Category:INSPECTION REPORT
MONTHYEARIR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19970021997-05-23023 May 1997 Insp Repts 50-334/97-02 & 50-412/97-02 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141E9451997-04-27027 April 1997 Integrated Insp Repts 50-334/97-04 & 50-412/97-04 on 970427-0607.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20137Q6851997-04-0707 April 1997 Insp Repts 50-334/97-01 & 50-412/97-01 on 970209-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20135B7781997-02-21021 February 1997 Insp Repts 50-334/96-10 & 50-412/96-10 on 961222-970208. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint, & Plant Support IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000334/19960091997-01-0202 January 1997 Insp Repts 50-334/96-09 & 50-412/96-09 on 961117-1221.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19960111996-12-23023 December 1996 Insp Repts 50-334/96-11 & 50-412/96-11 on 961209-12.No Violations Noted.Major Areas Inspected:Authorization Program & Administration Organization ML20135C4081996-11-16016 November 1996 Insp Repts 50-334/96-08 & 50-412/96-08 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000334/19960071996-11-0808 November 1996 Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20058Q0221993-12-15015 December 1993 AIT IR 50-412/93-81 on 931109-19.No Violations Noted. Major Areas Inspected:Detailed Review of Circumstances Surrounding Failure of Both Emergency Diesel Generator Load Sequencers During Routine Surveillance Testing IR 05000334/19930261993-12-0808 December 1993 Insp Repts 50-334/93-26 & 50-412/93-28 on 931026-1127. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000412/19930251993-11-29029 November 1993 Insp Rept 50-412/93-25 on 931018-22.Violations Noted. Major Areas Inspected:Adequacy of Repair & Maintenance of Safety Class 1 Valves,Including follow-up of Auxiliary Feedwater (AFW) Water Hammer Issue IR 05000334/19930251993-11-23023 November 1993 Insp Repts 50-334/93-25 & 50-412/93-26 on 931018-22.No Violations Noted.Major Areas Inspected:Organization & Staffing Levels,Staff Qualifications & Training,External & Internal Exposure Control & Radiological Surveys IR 05000334/19930221993-10-29029 October 1993 Insp Repts 50-334/93-22 & 50-412/93-23 on 930928-1025. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000334/19930801993-10-27027 October 1993 Insp Repts 50-334/93-80 & 50-412/93-80 on 930830-0903.No Violations Noted.Major Areas Inspected:Adequacy of Programs, Procedures,Training,Equipment & Sys for Implementing SBO IR 05000412/19930211993-10-22022 October 1993 Insp Rept 50-412/93-21 on 930830-0903 & 1004-08.No Violation Noted.Major Areas Inspected:Isi Program,Scope of ISI Work, Eddy Current Exam Program for SG Tubes,Erosion/Corrosion Monitoring Program for High Energy Sys & SG Leakage Program IR 05000334/19930201993-10-21021 October 1993 Insp Repts 50-334/93-20 & 50-412/93-20 on 930907-10.No Violations of Regulatory Requirements Noted.Major Areas Inspected:Bvps Ep,Program Changes,Emergency Facilities, ERO Training & Staff Knowledge ML20057E8331993-09-30030 September 1993 Insp Repts 50-334/93-21 & 50-412/93-22 on 930824-0927. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000334/19930161993-09-0808 September 1993 Insp Repts 50-334/93-16 & 50-412/93-17 on Stated Date. Violations Noted,Not Cited.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000334/19930181993-08-30030 August 1993 Insp Repts 50-334/93-18 & 50-412/93-19 on 930809-13.No Safety Concerns or Violations Noted.Major Areas Inspected: Mgt Support,Audits & Security Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids IR 05000334/19930151993-08-0606 August 1993 Insp Repts 50-334/93-15 & 50-412/93-16 on 930726-30.No Violations Noted.Major Areas Inspected:Transportation of Radioactive Matls,Radwaste Processing,Staffing Levels,Staff Qualifications,Training & Quality Assurance IR 05000334/19920301993-02-0909 February 1993 Insp Repts 50-334/92-30 & 50-412/92-29 on 921222-930125.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness & Security IR 05000334/19920281993-02-0202 February 1993 Insp Repts 50-334/92-28 & 50-412/92-27 on 921215-18.No Violations Noted.Major Areas Inspected:Design Changes,Mods, TER Process,Lers & Status of Previously Identified Open Items IR 05000334/19920261992-12-31031 December 1992 Insp Repts 50-334/92-26 & 50-412/92-26 on 921119-1221.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support IR 05000334/19920241992-12-0101 December 1992 Insp Repts 50-334/92-24 & 50-412/92-24 on 921013-1118.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support 1999-09-07
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19970021997-05-23023 May 1997 Insp Repts 50-334/97-02 & 50-412/97-02 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141E9451997-04-27027 April 1997 Integrated Insp Repts 50-334/97-04 & 50-412/97-04 on 970427-0607.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20137Q6851997-04-0707 April 1997 Insp Repts 50-334/97-01 & 50-412/97-01 on 970209-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20135B7781997-02-21021 February 1997 Insp Repts 50-334/96-10 & 50-412/96-10 on 961222-970208. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint, & Plant Support IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000334/19960091997-01-0202 January 1997 Insp Repts 50-334/96-09 & 50-412/96-09 on 961117-1221.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19960111996-12-23023 December 1996 Insp Repts 50-334/96-11 & 50-412/96-11 on 961209-12.No Violations Noted.Major Areas Inspected:Authorization Program & Administration Organization ML20135C4081996-11-16016 November 1996 Insp Repts 50-334/96-08 & 50-412/96-08 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000334/19960071996-11-0808 November 1996 Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20058Q0221993-12-15015 December 1993 AIT IR 50-412/93-81 on 931109-19.No Violations Noted. Major Areas Inspected:Detailed Review of Circumstances Surrounding Failure of Both Emergency Diesel Generator Load Sequencers During Routine Surveillance Testing IR 05000334/19930261993-12-0808 December 1993 Insp Repts 50-334/93-26 & 50-412/93-28 on 931026-1127. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000412/19930251993-11-29029 November 1993 Insp Rept 50-412/93-25 on 931018-22.Violations Noted. Major Areas Inspected:Adequacy of Repair & Maintenance of Safety Class 1 Valves,Including follow-up of Auxiliary Feedwater (AFW) Water Hammer Issue IR 05000334/19930251993-11-23023 November 1993 Insp Repts 50-334/93-25 & 50-412/93-26 on 931018-22.No Violations Noted.Major Areas Inspected:Organization & Staffing Levels,Staff Qualifications & Training,External & Internal Exposure Control & Radiological Surveys IR 05000334/19930221993-10-29029 October 1993 Insp Repts 50-334/93-22 & 50-412/93-23 on 930928-1025. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000334/19930801993-10-27027 October 1993 Insp Repts 50-334/93-80 & 50-412/93-80 on 930830-0903.No Violations Noted.Major Areas Inspected:Adequacy of Programs, Procedures,Training,Equipment & Sys for Implementing SBO IR 05000412/19930211993-10-22022 October 1993 Insp Rept 50-412/93-21 on 930830-0903 & 1004-08.No Violation Noted.Major Areas Inspected:Isi Program,Scope of ISI Work, Eddy Current Exam Program for SG Tubes,Erosion/Corrosion Monitoring Program for High Energy Sys & SG Leakage Program IR 05000334/19930201993-10-21021 October 1993 Insp Repts 50-334/93-20 & 50-412/93-20 on 930907-10.No Violations of Regulatory Requirements Noted.Major Areas Inspected:Bvps Ep,Program Changes,Emergency Facilities, ERO Training & Staff Knowledge ML20057E8331993-09-30030 September 1993 Insp Repts 50-334/93-21 & 50-412/93-22 on 930824-0927. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000334/19930161993-09-0808 September 1993 Insp Repts 50-334/93-16 & 50-412/93-17 on Stated Date. Violations Noted,Not Cited.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000334/19930181993-08-30030 August 1993 Insp Repts 50-334/93-18 & 50-412/93-19 on 930809-13.No Safety Concerns or Violations Noted.Major Areas Inspected: Mgt Support,Audits & Security Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids IR 05000334/19930151993-08-0606 August 1993 Insp Repts 50-334/93-15 & 50-412/93-16 on 930726-30.No Violations Noted.Major Areas Inspected:Transportation of Radioactive Matls,Radwaste Processing,Staffing Levels,Staff Qualifications,Training & Quality Assurance IR 05000334/19920301993-02-0909 February 1993 Insp Repts 50-334/92-30 & 50-412/92-29 on 921222-930125.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness & Security IR 05000334/19920281993-02-0202 February 1993 Insp Repts 50-334/92-28 & 50-412/92-27 on 921215-18.No Violations Noted.Major Areas Inspected:Design Changes,Mods, TER Process,Lers & Status of Previously Identified Open Items IR 05000334/19920261992-12-31031 December 1992 Insp Repts 50-334/92-26 & 50-412/92-26 on 921119-1221.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support IR 05000334/19920241992-12-0101 December 1992 Insp Repts 50-334/92-24 & 50-412/92-24 on 921013-1118.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support 1999-09-07
