COstPLETED BY TELEPilONE 017 167-7701 anuary SiONTil DAY AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL (StWe-Neil (5tWe Neti
~4 4
I 17
-4 18
-4 2
-3 19
-5 3
~4 4
20
-7
-3 21
-R
-3 22
-7 6
7 23
-6
~4
-4 24
-5 8
9 2S
-5
-4
-5 10 26
-6
-7 27
-6 11
~7 28
-6 12
-6
-8 29 13
-8 3o
-s 14
-5 3i
-9 15 4
16 INSTRUCTIONS On this format,hst the average dady unit power levelin \\tWe-Net for each day in the reporting inonth. Compute to the nearest whole rnegawatt.
(9/77)
~T
e DOCKET NO.
50-166 U MIT SilVTDOWNS AND POWER REDUCTIONS UNIT NA%1E liatch - 2 o
DATE 2/5/79 COMPLETED !!Y S. Wiison REPORT MONTil January TELLl'110NE 912-367-7781
~k
&a Cause 1 Cor r,ctive
,=5 us :.5 %
Licensee 5*,
e r,
c'
.2 _e s
N," -
DJfc 3@
3s5 Event T
8 '8 Action io
-o 83 5
j@-
Report #
- iG V
Prevent Recurrence O
79-01 1-1-79 S
744.0 8
1 RA XXXXXXX Dryer Outage - Modification I
- 1 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Sci eduled A liquipment Failure (Explain) l Manual for Preparation of Data B \\!.:fritenanee oi's est 2 Manual Scram.
Entry Sheets for I.icensee C Refochng 3 automatic Scrain.
Event Report (LLIO Fce (NUREG-D Itegulatory Restriction 4 Orrier (Explain) 0161) 1:-Operator Training & License Examination 5
F. Adreinistrative E shibit 1 Same Source G 0;.erational 1.r ror (lixplain)
(9/77) 11 Oti.cr (Explain) e4
NARRATIVE SUMmRY HATCH S Jaii. 1 Dryer Mudificaliun Outage In Progress Jari 31 Rx. CriLical COSS CST There was no single releate of radioac tivi ty or s iti9 le radiat.iun exposure which eccounts for inu r e than 10 percent of line allowable annual values during the inun th uF Jatiuery.
HATCH 2 SAFETY PELATED MAINTETJANCE RFGUESiS TO EE REPCHTED FOR JANUARY L979 LJ.' m!22t Qa12 C2mE1212d QuntiEliuu a
78-28/O 1-18-79 Reniu s e copper wire f r uni s h iios.
add uhitas and adjus t lu
.010 clear aiice 78-3076 11-6-78 Inive s tiva le RTO's 2T47 NGO2.
3.
9 10, 14, and 15 c.alibrale as needed 78-3077 11-6-78 Install duc two: k,
fanu supuurL devices, e tc. per DCR 75-270 78-3079 11-6-78 R ewo r t<
cables TFE315r101 and TFE41E.M01 per DCR-270 78-3050 11-6-78 Install switches.
l i g li ts,
and intei nal wiring in venulu EH11-Pf54 and 2H11-PE57 ver DCR 78-270 78-3292 1-16-79 Invesiiucle and repair dryuell temp. recorder 78-3569 12-27-78 Calibrai.e RCIC flow con troller at remole uhutdown panei 78-3642 1-3-79 Invesligale.und repair luebine bid 9 s t earn leak de tet. L t on switches 76-3754 1-15-79 Calibrate switches as per HNP-2-5234 78-3766 1-16-79 Replace d ia p hr a9tn.
inspect and a d,iu s t sprin9 tension un core spray bypass valve 73-3955 1-17-79 Invecti9 ale a n <J repair red liglil in testable thet e valve t
2Edl-FOO613 78-4129 1-17-79 Install a
Glow gauge in tiie cooling water supply tu the RWCU putups
HATCH 2 SAT-tETY RELATED MAINTEt1ANCE REGUESTS TO BE PEPCH TED FUR J/+NU/4RY 1979 Uuwkuu DULu Cuw2Lulud QuhLui2L1uu 78-4176 1-15-79 Check heater breaker and heater to de terinine why authet r_ oo l an L
- 11 not slay wi thin limits o+
- 110 de9rees F 78-4414 1-22-79 Re route cable so as not to intetfeie with D/G 2A LG9P alarm switch 78-4432 1-10-79 Disconnec t cables TFE 11Ef101 TFE41ET1ve, e.cm15Mol, TFEM15MO2 and tag as spares 78-4501 1-23-79 Inveutapate and repeir non-opentau of 2G31-i O'/6A air inlet valve 78-4541 1-19-79 Check covers on 821 suitches 78-4605 1-16.-79 Repair seal on outboaed MS1V hydraulic snubber 78-4641 1-11-79 Repair valve on air inlet vessel 2A 75-4740 1-23-79 Repair non-openiny of ex.
