Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17286A280 | 27 August 1990 | Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d) | Fitness for Duty |
ML17286A267 | 23 August 1990 | Provides Info on Steps Taken to Minimize Potential Effects of NRC Maint Insp Interface Record, Form on Candor of Supply Sys Personnel When Talking W/Nrc Inspectors | |
ML17286A264 | 20 August 1990 | Advises That Tech Spec Rev Re ATWS Recirculation Pump Trip Will Be Submitted by 900928,per Discussions W/ P Eng & H Lee | |
ML17285B434 | 20 August 1990 | Withdraws 900302 Request for Amend to Tech Spec 3.8.1.1, AC Sources Reducing Excessive Testing of Diesel Generators. | |
ML20059A541 | 16 August 1990 | Provides Notice of Changes in Key Personnel | |
IR 05000397/1990014 | 10 August 1990 | Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised | |
ML17285B417 | 10 August 1990 | Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised | |
ML17285B404 | 2 August 1990 | Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns | |
ML17285B398 | 30 July 1990 | Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per 890911 Ltr. Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys | |
ML20056A717 | 27 July 1990 | Forwards Partial Vol 1 & Vols 4,5,6 & 7 of FSAR Re Potential Subduction Zones Earthquakes in State of Wa Coastal Area.W/O Encls | Earthquake |
ML17285B399 | 27 July 1990 | Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs | |
ML17285B371 | 12 July 1990 | Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed | |
ML17285B376 | 12 July 1990 | Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring | |
ML17285B378 | 11 July 1990 | Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur | Fuel cladding |
ML17285B384 | 10 July 1990 | Forwards Util 1990 Emergency Exercise Scenario.W/O Encl | |
ML17285B366 | 5 July 1990 | Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager | |
ML17285B364 | 29 June 1990 | Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ | |
ML20055D239 | 28 June 1990 | Forwards Response to Re Violations Noted in Insp Rept 50-397/90-12.Response Withheld (Ref 10CFR73.21) | |
ML17285B357 | 28 June 1990 | Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. | Safe Shutdown Scram Discharge Volume |
ML17285B350 | 22 June 1990 | Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed | |
ML17285B351 | 20 June 1990 | Forwards WPPSS-FTS-129, BWR Transient Analysis Model, for Review & Approval | |
ML17285B344 | 20 June 1990 | Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead | Shutdown Margin |
ML17285B345 | 19 June 1990 | Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions | |
ML17285B343 | 18 June 1990 | Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 | |
ML17285B346 | 15 June 1990 | Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle | Job Performance Measure |
ML17285B330 | 12 June 1990 | Forwards Warrant for $50,000 in Response to Order Imposing Civil Monetary Penalty Dtd 900521 | |
ML17285B325 | 7 June 1990 | Advises That Calculated Max Control Room Temp Re Station Blackout Will Be Provided by 900701 | |
ML17285B293 | 29 May 1990 | Responds to NRC 900426 Ltr Re Violations Noted in Insp Rept 50-397/90-09.Validity of Violation Challenged.Opposes Issuance of Severity Level IV Violation Based on Listed Reasons | |
ML17285B286 | 22 May 1990 | Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991 | |
ML20042G397 | 11 May 1990 | Forwards Revised WMC-051, Washington Nuclear Plant-3 Preservation of Assets Program, Incorporating Changes Noted Through Preservation Experience & Successes Achieved in Improving Environ within Plant Bldgs | |
ML17285B288 | 11 May 1990 | Forwards Engineering Std EES-4,Rev 0, Setpoint Methodology, as Committed in Util 900329 Ltr.W/O Encl | |
ML17285B247 | 1 May 1990 | Advises That No Changes to Tech Specs Required as Stated in 891130 Ltr in Response to Generic Ltr 89-21 Requesting Plant Status on Implementation of USI Re ATWS | |
ML17285B274 | 26 April 1990 | Advises That Util Has No Comments on Licensed Operator Annual Requalification Exam During Wks of 900226 & 0305.All Comments Resolved When Exams Administered | |
ML17285B232 | 25 April 1990 | Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17 | |
ML17285B212 | 19 April 1990 | Responds to Fire Protection Issues Identified in 900201 Notice of Violation.Corrective Actions:Major Hardware Changes Implemented & Independent Consultant Will Be Employed to Review Fire Protection Program | Safe Shutdown Fire Barrier Fire Protection Program Fire Watch |
ML17285B222 | 16 April 1990 | Forwards Status Rept for Commitments Made in 891130 Ltr Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed | Commercial Grade Dedication |
ML17285B188 | 11 April 1990 | Responds to NRC 900312 Ltr Re Violations Noted in Insp Rept 50-397/90-01.Corrective Actions:Complete Job & Task Analysis Completed for Health Physics Technician Training Program & New Program Will Include Training on Fundamentals | |
ML17285B182 | 5 April 1990 | Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively | Exemption Request |
ML17285B174 | 5 April 1990 | Advises That NRC Approved Use of Final Feedwater Temp Reduction in Amend 77 to License NPF-21 | |
ML20012F614 | 4 April 1990 | Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML17285B204 | 29 March 1990 | Requests Review of Encl Topical Rept WPPSS-FTS-127,Rev 0, Qualification of Core Physics Methods for BWR Design & Analysis. Upon Rept Approval,Tech Spec Changes (Per Generic Ltr 88-16) Scheduled for Jan 1992 | |
ML17285B142 | 29 March 1990 | Forwards Revised Schedule for Plant Equipment Setpoint Methodology Program Plan.Methodology Revised to Incorporate Latest ISA Std Draft.Setpoint Program Design Team for FY90 Onsite,Trained & Began Work on 900312 | |
ML17285B138 | 29 March 1990 | Forwards Concluding Rept of Results Requested by Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment. Air Quality Testing Performed to Date Reveals Steadily Improving Results | |
ML17285B113 | 28 March 1990 | Advises of Release of Subchannel Thermal Hydraulic Computer Code & Requests Review of VIPRE-01 Mod-02 & Issuance of SER for PWR & BWR Applications.Bwr Qualification Analyses Completed & Rept on BWR Applications Encl | Feedwater Controller Failure |
ML17285B133 | 23 March 1990 | Responds to NRC 900221 Ltr Re Violations Noted in Insp Rept 50-397/89-40.Corrective Actions:Plant Procedure 10.25.63, Emergency Lighting Insp in Process of Being Expanded to Provide Instructions & Check Sheets to Ensure Uniform Insps | Emergency Lighting Fire Protection Program |
ML17285B131 | 21 March 1990 | Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception | |
ML17285B129 | 19 March 1990 | Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in LWRs & Generic Ltr 89-21 Re Status of Implementation of Usis.Tech Specs Adequate to Verify Operability of Overfill Protection Sys | |
ML17285B117 | 19 March 1990 | Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990 | Fitness for Duty |
ML17285B112 | 15 March 1990 | Provides Level of Property & Liability Insurance Coverage for Facility,Per 10CFR50.54(w)(2) Annual Requirement | |
ML17285B074 | 2 March 1990 | Responds to NRC 900201 Ltr Re Violations Noted in Insp Rept 50-397/89-30.Corrective Action:Plant Personnel Currently in Process of Making Improvements to Plant Operations Procedure Writers Guide | Fire Protection Program |