Advises That Three Public Util Districts Withdrew from Supply Sys.Districts Cited Concerns Re Renewing or Obtaining Liability Insurance for Officers & Directors in Supply Sys Related Lawsuits
ML17277B504
Person / Time
Site: Columbia, Satsop  Energy Northwest icon.png
Issue date: 10/01/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GO2-84-525, NUDOCS 8410050221
Download: ML17277B504 (4)


Text

p .REGULATOf INFORMATION DISTRIBUTION 'TEM (RIDS)

AC~ESSION >BR; 8410050221 DOC ~ DATE: 84/10/01 NOTARIZED: NO DOCKET FACIE",;50-397 WPPSS Nuclear Projecti Unit 2~ Washington Public Powe 05000397 50"460 WPPSS Nuclear Projects Unit ig Washington Public Powe 05000460 STN-50"508 WPPSS Nuclear Pr oject< Unit 3~ Washington Public 05000508 AUTH, NAME AUTHOR AF F Il. I ATION SORENSEN<G.CD Washington Public Power'upply System RECIP,NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulationp Director

SUBJECT:

Adv,ises that three public util districts withdrew from supply sys,Three withdr awees cited concerns over renewing or obtaining, liability insurance for officers tt directors in supply sys related lawsuits+

DISTRIBUTION CODE: 8001D COPIES RECEIVED:LTR ( ENCL SIZE ~ "L TITLE: Licensing Submittal: PSAR/FSAR Amdts 8 Related Correspondence NOTES 05000397 01.; 12/20/83 05000460 OL:Deferred.

Standardized Plant ~ PNL icy FSAR AMDTS 8 NON PROP REPTS, 05000508 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENC ID CODE/NAME LTTR ENC NRR/DL/ADL 1 NRR L82 BC 1 NRR L84 BC 1 NRR L83 BC 1 NRR LB2 LA 1 NRR LB4 LA 1 NRR L83 LA 1 AULUCKgR Ol 1 THADANIg M 01 1 NERSESg V 01 1 INTERNAL: ADM/LFMB 1 ELD/HDS2 ELD/HDS4 1 ELD/HDS2 IE FILE. 1 IE/DEPER/EPB 36 IE/DEPER/IRB 35 1 IE/DQASIP/QA821 NRR/DE/AEAB 1 NRR/DE/CEB 11 NRR/DE/EHEB NRR/DE/EQB 13 NRR/DE/GB 28 2 NRR/DE/MEB 18 NRR/DE/MTEB 17 1 NRR/DE/SAB 24 NRR/DE/SGEB 25<< 1 NRR/DHFS/HFE840 NRR/DHFS/LQB 32" 1 NRR/DHFS/PSRB NRR/DL/SSPB 1 NRR/DSI/AEB 26 NRR/DSI/ASB 1 NRR/DSI/CPB 10 NRR/DS I/CS8 09 1 NRR/DSI/ICSB j,6 NRR/DSI/thETB 12 1 NRR/DSI/PSB 19 NRR AB 22" 1 NRR/DSI/RS8 23 REG F LE 04 1 RGN5 RM/ODAMI/t'1I 8 1 EXTERNAL: ACRS 41 BNL(AtlDTS ONLY) 1 DMB/DSS (AMDTS) FEMA REP DI Y 39 1 1 LPDR 03 NRC PDR 02 1 NSIC 05 NTIS 1 NOTES:

TOTAL NUMBER OF COPIES REQUIRED: LTTR 64 ENCL '0

A XII N I 4 I'l <<<<4

<<X I' 1

~ <<4 ll h )f4 '

t'Pff ',Ii 4 II l'4'4 <<

ll 4'1' )i<<4" 'I,X 'i' 4<<' '4

<<lift lit 4 if i 4 f 4l hlr '4 4 4 44 'll f l 4

~ ~~~4 ~

I'1 4 ',I 4 ))P<<II*( ',,4

~ '4 4 4 I) 4<<i I II I,f ft k h

l l<<

II 4 <<r <<

4 pg l

<<f 4

4, 4

4

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 October 1, 1984 G02-84-525 8410050221 841001 PDR ADDCK 05000397 Mr. Harold Denton, Director PDR Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

Subject:

WITHDRAWAL OF THREE PUBLIC UTILITY DISTRICTS FROM WASHINGTON PUBLIC POWER SUPPLY SYSTEM Recently, three (3) Public Utility Districts have decided to withdraw from the Supply System.

The three PUD's, representing Cowlitz, Clallum and Mason counties cited

"... concerns over renewing or obtaining liability insurance for their officers and directors in Supply System-related lawsuits" as a reason for withdrawing from the Supply System.

Withdrawing from the Supply System does not release these Public Utility Districts from their financial and contractual obligation to the Supply System. It does, however, eliminate their ability to sit as members of the Supply System's Board of Directors and to vote on Supply System business matters.

As you are aware, the Supply System is a joint operating agency of the state of Washington. Prior to the withdrawal of these three Public Utility Districts, the Supply System was composed of nineteen (19)

Public Utility Districts and four (4) municipal utilities. Membership now is sixteen (16) Public Utility Districts and four (4) municipalities. Each of these twenty agencies has a reresentative on the Supply System Board of Directors.

The withdrawal of these three PUD's from the Supply System will not impact the Supply System's activities or ability to function in the operation of WNP-2 or at the shutdown WNP-1 and WNP-3 projects. The purpose of this letter is simply to advise you of this change that has occurred in the Supply System organization.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs GCS/kd cc: R. Auluck, NRC J.B. Martin, NRC pout N.S. Reynolds, Bishop, Libermart, Cook, Purcell 8 Reynolds A. Schwencer, NRC