(PA-LR) 08/27/2007 and 09/15/2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information Pertaining to the Vermont Yank
ML073381198
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/24/2007
From: Rowley J
Office of Nuclear Reactor Regulation
To: Devine J
Entergy Nuclear Operations
References
TAC MD2297
Download: ML073381198 (10)


Text

Page 1 of I Jonathan Rowley - Telephone conference call summaries From: Jonathan Rowley To: jdevinc@entergy.com Date: 10/24/2007 2:41 PM

Subject:

Telephone conference call summaries Attached you will find two conference call summaries for your review and comment.

file://C:\temp\GW} 00002.HTM 12/03/2007

.. Page 1

\ W}00.M tm c:\temp\GVV)00003.TMP Page1 Mail Envelope Properties (471F91EF.BA1 : 12 :35182)

Subject:

Telephone conference call summaries Creation Date 10/24/2007 2:41:51 PM From: Jonathan Rowley Created By: JGR(anrc.gov Recipients Action Date & Time entergy.com Transferred 10/24/2007 2:42:12 PM jdevinc (idevincentergy.com)

Post Office Delivered Route entergy.com Files Size Date & T'ime MESSAGE 398 10/24/20C7 2:41:51 PM TEXT.htm 297 Summary of Telephone Conference - August 27, 2007.wpd 23494 10/24/2007 11:34:14 AM Summary of Telephone Conference - September 14, 2007.wpd 22583 10/24/2007 2:28:16 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification:

Send Notification when Opened Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

I...Jonathan Rowley - Sum mary of Tele-phone Co6nference- August 27, 2007.wpd,,1d1 Pg Page 1-31 LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Vermont Yankee Nuclear Power Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 27, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on August 27, 2007, to discuss and clarify the staff's draft request for additional information (D-RAI) concerning the Vermont Yankee Nuclear Power Station, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's D-RAI.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the D-RAI discussed with the applicant, including a brief description on the status of the item.

The applicant had an opportunity to comment on this summary.

Jonathan G. Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

1. List of Participants
2. List of Draft Request for Additional Information ccw/encls: See next page

DOCUMENT NAME: Conference - August 27, 2007.wpdctempMXLibDirSummary of Telephone Conference - August 27, 2007.wpd OFFICE LA:DLR PM:RLRB:DLR BC:RLRB:DLR NAME JRowley RAuluck DATE / / / / / I II R-6-w-ley - -S-u--m-m---a-r-y---o--f--T--e-l-e-p,-h-o--n--e-- C---o--n-fe--r-e-n-c--e---,A---u-g--u-s-t- 2---7--,---2--0--O---7-.w-p-d- Pa.qe Page 33~

11-Jonathan ~ - Surnr~ary 9f ThI~pJi9ne ~6i~renceT Aiiigusf 27, 2007.wpd TELEPHONE CONFERENCE CALL VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 27, 2007 PARTICIPANTS AFFILIATIONS Jonathan Rowley Nuclear Regulatory Commission (NRC)

Rajender Auluck NRC Bill Rogers NRC Dan Hoang NRC David Mannai Entergy Nuclear Operations, Inc. (Entergy)

John Dreyfuss Entergy Michael Metell Entergy Jim Rogers Entergy David Lach Entergy Areza Arabli Entergy Garry Young Entergy Greg Amandon Entergy Enclosure 1

a'ry of Telephone Conference - August 27, 2007.wpd Page 141 i... ... .... R. . . ......... m ..a.....

A u g u st..2.,................ I DRAFT REQUESTS FOR ADDITIONAL INFORMATION VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION AUGUST 27, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on August 27, 2007, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA).

D-RAI 2.4.4-2 Please provide the results of the review performed to determine the impact of the circulating water piping, pipe supports, and cooling tower cell (2-4) failures on license renewal scoping, screening, and applicable aging management programs. Please include the following:

A. The details of any age related degradation which caused the failure of the circulating water piping, pipe supports, and cooling tower cell. Include the results of the piping and pipe supports inspection and a description of the identified aging mechanism(s).