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19970021997-05-23023 May 1997 Insp Repts 50-334/97-02 & 50-412/97-02 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141E9451997-04-27027 April 1997 Integrated Insp Repts 50-334/97-04 & 50-412/97-04 on 970427-0607.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20137Q6851997-04-0707 April 1997 Insp Repts 50-334/97-01 & 50-412/97-01 on 970209-0315.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20135B7781997-02-21021 February 1997 Insp Repts 50-334/96-10 & 50-412/96-10 on 961222-970208. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint, & Plant Support IR 05000344/19960051997-02-13013 February 1997 Correction to Insp Repts 50-344/96-05 & 72-0017/96-02. Requests That Encl Pages Be Added as Last Two Pages of Listed Insp Rept IR 05000334/19960091997-01-0202 January 1997 Insp Repts 50-334/96-09 & 50-412/96-09 on 961117-1221.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000334/19960111996-12-23023 December 1996 Insp Repts 50-334/96-11 & 50-412/96-11 on 961209-12.No Violations Noted.Major Areas Inspected:Authorization Program & Administration Organization ML20135C4081996-11-16016 November 1996 Insp Repts 50-334/96-08 & 50-412/96-08 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000334/19960071996-11-0808 November 1996 Insp Repts 50-334/96-07 & 50-412/96-07 on 960813-0928. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20058Q0221993-12-15015 December 1993 AIT IR 50-412/93-81 on 931109-19.No Violations Noted. Major Areas Inspected:Detailed Review of Circumstances Surrounding Failure of Both Emergency Diesel Generator Load Sequencers During Routine Surveillance Testing IR 05000334/19930261993-12-0808 December 1993 Insp Repts 50-334/93-26 & 50-412/93-28 on 931026-1127. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000412/19930251993-11-29029 November 1993 Insp Rept 50-412/93-25 on 931018-22.Violations Noted. Major Areas Inspected:Adequacy of Repair & Maintenance of Safety Class 1 Valves,Including follow-up of Auxiliary Feedwater (AFW) Water Hammer Issue IR 05000334/19930251993-11-23023 November 1993 Insp Repts 50-334/93-25 & 50-412/93-26 on 931018-22.No Violations Noted.Major Areas Inspected:Organization & Staffing Levels,Staff Qualifications & Training,External & Internal Exposure Control & Radiological Surveys IR 05000334/19930221993-10-29029 October 1993 Insp Repts 50-334/93-22 & 50-412/93-23 on 930928-1025. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000334/19930801993-10-27027 October 1993 Insp Repts 50-334/93-80 & 50-412/93-80 on 930830-0903.No Violations Noted.Major Areas Inspected:Adequacy of Programs, Procedures,Training,Equipment & Sys for Implementing SBO IR 05000412/19930211993-10-22022 October 1993 Insp Rept 50-412/93-21 on 930830-0903 & 1004-08.No Violation Noted.Major Areas Inspected:Isi Program,Scope of ISI Work, Eddy Current Exam Program for SG Tubes,Erosion/Corrosion Monitoring Program for High Energy Sys & SG Leakage Program IR 05000334/19930201993-10-21021 October 1993 Insp Repts 50-334/93-20 & 50-412/93-20 on 930907-10.No Violations of Regulatory Requirements Noted.Major Areas Inspected:Bvps Ep,Program Changes,Emergency Facilities, ERO Training & Staff Knowledge ML20057E8331993-09-30030 September 1993 Insp Repts 50-334/93-21 & 50-412/93-22 on 930824-0927. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000334/19930161993-09-0808 September 1993 Insp Repts 50-334/93-16 & 50-412/93-17 on Stated Date. Violations Noted,Not Cited.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering,Plant Support & Safety Assessment/Quality Verification IR 05000334/19930181993-08-30030 August 1993 Insp Repts 50-334/93-18 & 50-412/93-19 on 930809-13.No Safety Concerns or Violations Noted.Major Areas Inspected: Mgt Support,Audits & Security Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids IR 05000334/19930151993-08-0606 August 1993 Insp Repts 50-334/93-15 & 50-412/93-16 on 930726-30.No Violations Noted.Major Areas Inspected:Transportation of Radioactive Matls,Radwaste Processing,Staffing Levels,Staff Qualifications,Training & Quality Assurance IR 05000334/19920301993-02-0909 February 1993 Insp Repts 50-334/92-30 & 50-412/92-29 on 921222-930125.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness & Security IR 05000334/19920281993-02-0202 February 1993 Insp Repts 50-334/92-28 & 50-412/92-27 on 921215-18.No Violations Noted.Major Areas Inspected:Design Changes,Mods, TER Process,Lers & Status of Previously Identified Open Items IR 05000334/19920261992-12-31031 December 1992 Insp Repts 50-334/92-26 & 50-412/92-26 on 921119-1221.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support IR 05000334/19920241992-12-0101 December 1992 Insp Repts 50-334/92-24 & 50-412/92-24 on 921013-1118.No Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support 1999-09-07
[Table view] Category:UTILITY
MONTHYEARIR 05000334/19900191990-10-0101 October 1990 Insp Repts 50-334/90-19 & 50-412/90-19 on 900917-21.No Violations Noted.Major Areas Inspected:Status of Previously Identified Items,Organization & Training,Internal & External Exposure Controls & ALARA IR 05000334/19900121990-07-24024 July 1990 Insp Repts 50-334/90-12 & 50-412/90-12 on 900505-0622. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Protection,Surveillance & Maint,Emergency Preparedness,Security & Engineering & Technical Support IR 05000334/19900151990-07-13013 July 1990 Insp Repts 50-334/90-15 & 50-412/90-15 on 900611-15.No Violations Noted.Major Areas Inspected:Implementing QA Program in Conformance W/Tech Specs,Regulatory Requirements, Commitments & Industry Guides & Stds IR 05000334/19900161990-07-10010 July 1990 Radiological Controls Insp Repts 50-334/90-16 & 50-412/90-16 on 900604-08.No Violations Noted.Weaknesses Noted.Improvement Noted in Quality of Audits & Appraisals. Major Areas Inspected:Status of Previously Identified Items IR 05000334/19890131989-09-28028 September 1989 Insp Repts 50-334/89-13 & 50-412/89-14 on 890708-0831.No Violations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Plant Housekeeping & Fire Protection & Fitness for Duty IR 05000334/19890151989-09-22022 September 1989 Insp Rept 50-334/89-15 on 890905-08.No Violations Noted. Major Areas Inspected:Use of Hafa Intl Developed Instrumented Insp Technique as Alternative to Hydrostatic Test Requirements of ASME Section XI IR 05000334/19890141989-09-0808 September 1989 Insp Repts 50-334/89-14 & 50-412/89-15 on 890801-03.No Violations Noted.Major Areas Inspected:Partial Participation in Annual Emergency Preparedness Exercise on 890802 IR 05000334/19890171989-08-24024 August 1989 Insp Repts 50-334/89-17 & 50-412/89-17 on 890731-0810.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering Support Program,Including Staffing,Qa, Training,Mgt Support & Communications IR 05000334/19890121989-08-0909 August 1989 Insp Repts 50-334/89-12 & 50-412/89-13 on 890523-0707. Violations Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Plant Housekeeping & Fire Protection,Surveillance Testing & Maint IR 05000334/19890081989-07-20020 July 1989 Insp Repts 50-334/89-08 & 50-412/89-08 on 890501-05.No Violations Noted.Major Areas Inspected:Evaluation of Effectiveness of Licensed Operator Training Program & Discussions W/Cognizant Training Personnel IR 05000334/19890111989-07-12012 July 1989 Safety Insp Repts 50-334/89-11 & 50-412/89-12 on 890531- 0602.No Violations Noted.Major Areas Inspected:Emergency Preparedness Program Including Review of Previously Identified Insp Findings & Changes to Program IR 05000334/19890101989-06-28028 June 1989 Insp Repts 50-334/89-10 & 50-412/89-11 on 890515-19.No Violations Noted.Major Areas Inspected:Engineering & Maint for Limit & Torque Switch Settings in motor-operated Valves & Corrective Actions from Bulletin 85-003 IR 05000412/19890101989-06-0909 June 1989 Insp Rept 50-412/89-10 on 890515-19.No Violations Noted. Major Areas Inspected:Inservice Insp Activities,Including Observations of NDE in Progress,Implementing NDE Procedures & Review of Inservice Insp Data IR 05000334/19890091989-06-0808 June 1989 Physical Security Insp Repts 50-334/89-09 & 50-412/89-09 on 890508-11.No Violation Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audit,Protected & Vital Area Physical Barriers & Detection & Assessment Aids IR 05000334/19890051989-06-0606 June 1989 Insp Repts 50-334/89-05 & 50-412/89-05 on 890401-0522.No Violations or Unresolved Items Noted.Major Areas Inspected: Plant Operations,Security,Radiological Controls,Plant Housekeeping & Fire Protection & LERs ML20247K9501989-05-15015 May 1989 Insp Repts 50-334/89-07 & 50-412/89-07 on 890417-21.No Deficiencies Noted.Major Areas Inspected:Licensee Activities in Response to NRC Info Notice 86-053 Re Heat Shrink Tubing IR 05000334/19890061989-05-12012 May 1989 Radiological Controls Insp Repts 50-334/89-06 & 50-412/89-06 on 890410-14.No Violations Identified.Major Areas Inspected: Organization & Staffing,Training & Qualifications, Procedures & Internal & External Exposure Controls IR 05000334/19890041989-04-19019 April 1989 Insp Repts 50-334/89-04 & 50-412/89-04 on 890216-0331. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Plant Operations,Security, Radiological Controls,Plant Housekeeping & Fire Protection IR 05000334/19890011989-03-0202 March 1989 Insp Repts 50-334/89-01 & 50-412/89-01 on 890101-0215.No Violations or Unresolved Items Identified.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Security,Radiological Controls & Fire Protection IR 05000334/19880271988-11-28028 November 1988 Insp Repts 50-334/88-27 & 50-412/88-21 on 881017-21.No Violations Noted.Major Areas Inspected:Licensee Radioactive Effluent Controls,Radwaste & Transportation & Radiological Environ Monitoring Programs IR 05000334/19880251988-10-31031 October 1988 Insp Repts 50-334/88-25 & 50-412/88-19 on 880901-30.No Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Plant Operations,Security,Radiological Controls,Plant Housekeeping & Fire Protection & Maint ML20154F4151988-09-0101 September 1988 Environ Qualification Enforcement Conference Rept on 880812. Major Areas Discussed:Concerns About Environ Qualification Continental Cable & Containment high-range Radiation Monitors & Wiring Inside Limitorque motor-operated Valves IR 05000334/19880221988-08-12012 August 1988 Insp Repts 50-334/88-22 & 50-412/88-16 on 880601-0715. Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Security & Physical Protection,Radiological Controls & Fire Protection IR 05000334/19880151988-07-14014 July 1988 Insp Repts 50-334/88-15 & 50-412/88-10 on 880606-10.No Violations or Deviations Noted.Major Areas Inspected: Corporate Engineering Support Program Including Organization & Staffing,Qa,Training & Mgt Support & Communications IR 05000334/19880211988-07-14014 July 1988 Insp Rept 50-334/88-21 on 880509-13.Violations Noted.Major Areas Inspected:Licensee Corrective Actions on Concerns Identified in Equipment Qualification Insp 50-334/86-12 Conducted in June 1986 IR 05000334/19880191988-07-0707 July 1988 Insp Repts 50-334/88-19 & 50-412/88-15 on 880516-20.No Violations Noted.Major Areas Inspected:Radioactive Gaseous & Liquid Effluent Controls Program Including Radioactive Discharges & Radiation Monitoring Sys Calibrs & Tests IR 05000334/19880181988-06-20020 June 1988 Insp Repts 50-334/88-18 & 50-412/88-14 on 880509-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Organization & Staffing,Audits,Alara, External & Internal Exposure Controls & Startup Testing IR 05000334/19880171988-06-20020 June 1988 Resident Insp Repts 50-334/88-17 & 50-412/88-13 on 8880501-31.No Violations Noted.Major Areas Inspected:Plant Operations,Physical Security,Radiological Controls,Plant Housekeeping & Fire Protection,Surveillance Testing & Maint IR 05000334/19880141988-06-0707 June 1988 Insp Repts 50-334/88-14 & 50-412/88-09 on 880425-29.No Violations Noted.Major Areas Inspected:Unresolved Items,Plan & Implementing Procedures,Organization,Program Audit,Records & Repts,Testing & Maint IR 05000334/19880201988-06-0606 June 1988 Insp Repts 50-334/88-20 & 50-412/88-12 on 880509-13.No Violations Noted.Major Areas Inspected:Actions on Fire Protection Program Activities IR 05000334/19880101988-05-25025 May 1988 Insp Rept 50-334/88-10 on 880222-26.No Violations or Unresolved Items Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Configuration Mgt, Inadequate Core Cooling Sys Installation & Startup Testing IR 05000334/19880131988-05-16016 May 1988 Insp Repts 50-334/88-13 & 50-412/88-08 on 880411-15.No Violations Noted.Major Areas Inspected:Radiological Measurements Program Using NRC I Mobil Radiological Measurements Lab & Lab Assistance by DOE IR 05000334/19880161988-05-16016 May 1988 Insp Repts 50-334/88-16 & 50-412/88-11 on 880401-30.No Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operation,Physical Security, Radiological Controls,Plant Housekeeping & Fire Protection IR 05000334/19880081988-05-0404 May 1988 Insp Rept 50-334/88-08 on 880321-0401.Violations Noted.Major Areas Inspected:Reliability & Availability of Ac & Dc Power Sys,Diesel Generators,Eccs & Auxiliary Feedwater Sys IR 05000334/19880111988-04-28028 April 1988 Insp Repts 50-334/88-11 & 50-412/88-07 on 880216-0331.No Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Physical Security, Radiological Controls & Plant Housekeeping ML20151N5061988-04-13013 April 1988 Insp Rept 50-334/88-02 on 880201-05.Deviation Noted.Major Areas Inspected:Licensee Conformance to NRC Approved Procedure Generation Package Re Development & Implementation of Emergency Operating Procedures ML20151G5721988-04-0404 April 1988 Insp Repts 50-334/88-09 & 50-412/88-05 on 880222-26. Violations Noted.Major Areas Inspected:Licensee Solid Radwaste & Transportation Program Including Mgt Control, Shipments of Radioactive Matls,Training & Procedures IR 05000334/19880061988-03-24024 March 1988 Insp Rept 50-334/88-06 on 880208-12.No Violations or Deviations Noted.Major Areas Inspected:Steam Generator Eddy Current Insp,Water Chemistry Controls & Steam Generator Maint Radiological Controls IR 05000334/19880071988-03-10010 March 1988 Insp Repts 50-334/88-07 & 50-412/88-04 on 880208-12.No Violations or Deviations Noted.Major Areas Inspected: Licensee Compliance to NRC Order to Modify Unit 1 License Re Primary Coolant Sys Isolation Valves ML20150B5511988-03-0909 March 1988 Insp Rept 50-334/88-12 on 880303-08.Violation & Deviation Noted.Major Areas inspected:880303 Event Involving Inoperability of Two of Four hi-hi Containment Pressure Channels Due to Placement of Associated Bistables IR 05000334/19880011988-03-0909 March 1988 Insp Repts 50-334/88-01 & 50-412/88-01 on 880101-0215.No Violations Noted.Major Areas Inspected:Plant Operations, Maint Activities,Surveillance Testing,Diesel Generator Air Start Motor Lubrication Followup & Fitness for Duty Program ML20148C4121988-03-0404 March 1988 Insp Rept 50-412/88-03 on 880201-03.No Violations Noted.One Item Remained Unresolved at End of Insp.Major Areas Inspected:Total Loss of Control Room Annunciators on 880128 IR 05000334/19880041988-03-0303 March 1988 Insp Rept 50-334/88-04 on 880201-05.No Violations or Deviations Noted.Major Areas Inspected:Inservice Test Program Implementation of Pumps & Valves,Review of Procedures & Test Results & Test Witnessing ML20150B5401988-03-0202 March 1988 Insp Repts 50-334/88-03 & 50-412/88-02 on 880125-29. Violation Noted.Major Areas Inspected:Licensee Implementation of Radiological Controls Program During Unit 1 Outage,Diving Operations,Posting & Labeling & ALARA IR 05000334/19870191988-02-0808 February 1988 Insp Repts 50-334/87-19 & 50-412/87-69 on 871121-1231.No Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Physical Security, Radiological Controls & Fire Protection IR 05000334/19870171988-02-0303 February 1988 Partially Withheld Physical Security Insp Repts 50-334/87-17 & 50-412/87-66 on 871123-25 (Ref 10CFR73.21).No Noncompliance Noted.Major Areas Inspected:Plan & Implementing Procedures,Program Audits & Records & Repts IR 05000412/19870671987-12-28028 December 1987 Insp Rept 50-412/87-67 on 871119-25.No Violations Noted. Major Areas Inspected:Startup Test Program,Power Ascension Tests & Test Results ML20238C1151987-12-22022 December 1987 Insp Rept 50-334/87-16 on 871030-1203.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Physical Security,Radiological Controls,House Keeping & Fire Protection IR 05000412/19870681987-12-16016 December 1987 Insp Rept 50-412/87-68 on 871118-21.No Violation Noted. Major Areas Inspected:Root Cause & Safety Significance of 871117 Event & Review of Licensee Corrective Actions, Precursor Events & Potential for Similar Events IR 05000412/19870641987-12-11011 December 1987 Insp Rept 50-412/87-64 on 871010-1120.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Findings, Site Activities,Followup on Loss of Offsite Power & LER Review 1990-07-24
