GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle (Audit Worksheet GALL Report AMP)
ML060950301
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/22/2006
From: Morgan M
NRC/NRR/ADRO/DLR/RLRC
To:
Office of Nuclear Reactor Regulation
morgan M NRR/NRC/DLR/RLRC, 415-2232
Shared Package
ML060950189 List: ... further results
References
%dam200611, TAC MC9668
Download: ML060950301 (4)


Text

XI.M6 BWR Control Rod Drive Return Line Nozzle 1

AUDIT WORKSHEET GALL REPORT AMP PLANT: ______________________________

LRA AMP: __________________________

REVIEWER: ______________________

GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle DATE: __________________________

Program Element Auditable GALL Criteria Documentation of Audit Finding Program Description A. This program includes (a) enhanced inservice inspection (ISI) in conformance with the American Society of Mechanical Engineers (ASME) Code,Section XI, Subsection IWB, Table IWB 2500-1 (2001 edition including the 2002 and 2003 Addenda) and the recommendations of NUREG-0619, and Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

B. (b) system modifications and maintenance programs to mitigate cracking. The program specifies periodic liquid penetrant and ultrasonic inspection of critical regions of the boiling water reactor (BWR) control rod drive return line (CRDRL) nozzle.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

1. Scope of Program A. The program includes systems modifications, enhanced ISI, and maintenance programs to monitor the effects of cracking on the intended function of CRDRL nozzles.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

2. Preventive Actions A. Mitigation occurs by system modifications, such as rerouting the CRDRL to a system that connects to the reactor vessel. For some classes of BWRs, or those that can prove satisfactory system operation, mitigation is also accomplished by confirmation of proper return flow capability, two-pump operation, and cutting and capping the CRDRL nozzle without Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M6 BWR Control Rod Drive Return Line Nozzle 2

Program Element Auditable GALL Criteria Documentation of Audit Finding rerouting.

3. Parameters Monitored/

Inspected A. The aging management program (AMP) monitors the effects of cracking on the intended function of the CRDRL nozzles by detecting and sizing cracks by ISI in accordance with Table IWB 2500-1 and NUREG-0619.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

4. Detection of Aging Effects A. The extent and schedule of inspection, as delineated in NUREG-0619, assures detection of cracks before the loss of intended function of the CRDRL nozzles. Inspection recommendations include liquid penetrant testing (PT) of CRDRL nozzle blend radius and bore regions and the reactor vessel wall area beneath the nozzle, return-flow-capacity demonstration, CRD-system-performance testing, and ultrasonic inspection of welded connections in the rerouted line. The inspection is to include base metal to a distance of one-pipe-wall thickness or 0.5 in., whichever is greater, on both sides of the weld.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

5. Monitoring and Trending A. The inspection schedule of NUREG-0619 provides timely detection of cracks.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

6.

Acceptance Criteria A. Any cracking is evaluated in accordance with IWB-3100 by comparing inspection results with the acceptance standards of IWB-3400 and IWB-3500. All cracks found in the CRDRL nozzles are to be removed by grinding.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

7. Corrective Actions A. Repair is performed in conformance with IWB-4000 and replacement in accordance with IWB-7000. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the corrective Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

XI.M6 BWR Control Rod Drive Return Line Nozzle 3

Program Element Auditable GALL Criteria Documentation of Audit Finding actions.

Comment:

8.

Confirmation Process A. Site quality assurance (QA) procedures, review and approval processes, and administrative controls are implemented in accordance with the requirements of 10 CFR Part 50, Appendix B. As discussed in the appendix to this report, the staff finds the requirements of 10 CFR Part 50, Appendix B, acceptable to address the confirmation process and administrative controls.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

9.

Administrative Controls A. See Item 8, above.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

10. Operating Experience A. Cracking has occurred in several BWR plants (NUREG-0619 and Information Notice 2004-08). The present AMP has been implemented for nearly 25 years and has been found to be effective in managing the effect of cracking on the intended function of CRDRL nozzles.

Consistent with GALL AMP:

Yes No Document(s) used to confirm Criteria:

Comment:

XI.M6 BWR Control Rod Drive Return Line Nozzle 4

EXCEPTIONS Item Number Program Elements LRA Exception Description Basis for Accepting Exception Documents Reviewed (Identifier, Para.# and/or Page #)

1.
2.

ENHANCEMENTS Item Number Program Elements LRA Enhancement Description Basis for Accepting Enhancement Documents Reviewed (Identifier, Para.# and/or Page #)

1.
2.

DOCUMENT REVIEWED DURING AUDIT Document Number Identifier (number)

Title Revision and/or Date

1.
2.
3.
4.

.