Insp Rept 50-412/85-18 on 850812-16.No Violations Noted. Major Areas Inspected:Qa Program for Preoperational Testing
ML20133F413
Person / Time
Site: Beaver Valley
Issue date: 09/27/1985
From: Eapen P, Napuda G, Verner J, Winters R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20133F404 List:
References
50-412-85-18, NUDOCS 8510110019
Download: ML20133F413 (9)


Text

__

,

,

,

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report N /85-18

,

Docket N #

License N CPPR-105 Category A Licensee: Duquesne Light Company

Robinson Plaza Building No. 2

' Suite #210, PA Route 60 Pittsburgh, PA 15205 Facility Name: Beaver Valley Power Station, Unit 2 Inspection At: Shippingport, Pennsylvania Inspection Conducted: -August 12-16, 1985 Inspectors: ~~

El RS\'

I G. Napuda, Ledd feacto/ Engineer ' date

cK w%

,

j,J. Verner, Summer Technical Intern date bb R. Winters,' Reactor Engineer

%d u, mf

' date

.

.'

Approved by: @ dcA+

Dr. P. K. Eapen, Chief, Quality Assurance

  1. e//W date Section, OB, DRS Inspection Summary: Routine unannounced inspection August 12-16, 1985 (Inspection Report No. 50-412/85-18)

i Areas Inspected: Quality Assurance Program for Preoperational Testing. This inspection involved 77 inspection hours by two region based inspectors and a Technical Inter Results: No violations were identifie PDR ADOCK 05000412 G PDR l

,

-

%

.

DETAILS 1.0 Persons Contacted Duquesne Light Company (DLC)

  • F. A. Arnold, Staff Engineer J. A. Bajuszik, Director, Construction Engineering J. J. Carey, Vice President, Nuclear Group
  • C. R. Davis, Director, QA
  • D. W. Denning,' Assistant Director, QA
  • J. J. Dusenberry, Manager, System Operation Verification Testing
  • M. A. Howman, Associate Engineer
  • J. D. Johns, QA Supervisor
  • J. R. Kasunick, Maintenance Director, Startup Group
  • M. Pavlick, Director, Milestone Management
  • C. K. Schultz, Procedure Review Committee (P.9C) Chairman
  • R. J. Swiderski, Manager, Startup
  • J. W. Waslouski, QA Supervisor
  • R. G. Williams, Supervisor Testing and Plant Performance Stone and Webster Engineering Company
  • Baranowski, Assistant Project Manager
  • A. A. Dasenbrock, Senior Construction Manager U.S. Nuclear Regulatory Commission
  • Prividy, Resident Inspector
  • Troskoski, Senior Resident Inspector Other administrative, construction, engineering, QA/QC, operations, and technical personnel were contacted during the inspectio * denotes those attending the exit intervie ' 2.0 General

.The intent of this inspection was to assess the organizational changes and plans for preoperational testin Procedures, including Quality Assurance surveillance procedures, were reviewed to verify that they were consistent with the licensee's commitments. The qualifications of the individuals performing the tests and those of the Quality Assurance surveillance personnel were reviewed and noted to be acceptable. The size of each organization and the timing for staffing to support the test schedule were also reviewed. The test activities were initiated and one test was partially completed. The records were not ready for review and approval. No new tests were on going at the time of this inspectio .. .

...

.

.

I 3.0 Requirements 10 CFR 50, Appendix B Beaver Valley Unit 2 PSAR, Section 1 Beaver Valley Unit 2 FSAR, Section 1 ANSI 18.7-1976, Administrative Controls and Quality Assurance for Operational Phase of Nuclear Power Plants 4.0 Preoperational Test Program Review The Beaver Valley Unit 2 (BV-2) Preoperational Test Program is contained in the Startup Manual (SUM). Selected procedures in the SUM were reviewed. The manual provided sufficient control for testing. The procedures were technically adequate and were written to meet the applicable regulatory requirements and the licensee commitment The Startup Manager is responsible for the preoperational test Responsibilities for preparing various chapters in the SUM were assigned as follows:

Ch. 1 BVPS-2 Startup Group Organization Startup Manager and Responsibilities Ch. 2 Administrative Controls and General Startup Manager Instructions Ch. 3 Pre-Operational Test Section Nuclear Station Superintendent Ch. 4 Maintenance Section Director - Maintenance Section Ch. 5 System Operability Verification Director - System Test Section Operability Verification Test Section l Ch. 6 Administrative Section Director -

Administrative Section Ch. 7 Milestone Management Section Director - Milestone Management Section Subsequent to preparation, these procedures were reviewed for technical content and regulatory and program requirements by a minimum of two of the following groups:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

- . .-- - - - _ _

.

.

Quality Assurance Procedure Review Committee Joint Test Group Independent Review Group Attachments I and II are lists of the procedures selected by the NRC inspectors for revie . Startup Group

The Startup Group (SUG) Manager reports directly to the Vice President-Nuclear Group who is the executive responsible for all aspects of the nuclear power program. The SVG has five divisions with one, the Pre-operational Test, responsible for the conduct of safety related systems testing. Another is responsible for the testing of balance of plant

system Discussions with the SVG Manager indicated that staffing is not yet completed, but vigorous internal recruitment is ongoing and it appears qualified employees are readily available. Testing personnel will be i certified to appropriate levels of ANSI N45. '

Planning flow charts and other schedule projections have been developed

, and these are utilized to determine manpower needs. The Startup

'

Manual has been completed and issued. In addition to the reviews dis-cussed in paragraph 4, test results will be reviewed by the Joint Test Group. The Vice President-Nuclear Group stated that should peak testing periods require augmented staff, contractor or other internal personnel will be utilize It was determined that DLC has developed program controls and an organization capable of conducting preoperational testing activities.

