Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML17328A4481990-09-21021 September 1990 Requests Withdrawal of Mode 6 Proposed Tech Spec Change Since Issue Currently Being Addressed by New STSs ML17328A4331990-08-27027 August 1990 Informs of Preliminary Assessment of 900713 Electrical Contact Accident at Facility.Investigation Concludes That No Safety Rules Violated ML17328A4001990-08-24024 August 1990 Responds to 900725 Ltr Re Commitments Made in Response to Generic Ltr 88-14 on Instrument Air Supply Problems Affecting safety-related Equipment.Simulator Training to Be Provided as Stated ML17334B3781990-08-24024 August 1990 Forwards Info to Certify Plant Simulator Facility.Results of Evaluation of Dual Unit Simulation Facilities Demonstrate That Plant Simulator Performance Compares Favorably W/Units ML17328A4231990-08-21021 August 1990 Forwards Under Separate Cover,Semiannual Radioactive Effluent Release Rept for Jan-June 1990 ML17328A3901990-08-17017 August 1990 Responds to NRC 900720 Ltr Re Violations Noted in Onsite Audit of Spds.Corrective Actions:Apparent Disparity in Selection of Reactor Trip & Sys Capacity or Anticipatory Values Rectified ML17328A3891990-08-15015 August 1990 Forwards Performance Data Sheets for Plant fitness-for-duty Program for Period Jan-June 1990,per 10CFR26.Encl Includes Statistics on Various Categories of Testing,Substances Tested for & cut-off Levels Used ML17328A3571990-08-0202 August 1990 Responds to Open Items in Safety Evaluation of Util Response to Unresolved Issues on post-fire Safe Shutdown Methodology. Open Items 1 & 21 Will Be Closed by Implementing Plant Procedures Providing Equivalent Degree of Protection ML17328A3431990-07-23023 July 1990 Requests Withdrawal of 890830 Proposed Tech Spec Changes Re Sections 3.0 & 4.0.Util Will Resubmit Generic Ltr 87-09 Recommended Improvement Items on Case by Case Basis ML17328A3421990-07-23023 July 1990 Provides Results of Offsite Dose Calculation for Reactor Coolant Pump Locked Rotor Event for Facility Cycle 8.Util Identified Previously Issued SERs Addressing Short Term Containment Analysis & LOCA Containment Integrity ML20055G7551990-07-18018 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-315/90-10 & 50-316/90-10.Corrective Actions:Required Review Performed & Updated Procedure 12 Mhp 5021.019.001 Revised & Issued ML17328A3191990-07-12012 July 1990 Responds to NRC 900601 Ltr Re Violations Noted in Insp Repts 50-315/89-31 & 50-316/89-31.Corrective Actions:Electrical Testing Techniques Improved & Surveillance Procedures for Feedwater Pumps Will Be Rewritten ML17328A3181990-07-0909 July 1990 Responds to Generic Ltr 90-03,Suppl 1, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, 'Vendor Interface for Safety-Related Components.' Licensee Will Contact safety-related Vendors on Annual Basis ML17328A3111990-07-0303 July 1990 Provides Certification of Funding Plan for Decommissioning of Plant,Per 10CFR50.33 & 50.75 ML17328A2961990-06-25025 June 1990 Forwards Response to Generic Ltr 90-04 Re Closeout of Generic Safety Issues.Util Supports Concern & Desire to Close long-standing Generic Safety Issues ML17328A2921990-06-22022 June 1990 Forwards WCAP-12483, Analysis of Capsule U from American Electric Power Co DC Cook Unit 1 Reactor Vessel Radiation Surveillance Program. ML20044A3521990-06-22022 June 1990 Submits Info Re Sensitivity Study Performed on Number of Fuel Axial Intervals,Per Topical Rept, American Electric Power Reactor Core Thermal-Hydraulic Analysis Using