MONTHYEARIR 05000333/20240902024-10-29029 October 2024 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000333/2024090 JAFP-24-0055, Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation2024-10-29029 October 2024 Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation IR 05000333/20244022024-10-28028 October 2024 Material Control and Accounting Program Inspection Report 05000333/2024402 (Cover Letter Only) ML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24207A0192024-10-0909 October 2024 SE Addendum Related to the License Amendment No. 338 for Implementation of the Alternative Source Term (DPO-2021-001) JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance 05000333/LER-2024-001, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation 2024-09-04
[Table view] Category:License-Operator
MONTHYEARJAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML24008A0302022-11-0909 November 2022 Examination Administrative Files ML22252A0102022-09-0909 September 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22252A0052022-09-0909 September 2022 Final Qa/Related Forms (Folder 1) ML23004A1022022-08-30030 August 2022 Draft Written Examination and Operating Test Outlines (Folder 2) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1112022-03-14014 March 2022 Requalification Program Inspection ML21305B8252021-11-0101 November 2021 Handouts to Applicants (Folder 3) IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 ML21273A1222021-09-0404 September 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21273A1062021-09-0404 September 2021 Final Written Examination with Answer Key (401-5 Format)(Folder 3) ML22355A6492021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22355A6482021-08-30030 August 2021 Final Written Exam and Operating Test Outlines (Folder 3) ML22355A6502021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML23004A0932021-08-30030 August 2021 Final Qa/Related Forms (Folder 1) ML21019A4472021-01-20020 January 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A2042020-04-15015 April 2020 March 4, 2020, Nrc Generic Fundamentals Examination Results for James A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) ML20078K2112020-03-19019 March 2020 Requalification Program Inspection - James A. Fitzpatrick Nuclear Power Plant ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20043C8092020-02-11011 February 2020 Operator Licensing Examination Approval ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19211C3782019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19008A1022019-01-0707 January 2019 Operator Licensing Examination Approval ML18163A2922018-06-12012 June 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18134A2302018-05-14014 May 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B7042018-03-27027 March 2018 Dec. 2016 GFE Post-Exam Comment and Response ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18029A5822018-01-29029 January 2018 Requalification Program Inspection ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17313A2752017-11-0808 November 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1132017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 2024-07-03
[Table view] Category:Fitness for Duty (FFD)
MONTHYEARML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test 2024-06-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE RD, STE 10 2 KING OF PRUSSIA, PENNSYLVANIA 19406 -1415
June 24, 2024
Alexander Sterio Site Vice President James A. FitzPatrick Nuclear Power Plant 268 Lake Road P.O. Box 110 Lycoming, NY 13093
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - LICENSED OPERATOR POSITIVE FITNESS-FOR-DUTY TEST
Dear Alexander Sterio:
On June 13, 2024, your facility reported to the U.S. Nuclear Regulatory Commission ( NRC) via Title 10 of the Code of Federal Regulations (10 CFR) 26.719 that an NRC-licensed operator tested positive following a fitness-for-duty test administered under 10 CFR 26.31(c) on June 13, 2024 (Event Report 57172). Although we have obtained preliminary information, this letter is a formal request for information pertaining to this occurrence. Within 30 days of the date of this letter, please provide responses to the questions listed in the enclosure. In addition, please provide other records and information on this operator's fitness-for-duty that are relevant to this occurrence. If you are unable to meet this deadline, please notify us no later than 15 days from the date of this letter, with the reasons for the delay and a proposed date of submittal.
We request that any personal privacy, proprietary, or safeguards information in your response be contained in a separate enclosure and appropriately marked. The affidavit required by 10 CFR 2.390(b) must accompany your response, where applicable.
You should determine whether the operator meets the requirements of 10 CFR 55.33(a)(1). You should ensure that: (1) the operator meets the general health requirements of ANSI/ANS-3.4-1983; (2) the operator does not have a disqualifying condition under Section 5.3 of that standard; and (3) documentation describing the designated physician's conclusion that the operator meets the requirements of ANSI/ANS-3.4-1983 is available for review by the NRC.
If a conditional license is requested per 10 CFR 55.25, that condition should be documented on NRC Form 396, "Certification of Medical Examination by Facility Licensee," and sent to the U.S.
