MAY % 31986 Docket No.
50-334 Duquesne Light Company ATTN: Mr. J. J. Carey Vice President Nuclear Group Post Office Box 4 Shippingport, Pennsylvania 15077 Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP) Report No.
50-334/85-99 This refers to the evaluation we conducted of the activities at the Beaver Valley
Power Station, Unit 1, for the 18 month period from April 1,1984 to September 30, 1985 and discussed with members of your staff on December 19, 1985 at the Region l
I office in King of Prussia, Pennsylvania.
The list of meeting attendees is at-
,
tached as Enclosure 1.
The NRC Region I SALP Report is provided as Enclosure 2.
r Our letter of December 12, 1985 (Enclosure 3) forwarded the SALP Board Report and
'
solicited comments. As you discussed during the December 19 meeting and subse-
quently documented in your January 15, 1986 letter (Enclosure 4), you provided ad-
}
ditional information related to Refueling and Outage Management.
In addition, you i
stated that Duquesne Light Company believes that the Radiological Control Program at Beaver Valley was functioning at a sufficiently high level to merit a SALP i
Category 1 rating and offered extensive comments in support of that view.
We have reevaluated the Radiological Controls area taking into consideration your additional comments. We acknowledge that you have a basically sound radiological
'
program that is fully satisfactory.
However, compliance with NRC regulations does
not by itself warrant a high rating.
Our judgement remains that,
.c program
'
slipped somewhat, which we attribute largely to the uncertainties engendered by i
organizational changes during the assessment period.
Based on this judgement, therefore, we have not changed the Category 2 rating.
t A review of the SALP history for Beaver Valley 1 over the past six years shows a
steadily improving trend in performance, up to the most recent (fifth) assessment i
period.
In addition to radiation protection discussed above, we observed a slip-
-
page in the refueling and outage management area that was caused by a breakdown
'
in management controls at the end of the last refueling outage.
We understand
!
there have been changes that should prevent a recurrence.
Overall, we believe that continued management attention to details can lead to a renewed trend of improved performance at Beaver Valley 1.
i Our report also notes the drain on Unit 1 resources due to extensive cross-training on Unit 2.
Since the end of the SALP period, we have noted that much of this cross-training has been completed and further impact has been significantly reduced.
,
!
P 2 !T gigggg,
a b
t
.
,
-
-
r
-
,
,
.
.
.
Duquesne Light Company
MAY231986 We consider our meeting and subsequent interchange of information were beneficial and improved mutual understanding of your activities and our regulatory program.
No reply to this letter is required.
Your actions in response to the NRC System-atic Assessment of Licensee Performance will be reviewed during future inspections of your licensed facility.
Your cooperation is appreciated.
Sincerely, prisinalSignedg :
g Thomas E. Murley Regional Administrator Enclosures:
1.
SALP Management Meeting Attendees 2.
NRC SALP Report, Beaver Valley Unit 1, November 12, 1985 3.
NRC Region I Letter, T. Murley to J. Carey, December 12, 1985 4.
Duquesne Light Letter, J. Carey to T. Murley, January 15, 1986 5.
Beaver Valley Unit 1 SALP History cc w/ enc 1:
H. M. Siegel, Manager, Nuclear Engineering Department C. E. Ewing, QA Manager W. S. Lacey, Station Superintendent R. Druga, Chief Engineer R. Martin, Nuclear Engineer J. Sieber, Manager, Nuclear Safety and Licensing T. D. Jones, Manager, Nuclear Operations N. R. Tonet, Manager, Nuclear Engineering Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania Chairman Palladino Commissioner Roberts Commissioner Asselstine
.
Commissioner Bernthal Commissioner Zech i
i
,
L
.
.
.
..
.
.
.
.
.
.
.
.
.
_
_ _ _ _ _.. _. _ -.
_
. _ _
_
__
__
. _ _ _ _. _ _ _
- = '..:
~
,.
I
!
Duquesne Light Company
NAY 2 31986 i
i bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
l
,
Section Chief, DRP
'
i M. McBride, RI, Pilgrim
)
i G. Walton, SRI, BV-2
!
!
P. Tam, LPM, NRR
T. Murley
{
K. Abraham (2 copies)
!
D. Holody i
J. Taylor, IE
!
Division Directors i
Branch Chiefs SALP Management Meeting Attendees I
I i
!
!
!
t i
I
?
i l
i i
i f
!
!,
!
i l
l
!
i
!
!
'
i l
I
'
!
!
'
.
b Y
f 4 bRP f f/
R ORSS
- (
R Tri meo Wenzj er T.fdgin ta cki A1 jp Mur e
'
3/7 86
$ ty fl$
4; 5/
,
l k
0FFICIAL RECORD COPY
'
i
<
!
}
!
L
i
)
i
.
. _ _
_
_ _ _. _. -. _.
_. _
.
.. _ _.
..
_. _.
!
I.
,
)
.,
J ENCLOSURE 1 DECEMBER 19, 1985 SALP MANAGEMENT MEETING ATTENDEES i
1.
Licensee Attendees
J. J. Carey, Vice President, Nuclear Group C. E. Ewing, Manager, Quality Assurance i
T. D. Jones, General Manager, Nuclear Operations
J. A. Kosmal, Manager, Radiological Control
]
W. S. Lacey, Plant Manager J. H. Lukehart, Jr., Director of Security
'
J. D. Sieber, General Manager, Nuclear Services
'
2.
NRC Attendees
J. M. Allan, Deputy Regional Administrator
-
- '
R. R. Bellamy, Chief, Emergency Preparedness and Radiological Protection Branch S. D. Ebneter, Director, Division of Reactor Safety
!
G. W. Meyer, Project Engineer
1 R. W. Starostecki, Director, Division of Reactor Projects
P. Tam, Licensing Project Manager
'
L. E. Tripp, Chief, Reactor Projects Section 3A
'
S. Varga, Division of Licensing, NRR E. C. Wenzinger, Chief, Projects Branch No. 3
I, i
i I
,
I
- {
l
!
l
>
t f
l
.
.
-
j
-...
-
'
i
,
.
I j
.,
.
., _ _ _ _. _
.. -
-...
.
..
..