Cobra III-C/MIT-2 Computer Code. ML17328A2821990-06-15015 June 1990 Submits Ltr Re Proposed Control Room Habitability Tech Spec Changes & Supporting Analyses,Per 900521 Discussion.Revised Calculations of Control Room Thyroid Doses Will Be Submitted within 60 Days of Receipt of Proposed Generic Ltr ML17328A2741990-06-12012 June 1990 Submits Followup,Per 900205 & 0308 Ltrs & Provides Update Re Inoperable Fire Barrier.Fire Seal Repaired & Restored to Operability on 900419 ML17328A2551990-06-0505 June 1990 Forwards Addl Info Re Util 900126 Revised Response to NRC Bulletin 88-002,per NRC 900509 Request ML17328A7361990-06-0101 June 1990 Forwards Addl Info Re 890825 & 1212 Applications for Amends to Licenses DPR-58 & DPR-74,per Request.Amends Make Changes to Administrative Controls ML17328A7331990-05-29029 May 1990 Forwards Nonproprietary WCAP-12577 & Proprietary WCAP-12576, Westinghouse Revised Thermal Design Procedure Instrument... Methodology for American Electric Power DC Cook Unit 2 Nuclear Power Station, Per 900419 Commitment ML17328A7321990-05-24024 May 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Model 1153 Series B or D or Model 1154 Transmitters Installed at Facility.Transmitters Purchased as commercial-grade Units ML17328A6991990-05-0909 May 1990 Provides Suppl to 900103 Response,Certifying That Fitness for Duty Program Implemented at Plant.Change Also Clarifies When More Stringent cut-off Levels Adopted at Plant Program Apply ML17328A7001990-05-0909 May 1990 Responds to NRC 900406 Ltr Re Inadequacies of Spds,Per Audit on 900221-22.Corrective Actions:Software Mod Will Prevent User from Accessing Displays Other than Iconic Displays from SPDS Dedicated Terminal ML17328A7071990-05-0707 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept Mar 1990 for Donald C Cook Nuclear Plant Unit 1 ML17328A7031990-05-0707 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept for Mar 1990 for DC Cook Nuclear Plant Unit 2 ML17328A6951990-04-30030 April 1990 Certifies That Training Programs for Initial Licensing & Requalification Training of Operators & Senior Operators at Plant Accredited by Inpo,Per Generic Ltr 87-07 ML17328A6861990-04-30030 April 1990 Forwards Annual Environ Operating Rept,Jan-Dec 1989, & DC Cook Nuclear Plant Units 1 & 2 Operational Radiological Environ Monitoring Program 1989 Rept Jan-Dec 1989. ML17328A6801990-04-23023 April 1990 Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Study Planned to Evaluate Alternative Actions to Be Taken for Protecting RHR Pumps ML17328A6771990-04-23023 April 1990 Forwards DC Cook Nuclear Plant 1990 Annual Emergency Preparedness Exercise. Exercise Scope & Objectives & Detailed Scenario Documentation Encl ML17334B3641990-04-11011 April 1990 Responds to NRC 900301 Ltr Re Violations Noted in Insp Repts 50-315/89-31 & 50-316/89-31.Corrective Actions:Reliability Centered Maint Program Initiated ML17328A6601990-04-11011 April 1990 Forwards Updated QA Program Description for Cook Nuclear Plant, Incorporating Editorial,Organizational & Position Title Changes ML17328A6551990-04-0909 April 1990 Responds to NRC 900309 Ltr Re Violations Noted in Insp Rept 50-316/90-08.Corrective Actions:Procedure for Steam Generator Stop Valve Operability Test Revised to Require That MSIV Be Declared Inoperable After Failing Stroke Test ML17334B3601990-04-0606 April 1990 Forwards Revised Figures for Loss of Load Event Previously Submitted in Attachment 4,App B of Vantage 5 Reload Transition Safety Rept Supplied by Westinghouse