1111 12:06:12 p.m.
04-12-2024 ENGINE SYSTEMS, INC.
175 Freight Road Rocky Mount, NC 27804 Date:
Company:
Fax Number:
Verification No.:
Reference:
From:
Page:
Dear Sir/ Madam:
TELEFAX April 12, 2024 NRC Operations Center 301/816-5151 301/816-5100 Report No. 10CFR21-0138, Rev. 0 Dan Roberts 1 of 4 Telephone: 252/977-2720 Fax: 252/446-1134 Following this cover is a copy of our report 10CFR21-0138, Rev. 0, for a 10CFR21 reportable notification for an EMD cylinder liner water leak, P/N 9318833 (component of power assembly P/N 40124898), S/N 20D6294.
A copy of this report will be mailed to the NRC Document Control Desk and to our affected nuclear customer.
Should you have questions, please let us know.
Sincerely, ENGINE SYSTEMS, INC.
Dan Roberts Quality Manager Quality Performance With Pride 1 /4
1111 ENGINE SYSTEMS, INC.
175 Freight Road, Rocky Mount, NC 27804 12:06:28 p.m.
04-12-2024 Telephone: 252/977-2720 Fax: 252/446-1134 Report No.
10CFR21-0138 Rev. 0:
04/12/24 10CFR21 REPORTING OF DEFECTS AND NON-COMPLIANCE COMPONENT:
EMO Cylinder Liner Water Leak P/N 9318833 (component of power assembly P/N 40124898)
S/N 20D6294 SYSTEM:
Emergency Diesel Generator CONCLUSION:
Reportable in Accordance With 10CFR21 Prepared By: __ _b
__..__bvv-_* ________ _
vngineering Manager Date:
Reviewed By; ___ __.,.(kc....:.. _ _,_/Ur Date:
1../-1 2 - 2 '-I Quality Manager Quality Performance With Pride 2 /4
1111 12:06:41 p.m.
04-12-2024 3 /4 Report No.
10CFR21-0138 Record of Revisions Page:
1 of 1 REV DATE PAGE DESCRIPTION 0
04/12/24 Original Issue.
1111 12:06:50 p.m.
04-12-2024 4 /4 Report No.
Revision:
1 0CFR21-0138 0
Date:
04/12/24 Page:
1 of 1 Pursuant to 10 CFR 21.211d)(4), ESI is presenting the required information as follows:
(i) Name and address of the individual or individuals informing the Commission.
Dan Roberts John Kriesel Quality Manager Engineering Manager Engine Systems Inc.
Engine Systems Inc.
175 Freight Rd.
175 Freight Rd.
Rocky Mount, NC 27804 Rocky Mount, NC 27804 (ii) Identification of the basic component supplied within the United States which fails to comply or contains a defect.
EMO Cylinder Uner, PIN 9318833, SIN 20D6294 Component of Blade Power Pack Assembly, PIN 40124898, SIN 20L0603 (iii) Identification of the firm supplying the basic component which fails to comply or contains a defect.
Engine Systems Inc. (ES/)
(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect of failure to comply.
An EMO cylinder liner developed a jacket water leak following installation on an emergency diesel generator set. The teak occurred at a brazed joint and was detected after post-installation engine testing. Had the leak gone undetected, jacket water may have accumulated in the combustion chamber or airbox and potentially contaminated the engine's lubricating oil. Jacket water intrusion into any of these areas is undesirable and could lead to failure of the diesel engine and therefore failure of the emergency diesel generator set.
(v) The date on which the information of such defect or failure to comply was obtained.
February 22, 2024 (vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.
The extent of condition is this single cylinder liner, PIN 9318833, SIN 20D6294 used in the power assembly shown below.
Customer Customer ES/Sales Part Number Serial Number ES/ C-of-C PO Order Ordered Date Constellation -
703, release 3021545 40124898 20L0603 April 1, 2021 Fitzpatrick 13498 (Blade Power Pack)
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
For Fitzpatrick:
No action required; the power assembly has been returned to ES/ for replacement.
For ES/:
ES/ will revise the dedication package to include additional verifications to prevent reoccurrence.
The revision will be implemented within 30 days.
(viii) Any advice related to the potential defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.