H2O cleanup s ys letu venuel A
plenum vent valve 78-4753 1-15-79 InspecL all plant fice bareiers per fire evalua tion drawinus.78-476S 1-11-79 Repair poinis on mulLiveinter Lernperature recordei-T
HATCH 2 SAFETY RELAlED MAINTENANCE REGUESTS TO BE RERCRiED FOR JANUAHY 1979 Uuwket Qa12_C2WEl:12d OthiciEiinu 78-4843 1-9-79 Remove FPV lieud iii ac c ot 'Jaisc e with HNP-2-6720
' u i-wuch on s t eern dryer 78-4906 1-23-73 IiispecL and repair PWCU vessel B irilet uulboatd isoluttuu valve 78-4947 1-7-79 Modify duur handles un CA8 airlock duuru 2H29 &. EH25 78-4933 12-22-78 Repaii-fite seals iii FPS MC and cable spreadiou r o uin t,78-495S 12-22-78 Repair fli e seals at tab 1e tr ays 2HLA/03 and 2HKX701 in Rx. 81d9 78-5009 1-15-79 Install 3
hr.
fire cated silicutie fuani seals in peneira tions 78-5031 1-6-79 Clean the p is lui shaft eri tire snubbei-in ina in s i.eani line turbine b1du.
78-5087 1-2-79 Tigh ten packing of MOV s Levin supply to RCIC 78-5131 1-14-79 Iiis ta l l a
partition L
. ween each RWCU pump and mu lui per DCR 73-:129 78-5134 1-16-79 Investi9 ate and tupotr safetv blowduwti volve leakin9 alarm 78-5173 1-8-79 Investisate and repair 125/250 ba tter y char 9er &A O
e e
HATCH 2 SAFETY PELATED MAINTEN,'.NCF_ HEGUESTS TO GE REPCHTED FCH JANUARY 1979 5
duwkut Qain_Cuwainiud Quhutinliun 78-5176 1-E-79 R e p o l i-ated calibi ale ed peti uti RSM "B" i et ot der-78-5120 1-3-79 Check FPC s ys tein skimmei-s u r g e t atil< "A" low level silui in 78-5185 1-25-79 TighLeti mu l t i p o i n I.
Leing.
- ecor dei PG11 1e 191 t eine,
alet m titic r uswi tc h 78-51S6 1-19-79 Install new insulaticie a:eund valve boistiet 78-5187 1-5-79 Replace benL 5/8" all thread 1 od ott o p el*d I.o t-suppol 1 Itali9el-78-5193 1-1-79 Investigate and r epa i r-niultipoin t : ecor det-on 2Hil-P654 78-5194 1-3-79 Unhang CRD teinp. recorder 78-5209 12-23-78 Obtain data requested v e r-TER 78-13 for ecirc s y c t ron ilid i color s,
irie t e r s,
and recordet.s 78-52:f3 12-30-78 Reset ptessure blowdowie for-S8LC putup "A"
relief valve 78-5241 1-12-79 Make ino d i f i ca li ciis to diesel gens. 2A Tx EC 7S-5248 1-16-79 Tiphien connectiairs em HTD a i,d dtywell t einp. reco,uer 78-5250 1-9-79 VOIDED 78-5252 1-9-79 Calibrate
'I o p a z inver Let-per HNP-2-52/2
HATCH 2 SAFETY PELNIED MAINTENANW~ RFG8ASi S TO GE FEPORTED FOR JANUARY 197'9 U' awl' et Qui 2_Cumalri2d QuiktiniAnu 7d-52b3 1-9-79 Calibrate lupae iiiver ter per HNP-2-5272 78-5254 1-9-79 Calibrate l'a p a z inverter per HNP-2-5272 78-52/2 1-15-79 Add oil to the PSW Puing "A" 78-52/4 1-6-79 Inspect and calibrate standbv liquid con trol puing
<J i s c iia r u e pl'es sul e uuaue 78-5226 1-3-79 I nves t i 9 a l.e and repair nias Lei-recirc flow controller 78-525/
1-17-79 Irispec t and repair drywell to torus vacuutu breaker 72-5288 1-5-79 Replace hairdwell on valve in l
unit II traveling, screen backward MOV l
78-5295 1-16-79 Inspect and repair safely i
blowdown valve leakin9 a l a rin j
70-5296 1-4-79 Inspect and repair annunctui.or for RCIC Lurbine g o v e r n ci-evid l
b ear i t:9
-l ein p. hi.
