PNO-I-99-048, on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H22 October 1999PNO-I-99-048:on 991022,operators Initiated Plant Shutdown from 100% Reactor Power,Due to Continued RCS Leakage Through B Pressurizer Code Safety Valve to Primary Relief Tank. Operators Are Reducing Reactor Power at 12% Per H
ML20217N14921 October 1999Notice of Violation from Insp on 990720-29.Violation Noted: as of July 1999,licensee Did Not Take Adequate Measures to Assure That Condition Adverse to Quality Involving Macro Biological Fouling of Service Water System CorrectedZebra Mussel
Condition Adverse to Quality
Biofouling
IR 05000334/19990067 October 1999Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violations Noted.Major Areas Inspected:Licensee Corrective Action Program ImplementationSafe Shutdown
Boric Acid
Condition Adverse to Quality
Operability Determination
Maintenance Rule Program
Fire Protection Program
IR 05000334/199900530 September 1999Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Nvcs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant SupportShutdown Margin
ML20211Q5797 September 1999Insp Rept 50-412/99-07 on 990720-29.No Violations Noted. Major Areas Inspected:Operations,Maint & EngineeringMission time
Zebra Mussel
Biofouling
IR 05000334/199900424 August 1999Insp Repts 50-334/99-04 & 50-412/99-04 on 990613-0724. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportBoric Acid
Stroke time
Temporary Modification
Zebra Mussel
Condition Adverse to Quality
Maintenance Rule Program
PNO-I-99-036, on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective Action26 July 1999PNO-I-99-036:on 990718,update to Beaver Valley,Unit 2 Forced Outage Made.Licensee Replaced Suspected Voltage Regulator Control Relays & Satisfactorily Retested EDG 2-2.Resident Inspectors Continue to Monitor Licensee Corrective ActionZebra Mussel
PNO-I-99-033, on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical Fault19 July 1999PNO-I-99-033:on 990716,apparent Electrical Fault Occurred During EDG Full Load Test,Which Opened Supply Breaker Between Emergency & Normal 4 Kilovolt Busses.Station Personnel Intend to Resolve & Correct Electrical FaultZebra Mussel
IR 05000334/19990037 July 1999Insp Repts 50-334/99-03 & 50-412/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Results of Y2K Readiness Assessment Also IncludedHigh Radiation Area
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Operability Assessment
IR 05000334/199900221 May 1999Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportSafe Shutdown
Boric Acid
High Radiation Area
Missed surveillance
Systematic Assessment of Licensee Performance
Power change
IR 05000334/199900122 April 1999Insp Rept 50-334/99-01 & 50-412/99-01 on 990207-0320. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Results of Insp by Regional Security & Inservice Insp SpecialistsBoric Acid
Non-Destructive Examination
Temporary Modification
Foreign Material Exclusion
Liquid penetrant
Offsite Circuit
IR 05000412/199930120 April 1999NRC Operator Licensing Exam Rept 50-412/99-301(including Completed & Graded Tests) for Tests Administered on 990322- 25.All Applicants Passed All Portions of ExamsSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
B.5.b
Scaffolding
Coast down
IR 05000334/199801125 February 1999Insp Repts 50-334/98-11 & 50-412/98-11 on 981227-990206. Violations Noted.Major Areas Inspected:Operations,Maint & Plant SupportHigh Radiation Area
Temporary Modification
Locked High Radiation Area
Maintenance Rule Program
ML20207E07625 February 1999Notice of Violation from Insp on 981227-990206.Violation Noted:Licensee Failed to Promptly Identify & Correct Condition Adverse to Quality in That Investigation of Improperly Calibr Channnels Was IncompletedCondition Adverse to Quality
ML20206U3145 February 1999Notice of Violation from Insp on 981116-1217.Violation Noted:On or Before 981217,design Control Measures Were Not Established to Ensure That Design Basis Closing Voltage Requirements of Circuit Breakers Were Met & Verified
IR 05000334/19980095 February 1999Insp Repts 50-334/98-09 & 50-412/98-09 on 981115-1217. Violations Noted.Major Areas Inspected:EngineeringTemporary Modification
Process Control Program
IR 05000334/199801013 January 1999Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Matl Condition of Fire Protection Equipment Installed in Plant Was ExcellentSafe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Fire Barrier
Fire Protection Program
IR 05000334/19980064 December 1998Corrected Pages 17 & 18 to Insp Repts 50-334/98-06 & 50-412/98-06,correcting Errors on Subj Pages
ML20196H2952 December 1998Insp Repts 50-334/98-08 & 50-412/98-08 on 981026-30.No Violations Noted.Major Areas Inspected:Operations & MaintHigh Radiation Area
