March 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY UNITS 1 AND 2 (05000334/2012001 AND 05000412/2012001)

Dear Mr. Harden:

On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Beaver Valley Units 1 and 2 during the most recent quarter was within the Regulatory Response Column of NRC=s Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in NRC Inspection Report 05000334/2012404 and 05000412/2012404 sent on August 16, 2012. Beaver Valley Units 1 and 2 transitioned to the Regulatory Response Column beginning the third quarter of 2012 as documented in a letter issued by the NRC on December 14, 2012. Consistent with the graded approach in the NRCs Reactor Oversight Process, this change in performance from the Licensee Response Column to the Regulatory Response Column results in a corresponding increase in the NRCs inspection and assessment oversight. Therefore, in addition to ROP baseline inspections, the NRC plans to schedule and conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," after your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Gordon K. Hunegs at (610)337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts, Director Division of Reactor Projects

Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73

Enclosure: Beaver Valley Inspection/Activity Plan

cc w/encl: Distribution via ListServ

ML13063A077 SUNSI Review

Non-Sensitive

Sensitive

Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP

NAME SBarber/ GSB GHunegs/ GKH DRoberts/ DJR

DATE 02/ 21 /13 02/ 26 /13 02/ 28/13

Page 1 of 2 01/28/2013 08:34:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 01/01/2013 - 06/30/2014 EP

- EP

1, 2 IP Alert and Notification System Testing 7111402 09/03/2013 09/06/2013 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/03/2013 09/06/2013 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/03/2013 09/06/2013 MODS

- PERMANENT PLANT MODIFICATIONS

1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/28/2013 02/01/2013 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 02/11/2013 02/15/2013 71124

- OCC RADIATION SAFETY

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/28/2013 02/01/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 01/28/2013 02/01/2013 71124

- OCC RADIATION SAFETY

1, 2 IP Radiological Environmental Monitoring Program 71124.07 04/01/2013 04/05/2013 7111107T

- TRIENNIAL HEAT SINK

1, 2 IP Heat Sink Performance 7111107T 06/03/2013 06/07/2013 7111111B

- BV2 REQUAL INSPECTION WITH P/F RESULTS

2 IP Licensed Operator Requalification Program 7111111B 08/26/2013 08/30/2013 71124

- OCC RADIATION SAFETY

1, 2 IP Radiation Monitoring Instrumentation 71124.05 07/29/2013 08/02/2013 60853

- ISFSI PAD CONSTRUCTION

1, 2 IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 09/01/2013 12/31/2013 71124

- OCC RADIATION SAFETY

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/30/2013 10/04/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 09/30/2013 10/04/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/30/2013 10/04/2013 1, 2 IP Occupational Dose Assessment 71124.04 09/30/2013 10/04/2013 7111108P

- U1 INSERVICE INSPECTION

1 IP Inservice Inspection Activities - PWR 7111108P 10/07/2013 10/18/2013 PI&R

- PI&R TEAM

1, 2 IP Problem Identification and Resolution 71152B 11/18/2013 11/22/2013 1, 2 IP Problem Identification and Resolution 71152B 12/02/2013 12/06/2013 TI 182

- DEGRADED UNDERGROUND PIPING - PHASE 2

1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 12/09/2013 12/13/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 01/28/2013 08:34:44 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Beaver Valley Inspection / Activity Plan 01/01/2013 - 06/30/2014 71124

- OCC RADIATION SAFETY

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/27/2014 01/31/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 01/27/2014 01/31/2014 71124

- OCC RADIATION SAFETY

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/21/2014 04/25/2014 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/21/2014 04/25/2014 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/21/2014 04/25/2014 1, 2 IP Occupational Dose Assessment 71124.04 04/21/2014 04/25/2014 7111108P

- U2 INSERVICE INSPECTION

2 IP Inservice Inspection Activities - PWR 7111108P 04/28/2014 05/09/2014 EP EXER

- EP EXERCISE INSPECTION

1, 2 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 06/16/2014 06/20/2014 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.