(PA-LR) Email Additional RAI Recommended for Issuance to VY Applicant to Provide Response
ML073040077
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/04/2007
From: Jeng D
Office of New Reactors
To: Rowley J
Office of Nuclear Reactor Regulation
References
TAC MD2297
Download: ML073040077 (3)


Text

Jona'than RolyR:Additional RAI Recommended for Issuance to VY Applicant to Provide Response Pg From: David Jeng To: Jonathan Rowley Date: 10/04/2007 12:30:54 PM

Subject:

Re: Additional RAI Recommended for Issuance to VY Applicant to Provide Response I read the "Response to Part C" on page 4 of 4 of the VY letter addressing the cooling tower RAI, and still maintain that the applicant should be requested to respond to item 2 below to indicate specific improvements/enhancements that will be.implemented over the existing structure monitoring program applicable to C 2-1/C 2-2 in order to preclude occurrence of similar failure in the future. The staff should review the applicant's response to item 2 below and determine whether the improvements/enhancements proposed by the applicant are adequate and acceptable. The applicant should also be requested to provide response to item 1 below as I previously suggested for staff review.

David /

>>> Jonathan Rowley 10/04/2007 11:51 AM >>>

David Could you read the "Response to Part C" on page 4 of 4 of the VY letter addressing the cooling tower RAI? The response discusses the Structures Monitoring Program that will be used for inspecting the cooling towers.

>>> David Jeng 10/03/2007 2:21 PM >>>

I have reviewed the VY applicant's September 27, 2007 letter responding to staff RAI 2.4.4-2. Although, I have determined that the letter provided response generally consistent with what I have observed during my on site walkdown trip or information received from the VY site engineering staff, I believe the VY applicant should be requested to provide satisfactory response to the following questions to further support your effort of reaching a reasonable assurance of adequate safety conclusion:

1. VY applicant should provide an engineering analysis based justification for asserting that both C 2-1 and C 2-2 will maintain their structural integrity under the combined loading of design basis earthquake plus the hydrodynamic effect/load of the pouring water resulting from a joint rupture of the 60 " diameter fiber glass pipe unless the failure of the pipe joint under the design basis seismic load can be reasonably precluded.
2. The fact that failure did occur in C 2-4, which has been subject to the existing VY inspection program, does raise a concern that the similar failure could have occurred in C 2-1 and C 2-2 (the cells are basically of similar design). Therefore, VY applicant should reassess the current inspection program applicable to C 2-1/C 2-2, and determine ifthe program should be enhanced in terms of its inspection frequency/details etc, in order to reasonably preclude the occurrence of C 2-4 type unexpected failure.

Feel free to contact me if you have questions. Thanks.

David Jeng CC: Laura Dudes; Sujit Samaddar

c \temp\GW}0008 TMP Aa,g--e-i

- Paqeil Mail Envelope Properties (4705153C.94C 24 34910)

Subject:

Re: Additional RAI Recommended for Issuance to VY Applicant to Provide Response Creation Date 10/04/2007 12:30:52 PM From: David Jeng Created By: DCJwnrc.gov Recipients nrc.gov OWGWPOO3.HQGWDOO1I LAD CC (Laura Dudes) nrc.gov TWGWPO02.HQGWDOO1 SKS3 CC (Sujit Samaddar) nrc.gov TWGWPO03.HQGWDOO1 JGR (Jonathan Rowley)

Post Office Route OWGWP03.HQGWDO01 nrc.gov TWGWPO02 .HQGWDO01 nrc.gov TWGWPO03.HQGWDOO1 nrc.gov Files Size Date & Time MESSAGE 3497 10/04/2007 12:30:52 PM Options Expiration Date: None Priority: Standard

'ReplyRequested: No Return Notification: None Concealed