GALL AMP: XI.M33, Selective Leaching of Materials (Audit Worksheet GALL Report AMP)
ML060950629
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/22/2006
From: Morgan M
NRC/NRR/ADRO/DLR/RLRC
To:
Office of Nuclear Reactor Regulation
morgan M NRR/NRC/DLR/RLRC, 415-2232
Shared Package
ML060950189 List: ... further results
References
%dam200611, TAC MC9668
Download: ML060950629 (5)


Text

XI.M33 Selective Leaching of Materials 1

AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________

LRA AMP: __________________________

REVIEWER: ______________________

GALL AMP: XI.M33, Selective Leaching of Materials DATE: __________________________

Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. The program for selective leaching of materials ensures the integrity of the components made of cast iron, bronze, brass, and other alloys exposed to a raw water, brackish water, treated water, or groundwater environment that may lead to selective leaching of one of the metal components. The aging management program (AMP) includes a one-time visual inspection and hardness measurement of selected components that may be susceptible to selective leaching to determine whether loss of materials due to selective leaching is occurring, and whether the process will affect the ability of the components to perform their intended function for the period of extended operation.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

1. Scope of Program A. This AMP determines the acceptability of the components that may be susceptible to selective leaching and assesses their ability to perform the intended function during the period of extended operation. These components include piping, valve bodies and bonnets, pump casings, and heat exchanger components. The materials of construction for these components may include cast iron, brass, bronze, or aluminum-bronze. These components may be exposed to a raw water, treated water, or groundwater environment. The AMP includes a one-time visual inspection and hardness measurement of a selected set of sample components to determine whether loss of material due to selective leaching is not occurring for the Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M33 Selective Leaching of Materials 2

Program Element Auditable GALL Criteria Documentation of Audit Finding period of extended operation.

The selective leaching process involves the preferential removal of one of the alloying elements from the material, which leads to the enrichment of the remaining alloying elements.

Dezincification (loss of zinc from brass) and graphitization (removal of iron from cast iron) are examples of such a process.

Susceptible materials, high temperatures, stagnant-flow conditions, and corrosive environment such as acidic solutions, for example, for brasses with high zinc content, and dissolved oxygen, are conducive to selective leaching.

2. Preventive Actions A. The one-time visual inspection and hardness measurement is an inspection/verification program; thus, there is no preventive action. However, it is noted that monitoring of water chemistry to control pH and concentration of corrosive contaminants, and treatment with hydrazine to minimize dissolved oxygen in water are effective in reducing selective leaching.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

3. Parameters Monitored/

Inspected A. The visual inspection and hardness measurement is to be a one-time inspection. Because selective leaching is a slow acting corrosion process, this measurement is performed just before the beginning of the license renewal period. Follow-up of unacceptable inspection findings includes expansion of the inspection sample size and location.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

4. Detection of Aging Effects A. The one-time visual inspection and hardness measurement includes close examination of a select set of components to determine whether selective leaching has occurred and whether the resulting loss of strength and/or material will affect the intended functions of these components during the period of extended operation. Selective leaching generally does not cause changes in dimensions and is difficult to detect. However, in certain brasses it causes plug-type dezincification, which can be detected by visual inspection. One acceptable procedure is to visually inspect the susceptible components closely and conduct Brinell Hardness testing on the inside surfaces of the selected set of components to determine if selective leaching Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M33 Selective Leaching of Materials 3

Program Element Auditable GALL Criteria Documentation of Audit Finding has occurred. If it is occurring, an engineering evaluation is initiated to determine acceptability of the affected components for further service.

5. Monitoring and Trending A. There is no monitoring and trending for the one-time visual inspection and hardness measurement.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

6. Acceptance Criteria A. Identification of selective leaching will define the need for further engineering evaluation before the affected components can be qualified for further service. If necessary, the evaluation will include a root cause analysis.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

7. Corrective Actions A. Evaluations are performed for test or inspection results that do not satisfy established acceptance criteria. The corrective actions program ensures that conditions adverse to quality are promptly corrected. If the deficiency is assessed to be significantly adverse to quality, the cause of the condition is determined and an action plan is developed to preclude repetition. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective actions.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

8.

Confirmation Process A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

9.

Administrative Controls A. See Item 8, above.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

XI.M33 Selective Leaching of Materials 4

Program Element Auditable GALL Criteria Documentation of Audit Finding Comment:

10. Operating Experience A. One-time inspection is a new program to be applied by the applicant. The elements that comprise these inspections (e.g.,

the scope of the inspections and inspection techniques) are consistent with industry practice and staff expectations.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M33 Selective Leaching of Materials 5

EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #)

1.
2.

ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #)

1.
2.

DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number)

Title Revision and/or Date

1.
2.
3.
4.

.