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-I-99-048, on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H1999-10-22022 October 1999 PNO-I-99-048:on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H ML20217N1491999-10-21021 October 1999 Notice of Violation from Insp on 990720-29.Violation Noted: as of July 1999,licensee Did Not Take Adequate Measures to Assure That Condition Adverse to Quality Involving Macro Biological Fouling of Service Water System Corrected IR 05000334/19990061999-10-0707 October 1999 Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Implementation IR 05000334/19990051999-09-30030 September 1999 Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20211Q5791999-09-0707 September 1999 Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000334/19990041999-08-24024 August 1999 Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-I-99-036, on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action1999-07-26026 July 1999 PNO-I-99-036:on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action PNO-I-99-033, on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault1999-07-19019 July 1999 PNO-I-99-033:on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault IR 05000334/19990031999-07-0707 July 1999 Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also Included IR 05000334/19990021999-05-21021 May 1999 Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000334/19990011999-04-22022 April 1999 Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp Specialists IR 05000412/19993011999-04-20020 April 1999 NRC Operator Licensing Exam Rept 50-412/99-301(including Completed & Graded Tests) for Tests Administered on 990322- 25.All Applicants Passed All Portions of Exams IR 05000334/19980111999-02-25025 February 1999 Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support ML20207E0761999-02-25025 February 1999 Notice of Violation from Insp on 981227-990206.Violation Noted:Licensee Failed to Promptly Identify & Correct Condition Adverse to Quality in That Investigation of Improperly Calibr Channnels Was Incompleted ML20206U3141999-02-0505 February 1999 Notice of Violation from Insp on 981116-1217.Violation Noted:On or Before 981217,design Control Measures Were Not Established to Ensure That Design Basis Closing Voltage Requirements of Circuit Breakers Were Met & Verified IR 05000334/19980091999-02-0505 February 1999 Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:Engineering IR 05000334/19980101999-01-13013 January 1999 Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was Excellent IR 05000334/19980061998-12-0404 December 1998 Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages ML20196H2951998-12-0202 December 1998 Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & Maint ML20196H3231998-12-0202 December 1998 Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000334/19980071998-11-0505 November 1998 Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response Organization IR 05000334/19980051998-10-23023 October 1998 Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20151Z3231998-09-15015 September 1998 Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20151Z3181998-09-15015 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:On 980808,inspectors Observed Maint Supervisor Manipulate Outboard Pump Packing Supply Valve & Perform Maint by Adjusting Outboard Packing Gland Nuts IR 05000334/19983011998-08-21021 August 1998 Exam Repts 50-334/98-301OL & 50-412/98-301OL Conducted During Wks of 980803-07 & 17-21.Exam Results:Four Unit 2 SRO Candidates Passed All Portions of Initial Exam.Good Performance Noted During Exam in Area of Crew Communication ML20236X8661998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:From 1988 to Sept 1997,licensee Routinely Vented Units 1 & 2 HHSI Piping Prior to Surveillance Testing W/O Proper Controls to Evaluate Amount of Gas.No Response Required IR 05000334/19980031998-08-0505 August 1998 Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20236X8631998-08-0505 August 1998 Notice of Violation from Insp on 980426-0627.Violation Noted:During Period of 980428-0608,licensee Failed to Implement Procedures as Evidenced by Listed Examples IR 05000334/19983001998-06-0303 June 1998 Exam Rept 50-334/98-300OL Conducted on 980420-24 & 0518.Exam Results:Three SRO Instant Candidates Passed All Portions of Initial License Exam ML20217F5881998-04-22022 April 1998 Notice of Violations from Insp on 980208-0321.Violations Noted:Conditions Adverse to Quality Were Not Promptly Corrected from Nov 1993 to March 1998,util Failed to Correct Known Unit 1 & 2 TS Deficiency in Timely Manner ML20217F5951998-04-22022 April 1998 Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20217B9771998-03-17017 March 1998 Notice of Violation from Insp on 971228-980207.Violations Noted:Repair Activities for 2-1 Station Battery Were Not Properly pre-planned & Implemented ML20217B9851998-03-17017 March 1998 Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also Inspected ML20216E8071998-03-0909 March 1998 Notice of Violation from Insp on 980105-0212.Violations Noted:On 971218 Dl Implemented Change to Temporary Operating Procedure to Allow Operators to Control Cooldown & Heatup Rate of Reactor Coolant by Mean Other than by Regulating ML20216E8191998-03-0909 March 1998 Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at Plant ML20202A9691998-02-0404 February 1998 Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency Preparedness IR 07100116/20120271998-02-0404 February 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:Licensee Had Not Tested 20 of 27 Direct Lines at Alternate EOF in Coraopolis,Pa PNO-I-98-002, on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.31998-02-0202 February 1998 PNO-I-98-002:on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.3 IR 05000334/19970101998-01-0909 January 1998 NRC Operator Licensing Exam Rept 50-334/97-10OL (Including Completed & Graded Tests) for Tests Administered on 971215- 18 ML20198K4761998-01-0606 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Between 1988 & 970912, Condition Adverse to Quality Existed at Unit 1 & 2,when Excessive Gas Accumulated in HHSI Pumps Suction Lines ML20199A1711997-12-31031 December 1997 EN-97-119:on 980106,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Violation Involving Failure to Take Adequate Action to Correct Significant Condition Adverse to Quality PNO-I-97-077, on 971216,Duquesne Light Co Initiated Unit 2 Reactor Shutdown in Accordance W/Ts 3.0.3.Licensee Plans to Address Unit 2 Design Deficiency for CR Emergency Air Cleanup & Pressurization,During Shutdown1997-12-17017 December 1997 PNO-I-97-077:on 971216,Duquesne Light Co Initiated Unit 2 Reactor Shutdown in Accordance W/Ts 3.0.3.Licensee Plans to Address Unit 2 Design Deficiency for CR Emergency Air Cleanup & Pressurization,During Shutdown ML20203D7421997-11-26026 November 1997 Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 07100005/20110151997-11-26026 November 1997 Notice of Violation from Insp on 971005-1115.Violations Noted:Workers,Found in Radiology Controlled Areas,Not Aware of Radiological Conditions in Work or Travel Areas IR 05000334/19970071997-11-0707 November 1997 Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198S6351997-11-0707 November 1997 Notice of Violation from Insp on 970830-1004.Violation Noted:Licensee Changed QA Program Resulting in Reduction in Commitments in QA Program Description Previously Accepted by NRC W/O Prior NRC Approval IR 05000334/19970061997-09-18018 September 1997 Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training Program ML20217P7731997-08-18018 August 1997 Notice of Violation from Insp on 970608-0719.Violation Noted:Previous Corrective Actions Inadequate in That on 970701,unplanned Engineered Safety Feature Actuation, Occurred During Troubleshooting Activities on Unit 1 IR 05000334/19970051997-08-18018 August 1997 Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20141G9971997-07-0303 July 1997 Notice of Violation from Insp on 970209-0426.Violation Noted:During EDG Surveillance Tests,Load Test Values Used Were Inadequate to Ensure That EDGs Achieved 2750 Kw Due to Inaccuracies in Kilowatt Meter Instrument Loop 1999-09-07
[Table view] |
Text
.
.
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Report N /85-20 Docket N Licensee: Duquesne Light Company One Oxford Center 301 Grant Street Pittsburgh, PA 15279 Facility Name: Beaver Valley Power Station, Unit 1 Location: Shippingport, Pennsylvania Dates: Sep mber 1 - 30, 1985 Inspector: - -
M M. Tr Moski, Senior Resident Inspector N
Date Approved by: _
-
M R. E. Trib5, Chief, Reactor Projects Section 3A
8[
Dhte Inspection Summary: Inspection No. 50-334/85-20 on September 1 - 30, 198 Areas Inspected: Routine inspections by the resident inspector (100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />) of licensee actions of previous inspection findings, plant operations, housekeeping, fire. protection, radiological controls, physical security, engineered safety fea-tures verification, reactor protection syst.em OTDT trip, ESF equipment maintenance and testing, component cooling water heat exchanger repairs, emergency preparedness drill, monthly operating reports, and review of licensee event report Results: Though no violation was issued, another example of a wrong security badge issue was identified by the licensee (Detail 3.c).