i 78-5295 1-3-79 Repair switch on locus cprev on Lest valve I
i 70-5299 l-4-79 Repair LPRM upstele alaria l
l 78-5306 1-4-79 Repair RHR Siw. Lo NHR crosstie I
valve i
78-5315 1-19-79 Calibrate D/W ered loruu wa t ei-level indicator
HATCH 2 SAFETY FELATED MAINTENANCE R93UESTS TO BE REFCRTED FUR JANUARY 19/9 Uuwknu Dahu Cuwakulud Duuuululkuu 78-5330 1-8-79 Charige bulb in antrunt ia lot-fue1 oil day larik li t & low a lai vir 78-5332 1-11-79 Add oil to u p p ei-and l o w ei-iesorvois9 on plant servit:
wa t er-pump 78-5333 1-12-79 Repair-a i s-boos let-pump f oi-iesin I. i a p H/W 78-5334 1-23-79 Investivele non opertinu of valves 2G31 F07EA avid 2G31 F053A 75-5337 1-4-78 Inspect and epuis-pen on D/W lorus H2 - Od ecotdet-78-5339 l-23-79 R e pa i s-oil l eal< on MG s e f.
lube oil putrip 81 78-5345 1-4-79 R e p a i ui-inopetalive eed venb on maisi steam line ad.
mort i lui-
- ec ci der-78-5350 1-4-79 Ali9n outboatd biustilielde s un ecisc MG set "A" AC 9enet# Lot-78-5365 1-16.-79 Irives tiua te and i epuis-IPM
ret o: det-78-5366 1-3-79 R e p e i t-unitiunt ia lui.
Rx.
- 8Ldu, verit sup. fans low flow 78-5367 1-21-79 Calibiale LPCI invei ter-fr equetic y 9au9e 78-5373 1-3-79 Replace CRO at tumu la tor pressure uauge 78-5374
.1-15-79 Instal 1 MOV's on Rx.
manual con trol relays 73-5375 1-24-79 Ter mina Le t wtui L RTEDl' F01 in s
panel 2Hil-W 58 t
-o
HATCH 2 SAFETY PELATED MAltJTENANCE WGi.,EbTS TO EE REPOR TED FGR JANUAFY 1979 Uuwkuu Dulu Cuwelulud Q2SLululkuu 73-5359 1-16-79 Replace l i 91s t bulb uti panel EN11-P654 to totitrol e v otii 78-5390 1-16-79 Invecli9 ale end repute reattur vessel low level trip annunciatur 78-5395 1-19-79 Investigale and repair "E"
GEMAC Rx. woter level i n d ii. a t u r 70-5403 1-10-79 Repair SHM "C"
ecorder 2C51-R6C2 78-5404 1-8-79 Grind off sliarp edge of r ec oinb i n e r opera turs panel 78-5409 1-3-79 Cliariye ou t liint t uwi tclies en caridenser and separatur R drain valve 70-5414 1-17-78 Repair leakiity are valve EE11-F034A 78-5416 1-16-78
' Repair turus level iiidit.a tur en EH11-P654 79-1 1-16-79 Replace card in RFP ui1 cotidi tioner trouble e l a rin 79-E 1-19-79 Repair CWU MOV suing hiuli level alar ro 79-4 1-19-79 Reset D/W teing a l e rin to 95 degr ees F pei-HNP-2-5616 79-5 1-19-79 Repair SECT and T/8 n:u l t inuin L tenip. recorder 79-3 1-3-79 Replace and calibrale swilth ESEl-NO31C 79-13 1-3-79 Replace cuil lie ayas la L relay inu d e 1 CPD
?
