IR 05000333/2024010

From kanterella
Jump to navigation Jump to search
Commercial Grade Dedication Inspection Report 05000333/2024010
ML24190A104
Person / Time
Site: FitzPatrick 
Issue date: 07/08/2024
From: Glenn Dentel
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024010
Download: ML24190A104 (1)


Text

July 8, 2024

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - COMMERCIAL GRADE DEDICATION INSPECTION REPORT 05000333/2024010

Dear David Rhoades:

On June 27, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at James A. FitzPatrick Nuclear Power Plant and discussed the results of this inspection with Mohamed Khan, Maintenance Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket No. 05000333 License No. DPR-59

Enclosure:

As stated

Inspection Report

Docket Number:

05000333

License Number:

DPR-59

Report Number:

05000333/2024010

Enterprise Identifier: I-2024-010-0028

Licensee:

Constellation Nuclear

Facility:

James A. FitzPatrick Nuclear Power Plant

Location:

Oswego, NY

Inspection Dates:

June 10, 2024 to June 27, 2024

Inspectors:

J. Ayala, Senior Reactor Inspector

M. Patel, Senior Operations Engineer

A. Turilin, Reactor Inspector

Approved By:

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Commercial Grade Dedication Inspection at James A. FitzPatrick Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.03 - Commercial Grade Dedication

The inspectors reviewed the implementation of the licensees processes for dedicating commercial grade items/services as basic components and/or for procuring safety-related structures, systems, and components for the following samples:

Commercial Grade Dedication===

(1) Circuit Board Assembly for the Reactor Core Isolation Cooling system Turbine Ramp Generator/Signal Governor (Purchase Order (PO) #00804833, Catalogue Identification (CID) #0001807146, Commercial Grade (CG))
(2) Capacitor for the Low Pressure Coolant Injection system Inverter Board (PO
  1. 00285549, CID #0001831823, CG)
(3) Damper Motor for the Control Room Heating, Ventilation, and Air Conditioning system (PO #00148574, CID #00J0491257, CG)
(4) Voltage Motor Operated Potentiometer Module for the Emergency Diesel Generator B (PO #00706302, CID #0000S13815, CG)
(5) Capacitor for the 125 VDC Station Battery Charger (PO #00668422, CID
  1. 0000S20886, CG)
(6) Average Power Range Monitoring system Control Relay (PO #00807762, CID
  1. 00J0660084, CG)
(7) Lube Oil Filter Inlet Pressure Indicator Gauge for the Emergency Diesel Generator D (PO #01389362, CID #0000S27784, CG)
(8) Diaphragm for the Eastside Scram Discharge Volume Outboard Drain Isolation Valve Operator (PO #00664786, CID #00J0261033, CG)
(9) Gasket for the High Pressure Coolant Injection system Pump Drive Turbine (PO
  1. 00724940, CID #00J0350166, CG)
(10) Lubricant for the Emergency Diesel Generator D Diesel Engine (PO #01398105, CID
  1. 00J0371080, CG)
(11) Spring for the Automatic Depressurization system Main Stream Line A Safety Relief Valve (PO #01331333, CID #0004515725, CG)
(12) Automatic Depressurization system Main Stream Line A Safety Relief Valve (PO
  1. 0043537, CID #0004542163, CG)
(13) Switch Used in the Control Circuit of the GE 4 kV Magneblast Circuit Breaker (PO
  1. 00711082, CID #0000S10253, safety-related)
(14) Remote Shutdown Isolation Switch (PO #00645206, CID #0001785048, safety-related)
(15) Board for the 400 VDC Uninterruptible Power Supply (PO #01405372, CID
  1. 0032081174, safety-related)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 27, 2024, the inspectors presented the Commercial Grade Dedication Inspection results to Mohamed Khan, Maintenance Director, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.03 Corrective Action

Documents

4535507

4692122

4746838

Corrective Action

Documents

Resulting from

Inspection

04783229

Engineering

Evaluations

207465

Gauge, Pressure, 0-60 psi, 1-1/2" IN, 1/4" NPT IN, Lower,

Clycerin

248537

Gasket, Flange, Style CG-1C, Flexitallic, 3/4", 150 LB.,

Nuclear Grade Flexicarb & SS 304, Round

263807

Spring, Pilot, Pressure Adjust, for Safety Relief Valve

08/12/2021

271132

Valve, Relief, Safety, Carbon Steel ASME SA105 Body,

ASME Section III, CL 1, 6" X 10"

05/25/2022

283366

Lubricant, Grease, Electrical, Insulating, Dupont Molykote

4, 5.3 OZ

86392

Potentiometer, Motor Operated Control, 250 Ohm, Basler

2/02/2011

96862

Relay, Type SF Relay, 20 VDC Coil, DPDT, Socket, 2A @

VDC Resistive

09/13/2011

CG-02-010

Capacitor, Aluminum Electrolytic, 12000 uF, 150 VDC,

.013ESR, for Battery Charger Model 3MD

10/10/2002

CG-91-021

Diaphragm, 50-Rotochamber Actuator

Revision 0

Miscellaneous

EPRI 1001257

Capacitor Performance Monitoring Project

December

2000

EPRI TR-112175

Capacitor Application and Maintenance Guide

August 1999

P319-0047

(PP09)

3-Phase Magnetic Amplifier Controlled CP Battery

Charger

Revision 008

QDR 12.01

Qualification Documentation Report for Reliance Electrical

Panels

Revision 3

Procedures

EN-MP-112

Shelf Life Program

Revision 5

PES-S-002

Shelf Life

Revision 10

SM-AA-102

Warehouse Operations

Revision 33

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SM-AA-300

Procurement Engineering Support Activities

Revision 10

SM-AA-300-1001

Procurement Engineering Process and Responsibilities

Revision 25

SM-AA-3019

Parts Quality Initiative

Revision 13

Work Orders

04694369

Replace 93EDG-D(ENG) Power Assemblies

01/29/2024

04705558

EC 620602 - Install 3 Stage Primary Relief Valves 02RV-

71H

09/17/2018

04827576-01

Swap Breaker Installed in 71-10110

09/20/20

04898513

HPCI Major Insp per MP-023.01

10/4/2020

04977041-01

PM Replacement of 93POT-1B

10/10/2023

04977041-02

Bench Test New 93POT-1B

05/08/2023

05063613-02

Bench Test RCIC Woodward Controls for RCIC Room

08/13/2021

05195278

Troubleshoot 07APRM-80E as Potential Cause of 'A' Half-

Scram

10/22/2021

23427

RFOUT-Outage Prep-Perform Receipt Inspections of SRV

Pilot

09/24/2022

5336073

Replace 93PI-7D EDG 'D' Lube Oil Filter Inlet Pressure

Indicator

01/29/2024

80403440

PM-Rebuild Valve/Operator Elastomers/Repair and

Diagnostic 03AOV-39 Valve

09/24/2018

80448327

Bench Test Replacement Switch :66IS-1RNVH14

08/06/2018

2721226

PM - Replace 71BC-1B Filter Capacitors

04/10/2019