in Jan 1990. Update Is Editorial in Nature ML17334B3621990-04-0606 April 1990 Forwards 1989 Annual Rept & Projected Cash Flow ML17328A6341990-03-30030 March 1990 Forwards Application for Renewal of Plant NPDES Permit,For Info,Per Section 3.2 of App B to Plant Tech Specs.W/O Encl ML17328A6331990-03-30030 March 1990 Responds to NUMARC 900104 Request for Addl Info Re Station Blackout Submittals.Target Reliability for Emergency Diesel Generator of 0.0975 Established for 4 H ac-independent Coping Category Will Be Maintained ML17328A6321990-03-30030 March 1990 Forwards Response to Generic Ltr 90-01, NRC Regulatory Impact Survey. Util Ack Recommendation by NUMARC ML17328A6221990-03-27027 March 1990 Responds to 900226 Ltr Transmitting Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000. Corrective Actions:Flow Retention Circuitry Setpoints Set to Compensate for Missized Process Flow Orifice ML17328A6191990-03-27027 March 1990 Forwards Payment in Amount of $75,000 for Civil Penalty Imposed Through Notice of Violation Issued in Insp Rept 50-316/89-02 on 891016-20,24-26 & 1204.Response to Violation & Corrective Actions Provided in Separate Submittal ML17328A6161990-03-20020 March 1990 Responds to Generic Ltr 89-19 Re Safety Implications of Control Sys in LWRs (USI A-47).Both Units Have Steam Overfill Protection Sys That Would Automatically Prevent Water Carryover Into Steam Lines If Control Sys Failed ML17328A6121990-03-13013 March 1990 Forwards Monthly Performance Monitoring Rept,Jan 1990. ML17325B3901990-03-0606 March 1990 Forwards Annual Rept to NRC Per 10CFR50.54(W)(2) Re Nuclear Property Insurance ML17325B3921990-03-0606 March 1990 Modifies Application for Amend to License DPR-74 Re Cycle 8, Per 900228 Telcon ML17325B3781990-02-28028 February 1990 Forwards Response to NRC Info Notice 89-056 Re Questionable Certification of Matl Supplied to Dod by Nuclear Suppliers. Matl Capable of Performing Design Function & Acceptable for Continued Use ML17328A5971990-02-27027 February 1990 Withdraws 890203 Application for Amend to License DPR-74, Modifying Tech Spec Table 3.2-1 Re DNB Parameters to Express RCS Flow Rate on Volumetric Rather than Mass Basis ML17334B3511990-02-22022 February 1990 Submits Annual Rept of Changes to or Errors in Acceptable LOCA Evaluation Models or Application of Models for Plants. Wflash Analyses Will Be Superceded by Notrump Analyses for Unit 2,Cycle 8 Reload ML17328A5881990-02-21021 February 1990 Responds to NRC 890914 Request for Addl Info Re Safe Shutdown Methodology.App R Fire Barriers Being Maintained & Surveilled Under 3/4.7.10 for Units 1 & 2 ML17328A5861990-02-16016 February 1990 Provides Revised Comments in Response to NRR Comments During 891213 Telcon Re Allowable Stresses for Piping & Piping Supports 1990-09-21
[Table view] |
Text
~
~ p
+~e REGULATORY I'RNATI ON DISTR I BUT I QN SYS I- ( R IDS >
ACCESSION NBR 861 1 120355 DOC. DATE: 86/1 1/07 NOTARIZED: NO DOCKET FAC IL: 50-315 Donald C. Cook Nuclear Power Planti Unit 1> Ind iana a 05000315 50-316 Donald C. Cook Nuclear Power Planti Unit 25 Indiana 0 05000316 AUTH. NAl 1E AUTHOR AFFILIATION ALEXICH H, P. Indiana 8c Nichigan Electric Co.
RECIP. NANE RECIPIENT AFFILIATION DENTQNp H. R. Office of Nuclear Reactor Regulationi Director (post 851125
SUBJECT:
Responds to 860924 ltr requesting plant schedules f or addressing plant-specific design features of ATNB mitigation sos actuation circuitrg (Ai1SAC). Request for addi info re SER App Ai "Al'fBAC Isolation Device" encl.