B. Indicate how the identified age related degradation has been considered, as pertinent operating experience, during license renewal scoping.

C. The potential affect on safety-related SSCs, of a similar piping or structure failure of the nonsafety-related cooling tower cells (and contained circulating water piping and pipe supports) which were not included within the scope of license renewal, including the affect of debris entering the cooling basin [10 CFR 54.4(a)(2)].

D. A conclusion and basis as to whether the scoping results documented in the license renewal application, which initially determined that nine of the eleven cooling tower cells were not within the scope of license renewal, are still valid.

E. Any impact on the aging management programs for circulating water piping, pipe supports, or cooling tower cells.

Discussion: The applicant indicated that the question is clear. This.D-RAI will be reformatted and sent as a formal RAI.

Enclosure 2

Jonatan R-owley - Summary of Telephone Conference-September 14, 2007.wpd Page I LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Vermont Yankee Nuclear Power Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 14, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING A REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on September 14, 2007, to discuss and clarify the staff's request for additional information (RAI) concerning the Vermont Yankee Nuclear Power Station license renewal application. The telephone conference call was useful in clarifying the intent of the staff's RAI.

Enclosure 1 provides a listing of the participants and Enclosure 2 contains a listing of the RAI discussed with the applicant, including a brief description on the status of the item.

The applicant had an opportunity to comment on this summary.

Jonathan G. Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

1. List of Participants
2. List of Request for Additional Information cc w/encls: See next page

DOCUMENT NAME: Conference - September 14, 2007.wpdctempgwprintSummary of Telephone Conference - September 14, 2007.wpd OFFICE LA:DLR PM:RLRB:DLR BC:RLRB:DLR NAME JRowley RAuluck DATE I / / / /

Page 3

- Summary of Jonathan Rowley -, Summary Conference - September Telephone Conference of Telephone -

14, 2007.wpd September 14, 2007.wpd ,Page 3,,'

TELEPHONE CONFERENCE CALL VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS SEPTEMBER 14, 2007 PARTICIPANTS AFFILIATIONS Jonathan Rowley Nuclear Regulatory Commission (NRC)

Rajender Auluck NRC David Mannai Entergy Nuclear Operations, Inc. (Entergy)

Michael Metell Entergy Ted Ivey Entergy Alan Cox Entergy David Lach Entergy 3 Enclosure 1

Jonaha Ro~-SmayTlpoeCnference -September 14, 2007.wpd Page.4 REQUESTS FOR ADDITIONAL INFORMATION VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SEPTEMBER 14, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc. held a telephone conference call on September 14, 2007, to discuss and clarify the following requests for additional information (RAIs) concerning the Vermont Yankee Nuclear Power Station (VYNPS), license renewal application (LRA).

RAI 2.4.4-2 Please provide the results of the review performed to determine the impact of.the circulating water piping, pipe supports, and west cooling tower cell (2-4) failures on license renewal scoping, screening, and applicable aging management programs. Please include the following:

A. A conclusion and basis as to whether the scoping results documented in the LRA, which initially determined that 9 of the 11 west cooling tower cells were not within the scope of license renewal, are still valid.

B. If found that the west cooling tower cells are within the scope of license renewal. Please provide the following:

I. The potential effect of a circulating water piping, pipe supports, or structural failure of the nonsafety-related west cooling tower cells (2-3 through 2-11), which were not included within the scope of license renewal, on safety-related systems, structures, and components (in accordance with 10 CFR 54.4(a)(2)). Include the potential effect of debris entering the deep basin beneath the cooling tower.

II. The details of any age related degradation which caused the failure of the circulating water piping, pipe supports, and west cooling tower cell. Include the results of the piping and pipe supports inspection related to the current failure and any previously performed, and a description of the identified aging mechanism(s).

C. Any impact on the aging management programs for circulating water piping, pipe supports, or cooling tower cells.

Discussion: The applicant indicated that the question is clear. The applicant also used the call as an opportunity to brief the staff on the design and operation of the cooling towers. The applicant will incorporate the points discussed on the design and operation of the cooling towers in the response to the RAI.

4 Enclosure 2