334 kk11k0
-
- . - . _
-
.
.
.
TABLE OF CONTENTS
.P_ ale Persons Contacted . ................. 1 Followup on Outstanding Items . . . . . . . . . . . . 1 Plant Operations . . . . . . . . . . . . . . . . . . . 2 General . . . . . . . . . . . . . . . . . . . . . 2 Operations ................... 3 Plant Security / Physical Protection ... ... . 5 Radiation Controls. . . . . . . . . . . . . . . . 7 Plant Housekeeping and Fire Protection. . . ... 7 Engineered Safety Features (ESF) Verificatio ... . 8 OTDT Trio ........ .. . . . . .... . . . 9 ESF Maintenance and Testing . . . . . . . . . . . . . 11 Main Steam Isolation Valves. . . . . . . . . . . 11 ' Turbine Driven Auxiliary Feedwater Pump . . .. 12 Component Cooling Water Heat Exchanger Repairs. . . . 13 Emergency Preparedness Drill . . . . . . . . . . .. 14 Monthly Operating Reports . . . . . . . . . . . . . . 15 10. Inoffice Review of Licensee Event Reports . . . ... 15 11. Exit Interview. . . .............. ... 15
i l
- _ _ - -
._ -
.
.
.
,
DETAILS Persons Contacted J. J. Carey, Vice President, Nuclear Group R. J. Druga, Manager, Technical Services
,
!
T. D. Jones, Gereral Manager, Nuclear Operations W. S. Lacey, Plant Manager J. D. Sieber, General Manager, Nuclear Services N. R. Tonet, General Manager, Nuclear Engr. & Constr. Unit The inspector also contacted other licensee employees and contractors during this' inspectio . Followup on Outstanding Items The NRC Outstanding Items (OI) List was reviewed with cognizant licensee per-sonnel. Items selected by the inspector were subsequently reviewed through discussions with licensee personnel, documentation reviews and field inspec-tion to determine whether licensee actions specified in the OI's had been satisfactorily complete The overall status of previously identified in-spection findings were reviewed, and planned and completed licensee actions were discussed for those items reported below:
(0 pen) Violation (85-18-04): Protected Area access granted to individual with wrong picture badge. A second example of this problem is discussed in Detail
.3.c of this repor (Closed) IFI (85-12-05)- Follow licensee actions to identify cause of spuri-ous OTDT alar This item is discussed in Detail 5 of this repor (Closed) Unresolved Item (85-16-04): Determine whether adequate safety review was conducted prior to RTD transmitter model changeout. This item is dis-cussed in Detail 5 of this inspection repor (0 pen) Unresolved Item (85-18-01): High steam pressure rate MSIV isolation
. requirements of TS Tables 3.3-3 and 4.3-2 are not consistent regarding surveillance testin This item is updated as discussed in Detail 6.a of this repor (Closed) Unresolved Item (84-12-05): Review CCR heat exchanger corrective actions. This item is closed out in Detail 7 of this repor (Closed) IFI (85-12-03): Determine failure mode of component cooling water heat exchanger tub This item is closed out in Detail 7 of this repor (Closed) IFI (85-12-07): Review solution to recurring steam generator level trips during transfer of feedwater control from bypass to main control valves during plant startups. Procedure changes associated with this problem are detailed in Onsite Safety Committee Meeting Minutes BV-OSC-30-8 These
_
- -. -
.
.
.
changes and the reasoning prompting them were discussed with various licensed operator Operating procedures now require that the primary side be stabil-ized with the main feedwater valves closed under manual control. Next, the steam generator levels are brought to a slightly higher than normal level via the bypass flow control valves. At this time, the main feedwater valves are placed in automatic control and the bypass flow control valves are manually bumped closed. The operators stated that this practice apparently worked well during the two reactor trip recoveries discussed in Detail 3.b of this repor This item is therefore close . Plant Operations General Inspection tours of the plant areas listed below were conducted during both day and night shifts with respect to Technical Specification (TS)
compliance, housekeeping and cleanliness, fire protection, radiation control, physical security and plant protection, operational and main-tenance administrative control Control. Room
--
Primary Auxiliary Building
--
Turbine Building
--
Service Building
--
Main Intake Structure
--
Main Steam Valve Room
--
Purge Duct Room
--
East / West Cable Vaults
--
Emergency Diesel Generator Rooms
--
Containment Building
--
Penetration Areas
--
Safeguards Areas
--
Various Switchgear Rooms / Cable Spreading Room
--
Protected Areas Acceptance criteria for the above areas included the following:
--
BVPS FSAR
--
Technical Specifications (TS)
--
BVPS Operating Manual (0M), Chapter 48, Conduct of Operations
--
OM 1.48.5, Section D, Jumpers and Lifted Leads
--
OM 1.48.6, Clearance Procedures
--
'OM 1.48.8, Records
--
OM 1.48.9, Rules of Practice
--
OM Chapter 55A, Periodic Checks, Operating Surveillance Tests
--
BVPS Maintenance Manual (MM), Chapter 1, Conduct of Maintenance
--
BVPS Radcon Manual (RCM)
--
10 CFR 50.54(k), Control Room Manning Requirements
--
BVPS Site / Station Administrative Procedures (SAP)
--
BVPS Physical Security Plan (PSP)
--
Inspector Judgement l
_ _ , _ , . - . . _ _ . . _ ,
. 1
1
.
l l
, Operations
-
l The. inspector toured the Control Room regularly to verify compliance with '
NRC. requirements and ' facility technical specifications (TS).
' Direct observations of instrumentation, recorder traces and control panels were made for items important to safety. Included in the reviews are the rod position indicators, nuclear instrumentation systems, radi- i ation monitors, containment pressure and temperature parameters, onsite/ 1 offsite. emergency power sources, availability of reactor protection sys-tems and proper alignment of' engineered safety feature systems. Where an abnormal condition existed (such as out-of-service equipment), ad-herence to. appropriate TS action statements was *ndependently verifie Also, various operation logs'and records, including completed surveil-
.
lance tests, equipment' clearance permits in progress, status board main-
.tenance and temporary operating procedures were reviewed on a sampling basis for compliance with technical specifications and those administra-tive controls listed in Paragraph 3 During the course of the inspection, discussions were conducted with operators concerning reasons for selected annunciators and knowledge of recent changes to procedures, facility configuration and plant condi-tions. The inspector verified adherence-to approved procedures for en-going activities observe Shift turnovers were witnessed and staffing requirements confirme ~
Except where noted below, inspector comments-or questions resulting from these daily reviews were acceptably resolved by licensee personne (1) At the beginning of this inspection period the reactor was in Hot-Standby (Mode 3), recovering from an inadvertent Safety Injection - ,
Reactor Trip (see IR 334/85-18). Resulting equipment maintenance and related surveillance activities'are discussed in Detail 6.a of this report. -The inspector witnessed reactor startup on September 3, 198 Full power was subsequently achieved on September 4, 1985, without even !
(2) The reactor operated at full power until a spurious Overtempera-ture - Delta Temperature (OTDT) trip. occurred at 10:26 a.m., on September 16, 1985. The inspector was in the control room during the event, and observed operator action taken to stabilize the plan All emergency systems functioned correctly. The cause of the trip was a momentary electrical short on vital bus II, which tripped the Loop 2 OTDT bistable with the Loop 3 bistables already tripped for surveillance testin This completed the two out of three logic required for RPS actuation.
'
The cause of the short was traced to I&C surveillance testing of a wide range hydrogen analyzer recorder (H2R-HY 101). A poorly in-sulated shield cable contacted the recorder's power lead from vital bus -II and shorted it to the chassis (this instrument loop measures
,
I
- - - .
.
?
.
changes in current rather than voltage). Heat shrink tubing was added to correctly insulate the shielded cabl A check of other similar recorders added as part of this TMI modification work package found no other similar deficiencie ,
(3) The inspector observed reactor startup act.!vities on September 16, 1985. An inverse multiplication plot was performed per previous commitments. Estimated critical position was calculated to be about 160 steps on control bank 0. Actual critical position occurred earlier than expected; at about 186 steps on bank C with bank D fully inserted, which was within the minimum rod insertion limit found in TS Figure 3.1-1. The licensee informed the inspector that they believed the reason for this discrepancy was due to the quick decay of Xenon which peaked about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prior to criticality, and the RCS boron sampling error due to the delay in RCS mixing while diluting. .The inspector had no further question (4) On September 26, 1985, computer specialists replaced a power supply in the process variable computer (PVC) racks (DIN 3). When returned to service at 10:23 a.m., the P-250 process computer began reading the input from power range monitors NI 42 and 43 as about 20% lower than actual. This resulted in the erroneous logging of 62 penalty minutes for axial flux differenc The operators responded by manually' logging delta flux every 30 minutes per TS 4.2.l. At 11:20 a.m. , the reactor operator noted that tha individual rod position indicators (RPI) for all rods in control banks C~and D were reading 200 steps instead of 228 and 225, respectively. The DIN-3 unit was de-energized at 11:25 a.m. and all delta flux and RPI in-dications returned to normal. Investigation revealed that a single analog input board was common to these instruments. The board was replaced and control room indications remained normal when the DIN-3 unit was re-energize Since operability of the RPI system is re-quired by TS 3.1.3.2, evaluation of the acceptability of the PVC design such that an internal failure could effect multiple control room indications, is Unresolved Item (85-20-01). Verification that the RPI failure is reported in the next monthly operating report (per TS 3.1.3.2(3)) is Inspector Follow Item (85-20-02).