DISTRIBUTION CODE: AO55D TITLE: QR/Licensing. Submittal: Salem COPIES RECEIVED: LTR ATWS l ENCL Events QL-83-28
- j. SIZE:
NOTES:
RECIPIENT COP IES RECIP I ENT COP IES ID CODE/NANE LTTR ENCL ID CODE/NANE LTTR ENCL PNR-A ADTS PWR-A EB 1 1 PNR-A EICSB 2 2 PWR-A FOB 1 PNR-A PD4 LA 0 PWR-A PD4 PD 01 3 3 NIQQINQTON D 1 PWR-A PSB 1 1 PNR-* RSB 1 1 INTERNAL: ADN/LFNB 1 0 ELD/HDS3 0 IE/DI 1 1 IE/DGAVT 1 1 NRR LASHER, D 1 NRR PWR-A ADTS 1 1 NRR PWR-B ADTS 1 1 RD/RSIB 1 NRR/TANB 1 EQ FIL 04 1 1 RCN3 1 1 EXTERNAL: LPDR 03 2 2 NRC PDR 02 NBIC 05 1 TOTAL NU}')BER OF COPIES REQUIRED: LTTR 27 ENCL 24
~ g l(5 h~ ~ 'd 1k fhl I
f'I(h - Ilail/ 4 'I 1 I
~ ~
"t ~
l~ ' I
~C(LI( 9 7'- lt ('I f "~ ", 'IIL(f t. I P.' M h i'il lh f"
k
']
1 ('> '
h~(l
,>-,. kil3 ,l I
tf h
( !"
'( I I
~If 'I
INDIANA 8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 November 7, 1986 AEP:NRC:0838V Donald C. Cook Nuclear Plant Unit Nos 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 GENERIC LETTER 83-28; 10 CFR 50.62, AHSAC Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Denton:
This letter responds to your September 24, 1986 letter requesting the D. C. Cook schedules for addressing the plant specific design features of the Anticipated Transients Without Scram (ATWS) Mitigation Systems Actuation Circuitry (AHSAC). Attachment 1 to this letter provides our background understanding of the AMSAC evolution. The purpose of this attachment is to ensure that there is no misunderstanding between ourselves and your staff regarding this issue. Attachment 2 contains responses to the SER and Appendix A of the SER. As we discussed with your staff, we have not responded fully to all SER items in Attachment 2 because we have not received all the required information from the Westinghouse Owners Group. As noted below, we anticipate receiving the necessary information in December 1986.
We have scheduled AHSAC installation and implementation/operation following the refueling outage in 1988 for D. C. Cook Unit 2 and the refueling outage in 1989 for Unir. 1.
Consistent with this plan, we have assumed an August 30, 1987 date for receiving the final AMSAC SER from the NRC to enable us to complete the required design and engineering planning for installation. The key event dates listed below must be achieved in order to support our schedule. This schedule would be impacted and would require revision, should external delays be incurred or major modifications imposed on the design of AMSAC as it currently exists.
- a. Westinghouse Owners Group Draft Technical Specifications (T/Ss) are to be completed and submitted to the NRC by approximately December 1986.
- b. The completion of a. above will enable the American Electric Power Service Corporation (AEPSC) to submit finalized response to the SER by'ebruary 28, 1987.
Sbi1120355 Sb1107 P,'
PDR .',ADOCK
-'"',s l',
-'05000315 PDR
f J 1 j
~ J" 6 I
~ I P
P E
Ci P
Mr. Harold R. Denton AEP:NRC:0838V
- c. We anticipate approval of these Technical Specifications from the NRC by April 30, 1987.
- d. Receipt of c. above will enable AEPSC to submit our plant-specific design to the NRC by May 30, 1987.
- e. Receipt of the D. C. Cook Plant-specific AMSAC SER from the NRC by August 30, 1987 will enable us to finalize the design work.
This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Vice President 0 (qQ Attachments MPA/cm cc: John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman
ATTACHHENT 1 TO AEP:NRC:0838V BACKGROUND OF AHSAC DESIGN
Attachment 1 to AEP: RC: 0838V Page 1 Back round The Westinghouse Owners Group (WOG) provided the analysis and design concept to the NRC for using an Anticipated Transients Without Scram Mitiga'tion System Actuation Circuitry (AMSAC) design. This design incorporates a 25-30 second delay on initiation of AHSAC based on 50% or less feedwater flow to 3 out of 0 steam generators with the reactor power greater than 70%. At this point AMSAC trips the turbine, initiates the motor-driven and turbine-driven auxiliary feedwater pumps, and conserves auxiliary feedwater. It should be noted that AMSAC does not provide a direct input to trip the reactor and does not input in any way into the Reactor Trip System (RTS) or SSPS logic.
