Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023006)
ML24053A355
Person / Time
Site: FitzPatrick 
Issue date: 02/28/2024
From: Erin Carfang
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023006
Download: ML24053A355 (1)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2023006)

Dear David Rhoades:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of James A. FitzPatrick Nuclear Power Plant (FitzPatrick), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP)

Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at FitzPatrick.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5120 with any questions you have regarding this letter.

Sincerely, Erin E. Carfang, Chief Projects Branch 1 Division of Operating Reactor Safety

Docket No. 05000333 License No. DPR-59

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

Erin E.

Carfang Digitally signed by Erin E.

Carfang Date: 2024.02.28 09:26:46 -05'00'

ML24053A355 x

SUNSI Review

x Non-Sensitive Sensitive

x Publicly Available

Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME EEve ECarfang

DATE 2/22/2024 2/22/2024

Site Inspection Activity Plan FitzPatrick 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count RP-71124.03 Airborne

1 3/4/2024 4/30/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

3/11/2024 3/15/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Access Control, Protective Strategy, TSR, SPR

1 4/15/2024 4/19/2024 IP 71130.02 000734 Access Control

4/15/2024 4/19/2024 IP 71130.05 000737 Protective Strategy Evaluation

4/15/2024 4/19/2024 IP 71130.09 001656 Security Plan Changes

4/15/2024 4/19/2024 IP 71130.14 000743 Review of Power Reactor Target Sets

4/15/2024 4/19/2024 IP 71151 001338 Performance Indicator Verification Fitz Requal Insp with P/F Results

1 5/6/2024 5/10/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance

5/6/2024 5/10/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP - 71124.04 Dosimetry

1 4/29/2024 5/31/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

5/6/2024 5/10/2024 IP 71124.04 000728 Occupational Dose Assessment Commercial Grade Dedication - Fitzpatrick

1 6/10/2024 6/14/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

6/24/2024 6/28/2024 IP 71111.21N.03 001808 Commercial Grade Dedication EP Program Inspection - Fitzpatrick

1 8/5/2024 8/9/2024 IP 71114.02 000717 Alert and Notification System Testing

8/5/2024 8/9/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

8/5/2024 8/9/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

8/5/2024 8/9/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness

8/5/2024 8/9/2024 IP 71151 001397 Performance Indicator Verification Material Control and Accounting-Fitzpatrick

1 8/26/2024 8/30/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

RP - 71124.01 Rad Hazards

1 9/9/2024 9/13/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Inservice Inspection - Fitzpatrick

1 9/16/2024 9/20/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP - 71124.06 RETS and 71151 PIV

Prepared on 1/31/2024 3:38:12 PM 1 of 2

Site Inspection Activity Plan

10/7/2024 10/11/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 2025 Fitz Initial License Examination

1 1/20/2025 1/24/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2/17/2025 2/21/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Access Authorization, FFD - FP

1 2/3/2025 2/7/2025 IP 71130.01 000733 Access Authorization

2/3/2025 2/7/2025 IP 71130.08 000740 Fitness-For-Duty Program

2/10/2025 2/14/2025 IP 71130.01 000733 Access Authorization

2/10/2025 2/14/2025 IP 71130.08 000740 Fitness-For-Duty Program RP - 71124.01 Rad Hazards

1 3/10/2025 3/14/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Age Related Degradation Inspection - Fitzpatrick

1 4/28/2025 5/2/2025 IP 71111.21N.04 001832 Age-Related Degradation

5/12/2025 5/16/2025 IP 71111.21N.04 001832 Age-Related Degradation RP - 71124.05 Instruments

1 5/5/2025 5/9/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation RP - 71124.07 REMP

1 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program PI&R Biennial Team Inspection - Fitzpatrick

1 7/14/2025 7/18/2025 IP 71152B 000747 Problem Identification and Resolution

7/28/2025 8/1/2025 IP 71152B 000747 Problem Identification and Resolution Access Control, Maintenance, Sec Trng, SPR, PIs - FP

1 9/15/2025 9/19/2025 IP 71130.02 000734 Access Control

9/15/2025 9/19/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

9/15/2025 9/19/2025 IP 71130.07 000739 Security Training

9/15/2025 9/19/2025 IP 71130.09 001656 Security Plan Changes

9/15/2025 9/19/2025 IP 71151 001338 Performance Indicator Verification RP - 71124.08 Rad Transportation PIV

1 10/20/2025 10/24/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Cyber Security - Fitzpatrick

1 10/20/2025 10/24/2025 IP 71130.10 000741 Cybersecurity Prepared on 1/31/2024 3:38:12 PM 2 of 2