HATCH 2 SAFETY RELATED ru1NTENANCF_ PHGUESTS TO SE REFCHTED FUR JANUARY 1979 Uuwkun Rule _Cumuluded Dunatinliuu 79-14 1-18-79 Inspec t and repair RHR s ys te'n gate valve 79-16 1-15-79 R e p a i t-biuken packing followw-uti p lave l liva tin:9 s ys tern recirc putilp 79-17 1-5-79 Repair lorus wa let' level li'afisitti liet' 79-20 1-25-79 Investi9a te and reuair FFC
- sys, skiririier surge tanku fluw lu FHF indicator 79-26 1-17-79 Iristall g e le guides in valve butatiet pei OCH 78-486 79-28 1-15-79 Iristall pa le guides in valve businet per I)CR 78-4d6 79-34 1-8-79 Repair disk clearance un F9W puinp ES d i s c lia r 9 e clieck valve dish 79-38 1-15-79 Repair tubing and fi ttitiv s un RHR flow transint L-ler to HSDF 79-45 1-23-79 Repair valve packing on CWOU returti lo Rx. vessel isolation 79-49 1-16-79 Replace card in reut vil cundiliuners trouble
-a n n u n t 1 -a t u r 79-51 1-16.-79 Replace annunciatur cord 79-70 1-1E.-79 Tiglilen keyluck swiLch on lurus spray ur lest valve 79-7d 1-16-79 Repair air leak ute air uulenuid valve lucated in r ec oinb iner coun 79-77 1-15-79 Replace
- liner, "O"
ein9s packing on b u t i.e e fly valve
'or setvice wa i.ee 1. 0 2A diesel 9
HATCH 2 SAFETY RELATED MAINTENANCF_ RtGUESTS TO BE REPCHTED FL'P JANUARY 1579 Uuwhen Q412_C2WEl:12if Q2sttiE112u 79-81 1-11-79 Per f uren CATF. 10 uti cententratur d i s t lia r 9 e to t ont en tra i.or condenser MOV 79-93 1-16-79 Repair O/W cooliii9 unit 7A low delta P conunttetur 79-99 1-26-79 Perf arin CATF 9 one liie t henii t a l redwasle einiunsc 1a lor s79-107 1-19-79 Invest 19 ele atinunt ia lor s tn windowri frante 41 ott 2H11-P650 79-119 1-18-79 Unstic.lc RWCU venL bypass valve 79-120 1-26-79 Tigle ten lock ituL on lian9 er loch el. 130 79-121 1-26-79 Reset liai s 9 et-2821-H1 to it's or i g i tia l position 79-122 1-19-79 Repair recorder 2C51-R60d 79-127 1-27-79 Remove nianliole cover on south side of locus79-132 1-15-79 Repair burned ou' power supply in 2G31-K600 79-137 1-18-79 Repair door on the breaker for MGV EE21-FC%d 79-145 1-25-79 Repair loose operator orni un breeker for 2T47-00018 79-147 1-16-79 Investipate and eepeir stitkiny cor e spray "A"
in i n iniune flow valve 79-148 1-16-79 Repair ein hole leak in weld root valve for EEll-NO26A
HATCH 2 SAFETY RELA ~iED MAINTENANCE ReGLESIS TO BE REFCRTED FCR JANUARY 1979 Uuwkut Quir_CuwE121rd Quintialauu 79-158 1-26-79 Open sheild dout-lu
'A' ec ti c nozzles f ut-Hs suivey 79-173 1-23-79 Adjus t Resin li ip vent valve 79-176 1-26-7'9 Op ers sheild dout s to expose all 12 nozzles foi-inspettzun 2 Sal 79-178 1-23-79 Replace liandwlieels to the c aric en ti e Lui-deits t ly e l eineti t mariual isu. valves79-190 1-25-79 Repair PCIC L u i b ii 's beei iiru ha t einp. a l arin 79-192 1-25-79 Repair lui us wa ter level iridiculoc 79-.93 1-ES-79 Repair RCIC tu r b.
e rin.
diaphia9ui hi piessure a le rtu 79-197 1-24-79 Inveuli9 ate and enele CPD 442'23 pusiLiuti 00 reed swi Lc h 79-203 1-25-79 Replace liyhl bulb-evid card for RFPT/PFJ B
beertnu vil pressure low atinutic ta i.or 79-210 1-23-79 Reinuve patol fruin 12" recirc.
Nozzles fur Suulbwesi des"ccch InspecLtun 79-216 1-26.-79 Replace b l owt i fuses in valve curit; u ller 79-223 1-25-79 Repair cure spray A
nii n i flew valve 79-22S 1-2S-79 Rep lat e niaithe le cover un lurus79-226 1-2S-79 Inves tiuo le end r ep a ii-HPCI luibine inlel drain put hi level alarm e
e
4 HATCH 2 SAFETY RELATED T1AINTENANCE R9iUESTS TO BE REPURTED FGR JANUARY r979 Uuwkrt Q412_C2Waleind Q2hLniniinu 79-228 1-2S-79 Replace eley
- t. a t d in 2A D/G day tank level s w t lc h a l, win 79-269 l-ES-79 Calibia1.e level tiiiasmttlei-cer HNP-2-5210 79-242 1-2b-79 Iiives lipste and ev u u-RCIC leak piotet.Liun luyic p owei-f ailui e alariu 79-263 1-2b-79 Repair turbine vacuutu low annuncialor 79-266 1-25-79 Replace bulbu in tur b ine hydreulic fluild pressu,e trip atinutic ia tor liuhl 79-267 1-25-79 Replace bulbs in tur n i t:3:
ueur oil puinp ruiniitiu eununc i c i.or liglel 79-279 l-2S-79 Replace bulbs in h y <J r au l t :.
fluid level Hi/ Low alarm 79-25b l-24-79 Resel limil swi tch on
'uel grapple per DCR 73-25 P2 79-293 1-25-79 Investigate and repair Rx.
Bld9 ven t flow ecorder e
i 1
l
- - -, - - - -, -..