Our understanding of the design basis of AMSAC is that a common-mode failure in the Reactor Protection System (RPS) should not result in the primary coolant pressure exceeding 3200 psig (Level C limit). (The term Reactor Protection System is interpreted as the Solid State Protection System (SSPS].) In other words, we are not postulating a failure in the Engineered Safeguard System Actuation System or any of the Engineered Safeguard Systems such as Auxiliary Feedwater. It is for this reason that we are able to utilize the cables from the SSPS outputs to the turbine trip devices, the auxiliary feedwater pump motor breakers, and auxiliary feedwater conservation devices.
The AMSAC system will provide an independent means of tripping the turbine and initiating auxiliary feedwater in the unlikely event of a common mode failure within the Reactor Protection System. The RPS failures that are considered are logic and power supply failures in the SSPS and/or automatic RTS initiation. The Engineered Safeguard Systems are functional and available for mitigating action; e.g., auxiliary feedwater can be used.
It follows then that other design bases accidents such as LOCA, HELB, and plant fires do not enter into AHSAC design bases.
As per the NRC Safety Evaluation Report (SER) 50-315/316, dated September 29, 1986, AMSAC is not required to be safety related; hence, we are not required to meet IEEE-279 (single-failure criterion, de-energize to actuate etc.). Also it is permissible to use existing sensors (including pressure and flow) (ref. above SER, p. 9, para. 3) and final actuation devices, e.g., auxiliary feedwater pump motor circuit breakers and the circuit breaker logic power supplies which are powered from station batteries. AMSAC hardware will be isolated from the RPS flow sensors by qualified, Class 1E, analog isolators at the input, and by relay coil/
contact isolation at the output. Care will be taken to ensure that in case of a seismic event, AHSAC hardware will not adversely interact with the RPS or Engineered Safety Features (ESF) system. AMSAC is a balance-of-plant, non-redundant system.
All AHSAC equipment will be located in a controlled environment in the control room area with major controls/indication integrated into the control room. For these reasons, AMSAC has no EQ or Appendix R requirements.
~ Attachment 1 to AEP:NR 838V Page 2 Attached are two figures: Figure 1 shows the generic Mestinghouse Owners Group option chosen by the American Electric Power Service Corporation (AEPSC) for its AMSAC design Figure igure 2 zs a conceptual1 block diagram of ANSAC that shows its major featur u es. . Ve are in th e process of eveloping deve o 'll design modifications separate from AHSAC th at wi 1 imit steam ump to % or less during power operation. Therefore, the AHSAC system shown here does not contain provisions for limiting steam dump.
A.I.O. E.C.P. 2j 07107$
l OW PFEbWATER. FI oW Ql&H ~psi~E Ladle 1-(nO SCCoads I ~INC DCIa y 5o-l7-0 5CCo45 on gKQil ss4)
Time Bcl4 I W Qe:=@~Ca Iti~
>nova,'l (Q- ao Q RVPA MVF ~AW)
! 0 oolt10+o Ofl Hrta'IM&C 8c'J!cor.. ore i<<idatk54td llho.
l I I planetal Reset I I
I I
Tnrk'ate puallart Fr.a4patcv pgow I
+vip TUY "i4P AMERICAN ELECTIIIC POWER SERVICE CORPORATION PLANT INSTRUMENTATION C CONTROL E.C.P. SKETCH 0 C. Cuok /nit I 4 Unit LO ENG OR DATE 44'H.
QY~>cv 0<t. >I 88Ir CO CI R
NST.C CONTROLS SECTION TITLE ooo ~ WHShC. l oov.