Also, the staff is adequate for current and near term scheduled test Management is committed to providing sufficient manpower as activities

increas No violations were identifie . QA Interface and Overview The Quality Assurance Unit Manager reports directly to the Vice President-Nuclear Group. The unit has five divisions with one, QA Operations, responsible for conducting audits and surveillances of preoperational testin The QA Unit has several vacancies with most in the recently established QA Surveillance sub group. Management representatives stated that these open positions have been posted in accordance with the company merit promotion policy. A former operations Shift Supervisor has already been selected for one of the QA Surveillance positions. The Vice i

b

, ,- - -,- - - . , , , ,,,c - . - . - , - - - - , , - rn,- , ,,--,,.,.,,_-,,,,,-------r----

- - - - , - - , , - -

_ _ __

.

.

President-Nuclear Group explained that the availability of experienced personnel formerly assigned to the Shippingport Unit would preclude manpower resource problem Two separate QA surveillances were conducted during the recent partial testing of the Station Batteries. Two audits were conducted of system turnovers. One of the Startup Group audit was completed and a second one is scheduled for this quarte Preoperational testing is to be performed by individuals in the startup group certified in accordance with ANSI N45. QA surveillance of the tests will be performed under the requirements of the BVPS QA Manual by individuals certified in accordance with either ANSI N45.2.6 or ANSI N45.2.23. The QA Surveillance group receives the test schedules and attends the status and scheduling meetings of the startup group and also receives 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notice of the initiation of any test. This assures QA has adequate notification of new tests. With this system 100%

surveillance is not anticipated, however the QA inspector / auditor will monitor critical functions during testing. QA Management will have the benefit of the status and scheduling meetings to assure their knowledge of critical operations and problems that are encountered so timely appropriate action can be take The inspectors concluded that this QA surveiliance of pre-operational test activities is comparable to the inspection coverage provided by QC during construction phas The following audit and surveillance packages were reviewed to determine compliance with regulatory requirements, licensee commitments and established procedure Audit DC-2-84-23, System Release / Turnover

--

Audit DC-2-84-25, Startup Group

--

Audit DC-2-85-27, Startup Group (scheduled for August 27-30,1985)

--

QA Surveillance 84-12, Station Battery Test

'

The Semi-Annual Report for First Half of 1985 compiled by the QA organi-zation, now provides an executive summary. The results of quality program element trending analysis is also contained in the report. It was noted that although the evaluation and coding of adverse findings incorporated a weighting factor this was not reflected in the trending analysis report which continues to be almost entirely quantitative in natur It was

determined that DLC has developed program controls and a QA organization

'

capable of current and near term overview (audits and surveillance) of preoperational testing activities and that management is committed to

providing sufficient manpower as neede No violations were identified, i

,

.

7. Management Meetings Licensee management was informed of the scope and purpose of the inspection at an entrance interview conducted on August 12, 1985. The findings of the inspection were discussed with licensee representatives during.the August 16, 1985 at the conclusion of the inspection (see paragraph I for attendees) at which time the findings were presented to licensee managemen At no time during this inspection was written material provided to the licensee by the inspector ,.

.

ATTACHMENT I EFFECTIVE STARTUP MANUAL REVISION DATE CHAPTER TITLE 1 BVPS-2 Startup Group Organization 2 6-28-85 and Responsibilities Administrative Procedure Prepara- 1 5-31-85 tion, Review, Approval and Revision Regulatory / Technical Information 1 7-12-85 Management 3 Preoperational Test Section 0 1-30-85 Procedure Review Committee 0 1-30-85 u3. 2 Independent Review Group 1 3-15-85 Joint Test Group (JTG) 0 1-30-85 Operations Group 0 1-30-85 Testing and Plant Performance Group 0 1-30-85 3. Preparation, Review, Approval and 1 7-26-85 Revision of Test Procedures 3.5.2 Testing and Plant Performance 0 2-14-85 Records Management 3.5.3 Administrative Guidelines for 0 2-14-85 Performing Test 3. Initial Startup Test Phase 0 1-30-85 3.5.5 Preparation, Review, Approval and 2 7-26-85 Revision of Beaver Valley Test Procedures (BVT's)

-- .. --

.

ATTACHMENT II Quality Assurance Instructions Instruction N Title Re . Quality Assurance Unit Organization and 5 P.espon sibili ties 2. Training of Quality Assurance Personnel 8 2. Training and Qualification of Auditors 7 Preparation and Revision of tne Quality 8 Assurance Program Evaluation of Quality Assurance Program 0 Description (Safety Analysis Report)

Changes 15. Reporting of Significant Deficiencies 2 15. Reporting of Newsworthy Incidents 1 15. Reporting of Quality Concerns 2 16. Corrective Action Requests 9 16. Audit Follow-up Report System 12 16. Quality Assurance Department 3 Responsibilities Under 10 CFR 21 16. Stop Work Actions 1 17. Control of Quality Assurance Records 2 18. Audit Schedules 9 18. Planning of Audits 8 18. Conduct of Audits 5 18. Reporting of Audits 11 18. Planning, Conduct, Reporting, and 5 Follow-up of Joint Audits

_ _ _ - ____

..

18.2.6 Guidelines for Coordination and Followup of 1 External Audits 18.3.2 Quality Assurance Surveillances 7 and 8 (draft)