(5) During the week of September 23, 1985, the control room received a trouble alarm for vital bus No. 3. During troubleshooting, the f
inverter was placed on a dummy load with vital bus supplied from its auxiliary sourc During this time, the 500 amp inverter input fuse was accidentally blown during troubleshooting. The licensee replaced it with 400 amp fuse because stores had no available spares. The I&C supervisor stated that this was deemed acceptable as the normal load is 35 amps and the emergency load is 200 amp The electrical technical specification (Section 3/4.8) addresses only the charger and the battery banks. The inspector observed the licensee subsequently replace the fuse with a qualified spare on September 27, 198 . _ -- ... . ..-.-_.. . _ - - . . ... - --. .
,
-
.
.
The 500 amp fuses are stock items that had a reorder level of zer During the fuse replacement discussed above, a 3 amp instrumentation fuse was also accidentally blown. A review of the warehouse spare parts computer listing indicated that this item also had a reorder level of zero. The inspector expressed a concern that an actual plant emergency could be exasperated by a lack of qualified spare part Inspector Follow Item (85-20-03) will track licensee action to ensure that the stores department upgrades their administrative controls system to reorder emergency spare part stock items in a timely manne Plant Security / Physical Protection Implementation of the Physical Security Plan was observed in the areas listed in Paragraph 3a above with regard to the following:
--
Protected area barriers were not dagraded;
--
Isolation zones were clear;
--
Persons and packages were checked prior to allowing entry into the Pictected Area;
--
Vehicles were properly searched and vehicle access to the Protected Area was in accordance with approved procedures;
--
Security access controls to Vital Areas were Deing maintained and that persons in Vital Areas were properly authorized;
---
Security posts were adequately staffed and equipped, security per-sonnel were alert and knowledgeable regarding position requirements, and that written procedures were available; and
--
Adequate lighting was maintained.
.;
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLAN .
,. - -- ,
, .. . .. ~ . - - - . . .. . - _ - . . , - - . . . _ - - - . .. . . .
-
.. ,
_
y .. .. ,
. . . .
{ . ,'
1'.
- .. : .
.
.
i<
1
-
+
2, . ?
,
.t
' ,
,.
- -.
t
,
f. .
.
,.
..t
- - $
.
- '
,
,
, THIS PAGE'CONTAINS SAFEGUARDS
.INFORMATION AND IS.NOT FOR o.
l
>
PUBLIC DISCLOSURE, IT IS
'
p . INTENTIONALLY LEFT BLANK.-
.
I J
'I 1 -
I
[. '
r._
s v..
,
_
-
,
i i
!. -i ;
7, ,. j
{
'
-.... -. - . .:.. - . - --.. . . - . - . - . . - _ - - . . - . - - . . - . -. . . - . . . - , . - - - - . . . - . - - - . .
.
.
.
d. Radiation Controls
'
Radiatici controls, including posting of radiation areas, the conditions of step off pads, disposal of protective clothing, completion of Radi-ation Work Permits, compliance with the conditions of the Radiation Work Permits, personnel monitering devices being worn, cleanliness of work areas, radiation control job coverage, area monitor operability (portable )
and permanent), area monitor calibration and personnel frisking proce- '
- dures was observed on a sampling basi No discrepancies were observe e. Plant Housekeeping and Fire Protection Plant housekeeping conditions including general cleanliness conditicns and control of material to prevent fire hazards were observed in areas listed in Paragraph 3a. Maintenance of fire barriers, fire barrier penetrations, and verification of posted fire watches in these areas were also observe (1) The No. 1 diesel generator automatic fire suppression system was declared out of service on September 14, 1985. A solenoid operated valve failed during testing of a modification that would prevent an electrical short from erroneously firing the carbon dioxide sys-tem and disabling the diesels during a plant emergency. TS 3.7.14.3, Low Pressure Carbon Dioxide Systems, requires the establishment of a continuous fire watch within one hour, and submittal of a special report if not returned to operable status within 14 days. The in-spector periodically verified that the continuous fire watch was establishe The failed SOV was replaced on September 26, 198 Post maintenance testing witnessed by the inspector consisted of completing applic-able portions of OST 1.33.9, Carbon Dioxide Fire Protection System Test, and OST 1.33.13, Fire Protection System Detection Instrumen-tation Test. The first actuation attempt failed and a thermostatic circuit trouble light illuminated at the local pane After reset, the second attempt succeeded. A fire watch was maintained until the system was tested a third tim The inspector was informed that the reason for the first actuation failure was that the manual ac-tuation button was not held in long enough for the circuit to pick up, hence the trouble light. The Operations Supervisor stated that for human factors considerations, a placard specifying reauired pick up time would be placed at the panel. The inspector had no further concern (2) 10 CFR 50, Appendix R, Section III.G.2(e) requires structural steel forming a part of, or supporting firs barriers separating redundant trains to be protected to provide a fire resistance equivalent to that of the required barrier. TS 3.7.15, Fire Rated Assemblies,
. ._ . _ . - . . -
.
, -- - . _- . - _ - .. . .
- ' h
. '
c.~.
oa . .
"
Q, ,
'J 4 >
-s
' ,
requires fire barriers separating safety-related fire areas or por-
-tions of., redundant systems necessary to achieve safe shutdown within a fire area,ito be operable at all times. When such an assembly w is considered inoperable, the licensee has the option of either-u "-
(1) establishing a continuous fire watch or (2) verifying the oper--
e ability of fire detectors on at least one side of the inoperable
,
. assembly and establishing an hourly fire watch patrol until the functional capability is restore During review of control room logs, the inspector noted that two separate fire patrols were being conducted in sections of the ser-vice building; once an hour for the. cable mezzanine and once every four hours.for the ESF switchgear rooms, process rack room, and control ~ room air conditioning equipment room. The cable mezzanine patrols were initiated in February,'1985, when operability of the s carbon dioxide system was unresolve The operations supervisor ;
stated that this patrol was left in effect because the structural steel issue is still unresolved. The inspector was also informed-that the. reason for the four hour fire patrol of the ESF switchgear room was to meet commitments contained"in a DLC letter dated Jul , 1985. This letter discussed Appendix R fire protection commit-
'
ments an'd. exemptions granted by NRR letter of. August 30, 1985. The-structural steel exemption was denied at that time because-it is
to be addressed on a-generic basi '
The-inspector noted that the four hour commitment appeared to con-flict with the one hour-requirement already contained in'TS 3.7.1 The licensee immediately increased the switchgear fire patrol fre-
.quency to once an hou Further review indicated that security per =
sonnel perform a defacto fire watch in this area as part of their routine _ patrols. The inspector had no further concern . Engineered ~ Safety Features (ESF) Verification The operability of the Low Head Safety Injection System was verified during ;
the week of September 23, 1985, by performing a walkdown of accessible por-tions that' included the following as appropriate:
- (1) System lineup procedures matched plant drawings and the as-built con-figuratio (2) Equipment conditions were observed for items which might degrade perfor-manc Hangers and supports were operabl (3) _The interior of breakers, electrical and instrumentation cabinets were
' inspected for debris, loose material, jumpers, et (4) Instrumentation was properly valved in and functioning; and had current calibration dates.
i s
e f
+ms----,---w ,w..- v,-.,-e-- --v,-- ,w-- -r--www-=,v=~--n-~- ,v- , sr w ,-
. .-- - -. . .- -
- .
A
.
l
'
!