OAK. btbhah~
0 sorer I or I
0 II
I Control Room Ind&ationt 1 I
IE SSPS Input Local l
~
I
~
i CH I,II,III,IV ndicatio a
AMSAC Log(c/
Test I Circuits R N
E To Auxiliary Feedwater P
L Devices 'ctuation U I A I T S I I Y
S To Feedwater Conservation Devices l S II ~
I A I I/I I 0 To Turbine Trip Actuation.Deuices N
l I/I I
~ I I 250VDC 120YAC I
- Existing AHSAC ESF pgguation Train A, 8 Flow Logic ANSAC
,, e I
Xmitters PS Control Inverter Power i,l I
I I
I I
pS I/I om Turbine Exi ting 1st Stage N-T ain Pressure Batter I
Independent t IE I I i Supply l
ATTACHMENT 2 TO AEP:NRC:0838V D. C. COOK PLANT-SPECIFIC RESPONSES
a N
Attachment 2 to AEP: C:0838V Page 1 Diversitv "The plant specific submittal should indicate the degree of diversity that exists between the AHSAC equipment and the existing Reactor Protection System. Equipment diversity to the extent reasonable and practicable to minimize the potential for common cause failures is required from the sensors output to, but not including, the final actuation device, e.g., existing circuit breakers may be used for the auxiliary feedwater initiation. The sensors need not be of a diverse design or manufacture. Existing protection system instrument sensing lines, sensors, and sensor power supplies may be used. Sensor and instrument sensing lines should be selected such that adverse, interactions with existing control systems are avoided."
~Res onse The Cook Plant has two feedwater flow measurement loops for each steam generator. Each loop consists of a transmitter, instrument sensing lines, and a transmitter power supply. These two feedwater flow measurement loops share a common flow nozzle. By using a selector switch, either loop can be selected to provide the signal used for steam generator level control. Both of the loops provide a signal for feedwater flow/steam flow mismatch to the Reactor Protection System (RPS). We plan to use one of the two existing feedwater flow measurement loops (transmitter, instrument sensing lines and transmitter power supply) for AHSAC along with the existing final actuation devices associated with auxiliary feedwater initiation, auxiliary feedwater conservation, and turbine trip. Since an existing loop of transmitter and instrument sensing lines will be used, adverse interactions with existing control systems due to the addition of transmitters and instrument sensing lines will be avoided.
We will be using logic equipment and bistables for the AHSAC system that are diverse from the RPS. These devices will be arranged such that adverse interactions with RPS logic and RPS output relays will be prevented.
- 2. Lo ic ower su lies "The plant specific submittal should discuss the logic power supply design. According to the rule, the AHSAC logic power supply is not required to be safety-related (Class 1E). However, logic power should be from an instrument power supply that is independent from the reactor protection system (RPS) power supplies. Our review of additional information submitted by WOG indicated that power to the logic circuits will utilize RPS batteries and inverters. The staff finds this portion of the design unacceptable, therefore, independent power supplies should be provided."
~Res onse We will use the existing N-train battery and use an AHSAC inverter which will not be used to power any RPS loads. The N-train battery is to AEP: C:0838V e Page 2 independent of the station batteries which power the RPS inverters.
The logic power supply will be direct current from the N-train battery and the bistables will be powered from the AMSAC inverters.
- 3. Safet -related interface "The plant specific submittal should show that the implementation is such that the existing protection system continues to meet all applicable safety criteria."
R~es onse The AMSAC system inputs will" be isolated by analog isolators such that a failure in the AMSAC system will not result in a failure of the RPS.
Based upon the results of further study, one of the following two approaches will be used for the isolators:
- 1) We will qualify and use the presently installed analog isolators which isolate the steam generator level control circuits from the feedwater flow signals to the RPS (feedwater flow/steam flow mismatch) circuits. The AHSAC bistables for sensing less than 50% feedwater flow will be connected into the steam generator level control circuits.
- 2) We will add another analog isolator to four of the feedwater flow analog loops, one for each steam generator. These devices will connect to the AHSAC bistable for sensing less than 50% feedwater flow. This isolator will be powered from the AHSAC 120 V a.c.
inverter.
Relay coil/contact isolation at the AMSAC output will prevent failures within AMSAC from being propagated into the safeguards actuation circuits and the RPS.
ualit assurance "The plant specific submittal should provide information regarding compliance with Generic Letter 85-06, 'Quality Assurance Guidance for ATWS Equipment that is not Safety-Related.'"
~Res ense The applicable portions of the Quality Assurance Program as set forth in the "Updated Quality Assurance Program Description for the Donald C. Cook Nuclear Plant" (FSAR Chapter 1.7) will be applicable to those items of AMSAC equipment designated Class IE. Further details on the other equipment will be included in our submittal following the Westinghouse Owners Group submittal of Technical Specifications.
