March 2, 2005

SUBJECT:

ANNUAL ASSESSMENT LETTER - BEAVER VALLEY POWER STATION (REPORT 05000334/2005001 AND 050000412/2005001)

Dear Mr. Pearce:

On February 10, 2005, the NRC staff completed its end-of-cycle plant performance assessment of the Beaver Valley Power Station. The end-of-cycle review involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1, 2004 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.

Overall, Beaver Valley operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). We plan to conduct only baseline inspections at your facility through September 30, 2006, with the exception of additional inspection procedures to be conducted prior to and during the Unit 1 steam generator and reactor vessel head replacement outage.

The enclosed inspection plan details the inspections scheduled through September 30, 2006.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public

Mr. L. William Pearce Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Arthur Burritt at (610) 337-5069 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Peter W. Eselgroth, Chief Projects Branch 7 Division of Reactor Projects Docket Nos.

50-334 & 50-412 License Nos. DPR-66 & NPF-73 Enclosure: Beaver Valley Inspection/Activity Plan

Mr. L. William Pearce cc w/encl:

J. Lash, Director, Site Operations R. Mende, Director, Performance Improvement T. Cosgrove, Director, Engineering L. Freeland, Manager, Regulatory Compliance M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety, Commonwealth of Pennsylvania C. OClaire, State Liaison to the NRC, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia R. Chiodo, Beaver County Emergency Management Agency

Mr. L. William Pearce Distribution w/encl: (VIA E-MAIL)

S. Collins, RA J. Wiggins, DRA P. Eselgroth, DRP R. Barkley, DRP S. Lee, OEDO R. Laufer, NRR T. Colburn, PM, NRR P. Cataldo, DRP, Senior Resident Inspector C. ODaniell, DRP DRS Director, RI DRS Deputy Director, RI DRS Branch Chiefs, RI P. Kaufman, DRS J. McFadden, DRS G. Smith, DRS D. Silk, DRS P. Garrett - Resident OA C. Pederson, DRS-RIII (Only Inspection Reports)

RidsNrrDipmlipb Region I Docket Room (with concurrences)

DOCUMENT NAME: S:\\ROP5 End of Cycle Review\\Branch 7\\BV 2005 EOC Letter FINAL.wpd SISP Review Complete: ___RSB_____ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a co py of this docum ent, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure

"N" = No copy OFFICE RI/DRP RI/DRP RI/DRP

NAME PCataldo/RSB for RBarkley/RSB PEselgroth/PWE DATE 2 / 24 /05 2 / 24 /05 03 /02 /05 OFFICIAL RECORD COPY

Beaver Valley Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2005 14:40:03 Report 22

2/28+EXM

- UNIT 1 OPERATOR LICENSING INITIAL EXAM Not Applicable 02/28/2005 03/11/2005 BEAVER VALLEY, UNIT 1 INITIAL EXAM (12/1/04)

U01542

4 2/28+EXM

- UNIT2 OPERATOR LICENSING INITIAL EXAMS Not Applicable 02/28/2005 03/11/2005 BEAVER VALLEY, UNIT 2 INITIAL EXAM (12/1/04)

U01534

2 7111108P

- INSERVICE INSPECTION - U2 Safety Issues 04/04/2005 04/08/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]

IP 2515/160

Baseline Inspections 04/04/2005 04/08/2005 Inservice Inspection Activities - PWR IP 7111108P

1 7111108P

- INSERVICE INSPECTION - U2 Safety Issues 04/11/2005 04/15/2005 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02 IP 2515/150

Baseline Inspections 04/11/2005 04/15/2005 Inservice Inspection Activities - PWR IP 7111108P

1 7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 04/25/2005 04/29/2005 ALARA Planning and Controls IP 7112102

3 MODS

- MODS & 50.59 Baseline Inspections 06/20/2005 06/24/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/20/2005 06/24/2005 Permanent Plant Modifications IP 7111117B 1, 2

71152B

- PI&R Baseline Inspections 08/08/2005 08/12/2005 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 08/22/2005 08/26/2005 Identification and Resolution of Problems IP 71152B 1, 2

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 08/22/2005 08/26/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2

7111111B

- LO REQUAL PROG (FOCUS U2 OPTEST)

Baseline Inspections 10/24/2005 10/28/2005 Licensed Operator Requalification Program IP 7111111B

4 71002

- LICENSE RENEWAL - AGING MGMT License Renewal Insp 11/14/2005 11/18/2005 License Renewal Inspection IP 71002 1, 2 License Renewal Insp 11/28/2005 12/02/2005 License Renewal Inspection IP 71002 1, 2

7111107B

- HEAT SINK Baseline Inspections 12/12/2005 12/16/2005 Heat Sink Performance IP 7111107B 1, 2

50001

- U1 SG REPLACEMENT Other Routine 01/01/2006 04/01/2006 Steam Generator Replacement Inspection IP 50001

1 71007

- U1 HEAD REPLACEMENT Other Routine 01/01/2006 04/01/2006 Reactor Vessel Head Replacement Inspection IP 71007

1 7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 03/13/2006 03/17/2006 ALARA Planning and Controls IP 7112102 1, 2

7111108P

- INSERVICE INSPECTION - UNIT 1 Baseline Inspections 04/10/2006 04/14/2006 Inservice Inspection Activities - PWR IP 7111108P

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Beaver Valley Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2005 14:40:03 Report 22

71111.21

- SSDI Baseline Inspections 05/22/2006 05/26/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 06/05/2006 06/09/2006 Safety System Design and Performance Capability IP 7111121 1, 2

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/12/2006 06/16/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2

7111401

- EXERCISE EVALUATION & EP PI VERIFICATION Baseline Inspections 06/26/2006 06/30/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 06/26/2006 06/30/2006 Performance Indicator Verification IP 71151 1, 2

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections 08/07/2006 08/11/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2

7111112B

- MAINTENANCE RULE Baseline Inspections 09/11/2006 09/15/2006 Maintenance Effectiveness IP 7111112B 1, 2

7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 09/25/2006 09/29/2006 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.