.(5) Valves were verified to be in the proper position with power availabl Valve locking mechanisms were checked, where require During performance of the monthly surveillance test on September 25, 1985, the inspector verified that the wedge rod repairs to the low head safety
. injection pumps discussed in IR 334/85-18 remained leak tigh No '
-
discrepancies were identifie . Overtemperature - Delta Temperature Trip
,
Purpose
The Overtemperature - Delta Temperature (OTDT) reactor trip setpoint refer-enced in TS Table 2.2-1, is provided to prevent DNB for all combinations of reactor coolant system pressure, power, coolant temperature, and axial power
distribution, provided that (1) the transient is slow with respect to trans-port delays and (2) pressure is within the range of the High and Low Pressure
reactor trips. The OTDT trip setpoint takes the form of a Laplace transform
{. containing specific time constants that are utilized in the lead -. lag con-troller for T-average. Currently, there are several ongoing issues related :
to spurious alarms, changes in network response due to RTD model changeout, ;
and its effects on the TS trip setpoint and response time limits. The in- '
spector reviewed the current status of licensee actions as discussed belo Spurious OTDT Alarms After startup from the fourth refueling outage, the plant began experiencing
.. numerous OTDT turbine runback and Delta-T alarms. Though these spurious L alarms have occurred in all three loops, they were most prevalent in the Inspector Follow Item (85-12-05) was opened to track licensee corrective actio Investigation revealed that the last protection channel Sostman RTD was re- l placed during the fourth refueling outage with a quicker responding Rosemount '
. RTD, to complete environmental qualification commitments. Through discussions with I&C engineers, the inspector was informed that the T-average signal 1 varies by about 1 F. The circuit's dynamic compensation of T-average amplifies '
this. fluctuation by a factor of seve When coupled with a random 2% fluctu-ation of the delta T signal, a 12% momentary variation in the OTDT setpoint A is seen. Since the turbine runback is set at 109%, this results in a spurious
, . alarm whenever-the delta-T and T-average signals upper fluctuations are o synchronous. This' appears to be a reasonable explanation, as the alarms greatly diminish when reactor power is less than or equal to 98%.
h -RTD. Replacement The Solid State Prctection System 7100 Series racks were shipped to Beaver Valley, Unit I with five resistors in the T-average and delta-T summators (TM-RC-422-l and K) that could be wired.into the circuit to act as a filter,
providing a one to five~second la The RTDs were originally procured by Westinghouse from two suppliers; Sostman and Rosemount. It was expected that
--
, _ _ _ . _
.
.
.
both models would have~a response time of about 0.5 seconds. After the Sost-man RTDs were installed at Beaver Valley, Unit 1, it was discovered that their response time approached 3.0 second When coupled with the summator lag time, a possibility existed that the overall response could exceed 4.0 seconds (which excludes a 2.0 second margin for coolant transport and thermal lag).
Consequently, Westinghouse informed the station by letter WIN 5581, dated December 21, 1977, that a two second lag should be installed when using Rose-mount RTDs and a zero second lag when using a Sostman RT Beaver Valley, Unit 1 preoperational and startup testing was conducted with Sostman RTDs and zero summator lag for all protection channels. Sostman stopped manufacturing RTDs in this time period and the only replacements available were the Rosemounts. From 1977 to date, as the RTDs failed, they were replaced on a one-for-one basis with the Rosemount These replacements were performed without modifying the summator lag values. The 18 month cali-bration and quarterly surveillance tests never identified a problem with the 0 TDT trip function as a result of thi Unresolved Item (85-16-04) was opened to determine whether an adequate safety review was conducted prior to replac-ing the Sostman RTDs with Rosemount RTDs. Since it appears that the RTD changeout has had a minimum effect an safety and a safety analysis was per-formed for DCP 695 (discussed below) to address the addition of the summator lag values, this item is close DCP 695, Lag Compensation for RCS Delta-T and T-average Summators The inspector reviewed the design concept dated August 28, 1985. The two de-sign objectives are to: (1) wire in two of the five existing summator lag resistors, and (2) revise the OTDT and OPDT reactor trip setpoint equations of TS Table 2.2-1. The safety evaluation addressed the RPS response time to assure that the sum of the sensor, channel, reactor trip breaker delay and gripper coil release times were less than 4.0 seconds. The safety evaluation also noted that a TS change would be required. The DCP contained no further discussions on the nature of the proposed TS chang The inspector discussed the proposed TS change with members of NECU, the On-site Safety Committee and Licensing and Compliance. Because of the nature of the OTDT setpoint generation, the licensee stated that updating the BV equation that describes the trip to conform with the standard technical specifications or adjusting the time constants to rigorously reflect the be-havior of each model RTD, constituted a clarification only. The original I
,
safety analysis addressed both model RTDs, and surveillance testing has veri-fied that the critical parameter - time response'to a step change in tempera- ,
ture, remained within the bounds assumed. Discussions with the Licensing l Project Manager, NRR, confirmed that this approach was acceptable. Licensee .
-actions regarding TS Table 2.2-1 update will be reviewed as Inspector Follow
]
Item (85-20-04).
i
,
-- , . - . . . _ . , , . , _ , - _ , , . . - , ,. . - .
, . _ _ _ _ _ . . _ .- _ _ _ . - _ ,
.
j~ e,.
,
'
-Response Time and Surveillance Testing During.the week of September 9, 1985,-the inspector periodically reviewed the ongoing modification work being' conducted under DCP 695. The inspector noted Ethat MSP 1.15B-2, OTDT Time Response for Implementation of DCP 695, specified b .an overall response time of less than or equal to 3.0 seconds. Since the-
. safety evaluation assigned a two second value assumed for.RTD sensor response
, ,
'
and filtering time and an additional two seconds delay time between the time-the OTDT reactor trip setpoint is reached and the time the rods begin to fall, there appears to be an inconsistency with the three second time assigned per
. -the DCP. Discussions with the I&C engineer indicated that the response time E associated with the analog and logic circuits, trip breakers opening, and the
tripper coil releasing, was less than 1.0 seconds and therefore, a response-time of less the 3.0 seconds added to that was sufficient to meet the 4.0
- - - -second criteria assumed ~in the safety analysis. Actual analog response times for Loop C were about 0.9 seconds for a step change in T-average'and seconds for Delta T. Previous tests with the summator lag set at zero were about 0.6 seconds and 0.03 seconds respectively. This appears acceptable and the. inspector had no_further concern ,
At the conclusion of this inspection period, no other spurious OTDT alarms I occurred for the modified loops. IFI 85-12-05 is therefore close ' ESF Equipment Maintenance-and Testing Main Steam Isolation Valves
'
TS Requirements TS 3.7.1.5 requires each main steam line isolation valve (MSIV)'to be operable when the reactor is in Modes 1 thru TS 3.3.2.1, ESF Actu-ation System Instrumentation, requires the ESF instruuentation channels that actuate the MSIVs to be operable with their trip tetpoints consis-l tent with the values shown in Table 3.3-4. From Table 3.3-3, ESF Actu-r ation System Instrumentation, the steam line isolation function is re-quired for (1) a low steam line pressure when the-plant is operating in Modes 1 thru 3 (above the P-11 setpoint) and (2) a high steam pressure rate when the plant.is'in Modes 3 and 4 (this trip function is auto-i matica11y bypassed above P-11, and is bypassed below P-11 when SI on low steam pressure.is not manually bypassed). The inconsistency between the
'
requirement for the ESF' instrumentation actuation operability versus the
,
MSIV hardware operability'to perform this function was brought to the
'
licensee's attention for correction and will be tracked along with those items previously discussed for l'iresolved -Item (85-18-01). :
.
Surveillance Testing
. The MSIVs are required to fully close within five seconds on any closure actuation signal while in Hot Standby with T-average greater than or
. equal to 515 F during each reactor shutdown, not to exceed once per 92 :
,
-+
t
-p . s-e,.----..hw '
. ~ , , r,.,,-.yy 7,-. , .-mm , --m . , , , . . , ,, _ ,--r. ..,-,e r-,--r . + -, ,
.
. .
day The inspector witnessed portions of these tests from both the-control room and the inain steam valve room on September 2,1985. Both the B and C MSIVs exceeded the 5.0 second limit. Investigation revealed that the SOVs were functioning properly but that the actuator assemblies were apparently binding. The B MSIV was only about .5 seconds outside of its limit. A cracked brass yoke was replaced and the actuator as-sembly lubricated per the preventative maintenance procedure specifica-tion. 'The valve was satisfactorily retested.