Maintenance b asses "The plant specific submittal should discuss how maintenance at power is accomplished and how good human factors engineering practice is incorporated into the co'ntinuous indication of bypass status in the control room."
~
~
Attachment 2 to AEP: C:0838V
~Res ense AMSAC will be disabled for repair and maintenance. This will be accomplished through a bypass switch or similar device whose status will be continuously monitored in the control room. The human factors aspect will be addressed in our submittal following Westinghouse Owners Group submittal of Technical Specifications. As noted in our cover letter, our submittal is tentatively scheduled for February 1987.
- 6. 0 eratin b asses "The plant specific submittal should state that operating bypasses are continuously indicated in the control room; provide the basis for the 70% or plant specific operating bypass level; discuss the human factors design aspects of the continuous indication; and discuss the diversity and independence of the C-20 permissive signal (Defeats the block of AMSAC)."
~Res ense We will have continuous indication in the control room when AMSAC is in the bypass mode. The Westinghouse Owners Group WCAP-10858 contains the basis for the 70% power operating bypass level and the diversity and independence of the C-20 permissive signal. The human factors design aspects of the continuous indication will be addressed in our submittal following Westinghouse Owners Group submittal of Technical Specifications. As noted in our cover letter, our submittal is tentatively scheduled for February 1987.
- 7. Means for b assin "The plant specific submittal should state that the means for bypassing is accomplished with a permanently installed, human factored, bypass switch or similar device, and verify that disallowed methods mentioned in the guidance are not utilized."
~Res onse We will utilize a permanently installed switch for bypassing AMSAC.
We will not be using any disallowed methods to place AMSAC in bypass.
The disallowed methods consist of pulling fuses, lifting leads, tripping breakers, or physically blocking relays. On-line testing of the logic portion of the circuits will be done by use of this bypass switch. Relay output testing will be done on an off-line basis.
- 8. Manual initiation "The plant specific submittal should discuss how a manual turbine trip and auxiliary feedwater actuation are accomplished by the operator."
to AEP: C:0838V e R~es onse At the component level, the operator can manually trip the turbine and manually actuate auxiliary feedwater from the control room.
Manual initiation of AMSAC at the system level will be accomplished through a control switch or pushbutton. The human factors aspect of the manual initiation will be addressed in our submittal following Westinghouse Owners Group submittal of Technical Specifications. As noted in our cover letter, our submittal is tentatively scheduled for February 1987.
Electrical inde endence from existin reactor rotection s stem "The plant specific submittal should show that electrical independence is achieved. This is required from the sensor output to the final actuation device at which point non-safety-related circuits must be isolated from safety related circuits by qualified Class 1E isolators. Use of existing isolators is acceptable. However, each plant specific submittal should provide an analysis and tests which demonstrates that the existing isolator will function under the maximum worst case fault conditions. The required method for qualifying either the existing or diverse isolators is presented in Appendix A."
R~es onse AMSAC logic and power supply are independent of the RPS logic and power supply. The AMSAC alarms will be annunicated on annunciators that are powered from the existing control room 125 Vac annunciator bus. The AMSAC analog inputs will be from existing sensors which are powered from existing RPS power supplies. Please refer to our response to Appendix A for information on the isolators.
- 10. Ph sical se aration from existin reactor rotection s stem "Physical separation from existing reactor protection system is not required, unless redundant divisions and channels in the existing reactor trip system are not physically separated. The implementation must be such that separation criteria applied to the existing protection system are not violated. The plant specific submittal should respond to this concern."
~Res onse We have separation between trains of the RPS; therefore, physical separation between AMSAC and the RPS is not required. The RPS separation criteria will remain unaffected by the installation of AMSAC.
- 11. Environmental uglification "The plant specific submittal should address the environmental qualification of ATWS equipment for anticipated operational occurrences only, not for accidents."
to AEP: C:0838V e
R~es ense We will be placing the new equipment for the AHSAC system in a controlled environment in the control room. There are no high-energy lines present in the area; therefore, special 10 CFR 50.49 environmental qualification will not be needed.
- 12. Testabilit at ower "Measures are to be established to test, as appropriate, non safety related ATWS equipment prior to installation and periodically.