Nuclear Regulatory Commission, ATTN: Regional Administrator, Region I Office, 475 Allendale Road, Suite 102, King of Prussia, PA 19406-1415.
If you determine that the operator no longer meets the medical qualifications described in 10 CFR 55.33(a)(1), then, in accordance with 10 CFR 55.25, you must notify the NRC, in writing, of the operator's permanent incapacitation. For example, you must notify the NRC if you determine, based on your employee assistance program in consultation with your designated physician, that the operator can no longer meet the medical criteria of ANSI/ANS -3.4-1983.
A. Sterio 2
The NRC will evaluate the information in your reply to this letter to determine if further action is warranted pursuant to 10 CFR Part 50 or Part 55. The information supplied will be maintained in NRC Privacy Systems of Records-16 and will be subject to the Privacy Act.
Please provide a copy of this letter, as well as your response to this letter, to the operator. If you are unwilling to provide this information to the operator for any reason, the NRC will provide the information to the operator when it is available as part of the operators docket file.
If you have any questions concerning this matter, please contact Donald Jackson, Chief, Operations Branch, at 610-337-5306. The requested information should be sent to Donald Jackson via Part 55 EIE submittal. Your cooperation is appreciated.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC w ebsite at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Blake D. Welling, Director Division of Operating Reactor Safety
Docket No. 05000333 License No. DPR-59
Enclosure:
Fitness-for-Duty Request for Additional Information
cc w/encl: Distribution via ListServ
A. Sterio 3
SUBJECT:
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - LICENSED OPERATOR POSITIVE FITNESS-FOR-DUTY TEST DATED JUNE 24, 2024
DISTRIBUTION:
J. Anderson, Chief, NRR/DRO /IOLB R. Lorson, RA D. Collins, DRA F. Gore, RI, OI J. Nick, RI, OE B. Welling, RI, DORS R. McKinley, RI, DORS E. Carfang, RI, DORS E. Miller, RI, DORS, SRI D. Jackson, RI, DORS L. Pinkham, RI, DORS R1Enforcement Resource
DOCUMENT NAME: G:\\DRS\\Operations Branch\\ FFD\\FitzPatrick FFD June 2024.docx ADAMS ACCESSION NUMBER: ML24176A241 SUNSI Review n -Sensitive Publvlle Sensitive n -Publiclyvlable
OFFICE RI O RS/OB RI O /
ME Dckson /J RMcKi /RRM BWli/ B TE 06// 06// 06//
OFFIAL RERD CO Licensed Operator Fitness-for-Duty Request for Additional Information
James A. FitzPatrick Nuclear Power Plant is requested to provide the following information concerning the fitness-for-duty occurrence (10 CFR Part 26.719 ) reported on June 13, 2024, regarding the involved licensed operator:
- 1. Name, Docket Number, and responsibilities of the operator.
- 2. A summary of the operator's entire fitness-for-duty testing history. Please include the dates and times the operator was tested, the reasons for the tests (i.e.,
random, for-cause, or follow-up), the results of the tests, including quantification, and the dates that any tests were confirmed positive.
- 3. Whether the operator used, sold, or possessed illegal drugs. If so, please provide the details of the circumstances surrounding such use, sale, or possession.
OR
Whether the operator consumed alcoholic beverages within the protected area. If so, please provide the details of the circumstances surrounding such consumption.
- 4. Whether the operator was at the controls or supervising licensed activities while under the influence of illegal drugs or alcohol. If so, please provide the details of the operator's performance of licensed duties while under the influence.
- 5. Whether the operator fulfilled a position that was required to meet minimum licensed operating staffing requirements (fire brigade, emergency plan operations, etc.) while under the influence.
- 6. Whether the operator was involved in procedural errors related to this occurrence. If so, please provide the details of the procedural errors and the consequences of the errors.
- 7. The extent to which you reviewed the operators past work history, both on the day of the occurrence and prior to June 13, 2024.
- 8. A determination as to whether or not the Behavior Observation Program identified the circumstances described in Event Report (EN 57172) at the earliest possible opportunity.
- 9. Your intentions with regard to the operator's resumption of duties under the 10 CFR Part 50 and Part 55 licenses, including your plans for follow-up testing.