SUBJECT:
ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY UNITS 1 AND 2 (REPORT 05000334/201 0001 AND 05000412t2010001)
Dear Mr. Harden:
On February 11,2011, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from January1,2010 through December3l,2010. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Beaver Valley Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). Please contact me at 610-337-5200 with any questions you have regarding this letter.
Sincerely, r /
^l r-Y_a_^OJ t. \\
Ronald R. Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos: DPR-66, NPF-73 cc w/encl: Distribution via ListServ Beaver Valley Units 1 and 2 Inspection/Activity Plan Please contact me at 610-337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Ronald R. Bellamy, Ph.D., Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-334, 50-412 License Nos: DPR-66, NPF-73 cc dencl: Distribution via ListServ Beaver Valley Units 1 and 2Inspection/Activity Plan Distribution w/encl:
W. Dean, RA D. Lew, DRA D. Roberts, DRP J. Clifford, DRP P. Wilson, DRS R. Bellamy, DRP G. Barber, DRP C. Newport, DRP N. Lafferty, DRP J. Trapp, Rl, OEDO D. Werkheiser, DRP, SRI E. Bonney, DRP, Rl P. Garrett, DRP, OA DRS Branch Chiefs (6)
N. McNamara, Rl, SLO D. Tifft, Rt, slo D. Screnci, Rl, PAO N. Sheehan, Rl, PAO R. Barkley, Rl, ORA RidsNrrPMBeaverValley Resource RidsNrrDorlLplLl -1 Resource RidsNrrDirslpab ROPreportsResources ROPassessment Resource DOCUMENT NAME: S:\\ROP-11 EOC Review\\Branch 6\\Beaver Valley\\BV ROP-11 EOC Gover Ltr.Docx SUNSI Review Complete: RRB (Reviewer's Initials)
MLi10620054 After declaring this document "An Official Agency Record" it will be released to the Public.
fo roceive a copv of box: "C" OFFICE RI/DRP RI/DRP RI/DRP NAME DWerkheiser/DW SBarber/SB RBellamv/RRB DATE 02t22t11 02t24111 02t28t11 OFFICIAL RECORD COPY
"N" = No copy
Page 1 of 2 0210912011 08:31:10 Report 22 Beaver Valley Inspection / Activity Plan o1t0112011 - 0613012012 No. of Staff on Site 1,2
't,2
1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2 1,2
'1,2 1,2
't,2 1,2
'l 1,2
,l
o2n4no11 o2t14nu1 o3t14nu1 03t21t2011 0312112011 o3t2'U2011 05t16t20'11 05t1612011 o5t16nu1 05t161201',!
05t16120'11 05t1612011 o5/t62011 05r23t2011 06t0612011 0611312011 06,2012011 07t1812011 07t18t2011 10t't7t2011 0812912011 0911212011 o311212012 0410912012 02t1812011 o2t't8t20't1 03t2512011 03t2512011 0312512011 03t25p011 05t20120'11 05t2012011 05t2012011 0512012011 05t2012011 05t2012011 0512012011 05t28t201',!
06t10t2011 0611712011 06,t2412011 07t2212011 07t22t2011 10t21t2011 0910212011 o911612011 03116t2012 o411312012 71124
. OCC RAD SAFETY lP 71124.01 Radiological Hazard Assessment and Exposure Controls lP 71124.02 Occupational AI-ARA Planning and Controls 71111O8P. U2INSERVICE INSPECTION lP 7111108P Inservice Inspection Activities - PWR 7'1124. OCC RAD SAFETY lP 71'124.01 Radiological Hazard Assessment and Exposure Controls lP 7'1124.02 Occupational AI-ARA Planning and Controls aP 71124.04 Occupational Dose Assessment EP PROGR. EP PROGRAM INSPECTION lP 711'1402 Alert and Notification System Testing lp 7111'403 Emergency Preparedness Organization Staffing and Augmentation System lP 7'111404 Emergency Action Level and Emergency Plan Changes lp 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies lP71151-EP01 DrilUExercisePerformance lP 71 151-EP02 ERO Drill Participation lP 71 151-EP03 Alert & Notification System 71',t1121 - CDBI lP 71'11121 Component Design Bases Inspection lP 7111121 Component Design Bases Inspection lP 711112'l Component Design Bases Inspection 71124
. EFFLUENTS lP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124
.OCCRADSAFETY.REMP lP 71124.07 Radiological Environmental Monitoring Program T1.177
- MANAGING GAS ACCUMULATION IN ECCS lp 2515t177 Managing Gas Accumulation ln Emergency Core Cooting, Decay Heat Removal & Containment Spray System 7111118. BV2 REQUALINSPw/ P/F RESULTS lP 71111118 Licensed Operator Requalification Program 711528 - Pt&R lP 711528 ldentification and Resolution of Problems lP 711528 ldentification and Resolution of Problems 4/8EXAM. BEAVER VALLEY 1 INITIAL EXAM u01846 FY-12 BV1 lNlTlAL OPERATOR LICENSING EXAM u01846 FY-12 BV1 tNlTlAL OPERATOR LICENSING EXAM fhis report does not include INPO and OUTAGE activities.
This repcrt shows only on-site and announced inspedion procedures.
Page 2 ol 2 02l0gl20'11 08:31:10 Report 22 Beaver Valley Inspection / Activity Plan 01t0112011 - 06t30t2012 Unit Number 1,2 1,2 1,2
1,2 1,2 1,2 1,2
't,2 1,2 1,2 0311212012 0311212012 0311212012 0411612012 o4t23t2012 04t23t2012 04t23t2012 04t23t2012 0611812012 06118t2012 06125t2012 03t1612012 03t1612012 03t16t2012 0/,t2712012 04t27t2012 un7r2u2 Mt27l20't2 0412712012 06t22t20't2 o6t22t2012 06t29t2012 71124 lP 71124.01 lP 71124.02 lP 71124.04 7111108P lP 7111108P 71124 tP 71't24.01 lP 71124.02 lP 71124.03 tP 7'.t124.04 EP EX lP 7111401 tP 7',t11404 71124 tP 71't24.08
. OCC RAD SAFETY Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls Occupational Dose Assessment
- INSERVICE INSPECTION Inservice Inspection Activities - PWR
. OCC RAD SAFETY Radiological Hazard Assessment and Exposure Controls Occupational AIARA Planning and Controls ln-Plant Airborne Radioactivity Gontrol and Mitigation Ocrupational Dose Assessment
. EP EXERCISE EVALUATION-RW Exercise Evaluation Emergency Action Level and Emergency Plan Changes Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation this report does not include INPO and OUTAGE activities.
This report shows only orr-site and announced inspection procedures.