Testing of AHSAC may be performed with AMSAC in bypass. Testing of AHSAC outputs through the final actuation devices will be performed with the plant shut down. The plant specific submittals should present the test program and state that the output signal is indicated in the control room in a manner consistent with plant practices including human factors."
~Res onse The testing of AMSAC with the unit at power will be performed with the AHSAC system in bypass. The testing at power of the AMSAC non-safety related components will consist of checking system operation from the input of the bistables to the input of the AMSAC actuation output relays. Full testing of the AMSAC system will require the unit to be shut down." The specific details will be submitted in our submittal following Westinghouse Owners Group submittal of Technical Specifications. As noted in our cover letter, our submittal is tentatively scheduled for February 1987.
- 13. Com letion of miti ative action "AMSAC shall be designed so that, once actuated, the completion of mitigating action shall be consistent with the plant turbine trip and auxiliary feedwater circuitry. Plant specific submittals should verify that the protective action, once initiated, goes to completion, and that the subsequent return to operation requires deliberate operator action."
~Res onse The Westinghouse Owners Group low feed flow design delays the unlocking of AMSAC (C-20 signal) for 60 seconds to allow AHSAC initiation to follow through to completion. The WCAP-10858 provided the basis for this design. Its implementation will be consistent with existing plant turbine trip and existing auxiliary feedwater control circuit requirements.
Initial plant checkout testing will verify that once initiated, AHSAC wil'1 go to completion. Our design requires a deliberate action from the operator to reset the AMSAC system. AMSAC system will be continuously monitored in the control, room.
to AEP: C:0838V Page 6
- 14. Technical S ecifications "Technical specification requirements related to AMSAC will have to be addressed by plant specific submittals."
~Res ense The Westinghouse Owners Group is writing the generic Technical Specifications (T/Ss) and plans to submit them to the NRC for approval in approximately December 1986. We will submit Cook Plant Technical Specifications following Westinghouse Owners Group submittal of Technical Specifications. As noted in our cover letter, our submittal is tentatively scheduled for February 1987.
~ ~
~
Attachment 2 to AEP:NRC:0838V Page 7 SER APPENDIX A, AMSAC ISOLATION DEVICE, REQUEST FOR ADDITIONAL INFORMATION "For the type of device used to accomplish electrical isolation, describe the specific testing performed to demonstrate that the device is acceptable for its application(s). This description should include elementary diagrams when necessary to indicate the test configuration and how the maximum credible faults were applied to the devices.
- b. "Data to verify that the maximum credible faults applied during the test were the maximum voltage/current to which the device could be exposed, and define how the maximum voltage/current was determined.
"Data to verify that the maximum credible fault was applied to the output of the device in the transverse mode (between signal and return) and other faults were considered (i.e., open and short circuits).
- d. "Define the pass/fail acceptance criteria for each type of device."
Res onse to a. throu h d above:
The above information is being developed and will be submitted in our submittal following Westinghouse Owners Group submittal of Technical Specifications. As noted in our cover letter, our submittal is tentatively scheduled for February 1987.
- e. "Provide a commitment that the isolation devices comply with the environment qualifications (10 CFR 50.49) and with the seismic qualifications which were the basis for plant licensing."
~Res ense:
The analog and logic isolation devices will be located in a mild environment (in the control room), so special 10 CFR 50.49 environmental qualification is not required. Our plan is to use analog isolators which are already seismically qualified or to add seismically qualified analog isolators to spare locations in existing seismically qualified Foxboro racks. New equipment will be seismically qualified to meet or exceed the original seismic bases for plant licensing.
- f. "Provide a description of the measures taken to protect the safety systems from electrical interference (i.e., Electrostatic Coupling, EMI, Common Mode and Crosstalk) that may be generated by the ATWS circuits.
- g. "Provide information to verify that the Class 1E isolator is powered from a Class 1E source."
,Attachment 2 to AEP: C:0838V Res onses to f and . above:
The above information is being developed and will be included in our submittal following Westinghouse Owners Group submittal of Technical Specifications. As noted in our cover letter, our submittal is tentatively scheduled for February 28, 1987.