,
The inspector and operations personnel noted that the C MSIV was only traveling about two-thirds close When the actuator linkage was dis-connected, the flapper readily dropped indicating no internal valve dam-age. The inspector witnessed portions of the corrective maintenance which included changing out the B actuator after dismantling indicated that internal cylinder scoring had occurred. The cylinder was remachined and the valve successfully stroke tested at about 4.6 seconds on Septem-ber 3, 198 No reason for the cylinder scoring was identified by the licensee.- Turbine Driven Auxiliary Feedwater Pump (FW-P-2)
The FW-P-2 governor was changed out during the fourth refueling outage as part of the routine preventive maintenance program. After plant startup, auxiliary operators noted a difference between the actual governor speed setting and the value referenced in the station log Monthly surveillance test results indicated that the pump was operable and fully capable of performing its design function. To ensure the speed
. setting was correct, maintenance personnel contacted the governor vendo The results of this discussion apparently led to some confusion caused by the governor vendor concerning the mechanical overspeed stop and the function of the governor to control the turbine speed up to the mechani-cal sto TOP 85-18, Determination of Turbine Driven Auxiliary Feed Pump Governor Setting, was written to empirically determine the governor setting for a high speed stop of 4758 rpm, which is below the 4830 rpm mechanical overspeed trip. The inspector reviewed the safety evaluation which con-cluded that no unreviewed safety question was involved because the set-ting is not referenced by technical specifications and the determination of the high speed stop was required due to changeout of the governor, which does not change the original design criteria. The original calcu-
.lation had incorrectly assumed that a zero speed setting corresponded to zero rpm on the turbine speed. After the TOP was performed on August 6,1985, which included performance of the monthly surveillance test, the speed setting was changed on August 9, 1985, to what was thought to be 4200 rpm rated speed without terunning the pump to measure its true speed. During the next monthly OST performed on September 4, 1985, the shift supervisor noted that although the pump passed all of the TS ac i ceptance criteria, it had a speed of about 4700 rpm. The inspector wit-nessed a retest on' September 6,1985, and in addition to the 4700 rpm
)
- - -
_ _ v
..
l
..
pump speed, noted that the turbine's sentinel valve was lifting, which indicated an excessive discharge pressure (per the Terry Turbine vendor l manual).
!
After contacting the turbine vendor, TOP 85-23, Turbine Driven Auxiliary Feedwater Pump Speed Adjustment, was developed to set the governor to maintain a nominal speed of 4200 rpm while maintaining the performance criteria specified in the T The inspector witnessed performance of this TOP and noted that after correcting the turbine speed to 4200 rpm, the turbine sentinel valve no longer lifte Although the original safety evaluation concluded that the governor speed setting could be changed without presenting an unreviewed safety question as it was not referred to in the technical specification, adequate post-maintenance testing would have indicated that an abnormal condition ex-isted in the turbine. The primary cause of this problem was apparently due to faulty advice provided by the governor vendor. Licensee correc-tive actions were satisfactor . Component Cooling Water Heat Exchangers (CCR-HX) - Allegation RI-84-A-0179 Region I received an allegation on December 10, 1984, concerning the size of the component cooling water heat exchanger (CCR-HX) tube holes. Much of this
~
allegation had to be interpreted by NRC technical personnel because the citi-zen was net sure of the exact nature of the alleged proble The purpose of-this detail is to consolidate past inspection activities with regard to the work performed, the role of QC, and the post-repair tests and inspection Several small leaks were discovered on CCR-HX-1C on April 7,.1984, after
- mechanical tube cleaning. -Eddy-current testing showed extensive tube pitting
.on the river water side (ID) of the tube Selected tubes were plugged and the remaining two heat exchangers were inspected. Unresolved Item (8& l2-05)
, was opened to track investigation of other heat exchangers served by the river
[ water system to determine whether they were subjected to the same failure mod . NECO report of June 25, 1984, identified the tube degradation problem as being due to crevice corrosion caused by manganese deposits from river water. The licensee concluded that these pinhole leaks were of such a nature that a cata-l strophic tube failure was not considered likely. This report was forwarded to Region I for review by engineering specialists. A telecon was conducted on August 21, 1984, betwe'en the Region I specialists and licensee engineering representatives to clarify certain details of that report. All concerns were resolved at that time as documented in IR 334/84-2 CCR-HX-1C was retubed beginning in May, 198 During' the 4th refueling out-age, starting in mid-October, 1984, the A heat exchanger retubing work starte Difficulties were encountered during the retubing work due to support align-ment problems, but the inspector was not able to identif" any problems due to holes that were too big. After the alignrrent difficulties were resolved and retubing completed,-leak testing observed by the inspector identified
. - . -. -. -- - . . - - - -
. . .. _- . . . . .- -. .. -- -
'-
..
-..
, 14
.
several pinhole leaks at the peripheral where the water box bolts to the tube
. sheet. . Several weld repairs were conducted and a subsequent hydro test was cbserved by the inspector. Quality Control covered both the repair and test-ing. The allegation that.there were " hundreds of holes that were too big.for-components" and the~NRC. assumption / interpretation that the allegation per-tainedJto the A heat exchanger could not be substantiated. Based on the satisfactory completion of the hydro test, the heat exchanger was returned
,
to service.
i-On April 2, 1985, the B heat exchanger was removed from service for mechanical tube cleaning. Three leaking tubes were identified at that time. While it
=
-was out of service for tube plugging and repair, the A heat exchanger devel- :
oped a catastrophic tube-failure on April 27, 1985, as indicated by a surge-tank level decrease of approximately 1" every 15 - 20 minutes. The heat ex-
' changer was isolated and the tube was plugged but not pulled at that time be- 2 cause of the immediate need for two CCR heat exchangers while cooling the plant ;
down to Mode 5 conditions in preparation for maintenance activities. Inspector '
Follow Item (85-12-03) was opened to determine the cause of the tube failur After the A heat exchanger was removed from service and the failed tube pulled
'and plugged, several additional small leaks on the tube to tube sheet cladding interface developed. Weld repairs were conducted and the inspector observed the final hydrostatic test on July 24, 1985 (see IR 334/85-17).
'
.
NECU Report dated September 9,-1985, indicated that light optical and scanning electron microscopy identified the tube failure mode as being reverse tor-sional fatigue.- The fracture on the peripheral tube was located at the mid-point of.the overall tube length at the support plate. The X shaped charac-teristics of the tube fracture were determined to be similar to those expected for this type of fatigue. failur Subsequent eddy-current examination of the two outmost rows of tubes on the lawer half of the A heat exchanger bundle .
identified no significant indications or' wall thinning. This suggests that the pr'oblem is-limited to the one failed tube. The licensee has recommended that the A heat exchanger be subjected to a shell side pressurization during the fifth refueling outage scheduled for mid-1986. IFI (85-12-03) is close As of this report, CCR-HX-1B is scheduled for- retubing during the next re-fueling outage. Ttg inspector was informed by maintenance personnel that the results of inspections conducted during the last outage for other safety-related heat exchangers (diesel generator coolers, one recirculation spray heat exchanger) indicated that only minor tube pitting had occurred. Inspec-
. tion of two additional recirculation spray heat exchangers and modificction '
of the'A and'C charging pump lube oil coolers are scheduled for the 1986 out-age. The inspector had no further concerns and Unresolved' Item (84-12-05)
is close , Emergency Preparedness Drill The inspector participated in the Beaver Valley Annual Emergency Exercise conducted on September 19, 1985, as a member of the NRC's Regional Response Team.- Licensee activities were observed from both the control room and the
.- - -. - , _ - . _ .. - - ..-._. - .. - - : _ .. - - - - . - . - _ - .
.
i
l 15 ;
,
Technical Support Center. During the drill, an actual fire occurred in the Turbine Building when the B station air compressor belts smoldered. The lic- ;
ensee quickly suspended the drill, assembled the fire brigade, and extin- <
guished the belts. Instrument air pressure had dropped from 110 lbs. to a minimum of 90 lbs., before recovery. After the plant condition was stabilized and evaluated by the licensee, the drill was resumed. The NRC critique of the drill can be found in NRC Inspection Report 334/85-19. Licensee perfor-tance was considered stron . Monthly Operating Reports The inspector reviewed the report issued for the month of August, 1985, to verify that the information required by TS 6.9.1.6 was accurate. The inspec-tor noted that the August 29, 1985, safety injection - reactor trip was re-ported only as a reactor trip due to a loss of instrument ai It did not refer to the declaration of an Unusual Event nor the safety injection involve This was brought to the attention of the supervisor of testing and plant per-formance. The inspector was informed that the September, 1985, Operating Report would be annotated to corrected this omissio The inspector had no further question . Inoffice Review of Licensee Eveat Reports (LERs) ,
The' inspector Wviewed LERs submitted to the NRC:RI office to verify that the details of.the event were clearly reported, including the accuracy of the description of cause and adequacy of corrective action. The inspector deter-mined whether further information was required from the licensee, whether generic implications were indicated, and whether the event warranted onsite followup. The following LER was reviewed:
LER: 85-13 provided details of a reactor trip on July 6,1985, due to a low-low steam generator level. The initiating fault was identified as a Hagen V-TO-1 converter used in the steam pressure mode, that went into a continuous reset mode of operation. The corrective action relating to this was not dis-cussed in the text of the LE The inspector requested the licensee to issue a supplemental report detailing the corrective action. This is Inspector Follow Item (85-20-05).
11. Exit Interview Meetings were held with senior facility management periodically during the course of this inspection to discuss the inspection sccpe and finding A summary of inspection findings was further discussed with the licensee at the conclusion of the report perio .. , ._ - .-- .- . .-.