ML20196H3232 December 1998Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant SupportBoric Acid
High Radiation Area
Enforcement Discretion
Temporary Modification
Process Control Program
IR 05000334/19980075 November 1998Insp Repts 50-334/98-07 & 50-412/98-07 on 981006-07.No Violations Noted.Major Areas Inspected:Performance of Emergency Response OrganizationGrab sample
IR 05000334/199800523 October 1998Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations, Engineering,Maint & Plant SupportHigh Radiation Area
Internal Flooding
Enforcement Discretion
Temporary Modification
Missed surveillance
Operability Determination
ML20151Z32315 September 1998Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportBoric Acid
Packing leak
Temporary Modification
Breakaway torque
ML20151Z31815 September 1998Notice of Violation from Insp on 980628-0815.Violation Noted:On 980808,inspectors Observed Maint Supervisor Manipulate Outboard Pump Packing Supply Valve & Perform Maint by Adjusting Outboard Packing Gland Nuts
IR 05000334/199830121 August 1998Exam Repts 50-334/98-301OL & 50-412/98-301OL Conducted During Wks of 980803-07 & 17-21.Exam Results:Four Unit 2 SRO Candidates Passed All Portions of Initial Exam.Good Performance Noted During Exam in Area of Crew CommunicationSafe Shutdown
Boric Acid
Shutdown Margin
B.5.b
Job Performance Measure
Scaffolding
ML20236X8665 August 1998Notice of Violation from Insp on 980426-0627.Violation Noted:From 1988 to Sept 1997,licensee Routinely Vented Units 1 & 2 HHSI Piping Prior to Surveillance Testing W/O Proper Controls to Evaluate Amount of Gas.No Response Required
IR 05000334/19980035 August 1998Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant SupportBoric Acid
Shutdown Margin
Probabilistic Risk Assessment
Temporary Modification
Locked High Radiation Area
Systematic Assessment of Licensee Performance
Operability Determination
Fire Watch
Operability Assessment
ML20236X8635 August 1998Notice of Violation from Insp on 980426-0627.Violation Noted:During Period of 980428-0608,licensee Failed to Implement Procedures as Evidenced by Listed Examples
IR 05000334/19983003 June 1998Exam Rept 50-334/98-300OL Conducted on 980420-24 & 0518.Exam Results:Three SRO Instant Candidates Passed All Portions of Initial License Exam
ML20217F58822 April 1998Notice of Violations from Insp on 980208-0321.Violations Noted:Conditions Adverse to Quality Were Not Promptly Corrected from Nov 1993 to March 1998,util Failed to Correct Known Unit 1 & 2 TS Deficiency in Timely Manner
ML20217F59522 April 1998Insp Repts 50-334/98-01 & 50-412/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant SupportPacking leak
Enforcement Discretion
Probabilistic Risk Assessment
Foreign Material Exclusion
Power Operated Valves
Scaffolding
Grace period
ML20217B97717 March 1998Notice of Violation from Insp on 971228-980207.Violations Noted:Repair Activities for 2-1 Station Battery Were Not Properly pre-planned & Implemented
ML20217B98517 March 1998Insp Repts 50-334/97-11 & 50-412/97-11 on 971228-980207. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support.Security Program Was Also InspectedSafe Shutdown
Time of Discovery
Fitness for Duty
Fire Barrier
Enforcement Discretion
Temporary Modification
Missed surveillance
Systematic Assessment of Licensee Performance
Power Operated Valves
ML20216E8079 March 1998Notice of Violation from Insp on 980105-0212.Violations Noted:On 971218 Dl Implemented Change to Temporary Operating Procedure to Allow Operators to Control Cooldown & Heatup Rate of Reactor Coolant by Mean Other than by Regulating
ML20216E8199 March 1998Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212. Violations Noted.Major Areas Inspected:Evaluation of Implementation of 10CFR50.59 SE Program Relating to Changes, Tests or Experiments at PlantEnforcement Discretion
Temporary Modification
Condition Adverse to Quality
Operability Determination
ML20202A9694 February 1998Insp Repts 50-334/97-09 & 50-412/97-09 on 971116-1227. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support.Rept Also Includes Results of Announced Insp in Areas of Emergency PreparednessAnticipated operational occurrence
Temporary Modification
Process Control Program
IR 07100116/20120274 February 1998Notice of Violation from Insp on 971116-1227.Violation Noted:Licensee Had Not Tested 20 of 27 Direct Lines at Alternate EOF in Coraopolis,Pa
PNO-I-98-002, on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.32 February 1998PNO-I-98-002:on 980130,operators Declared Both Trains of Component Cooling Reactor & Reactor Plant River Water Sys Inoperable Due to Failure to Meet TS Surveillance Testing Requirements.Entered TS 3.0.3 & 4.0.3Enforcement Discretion
IR 05000334/19970109 January 1998NRC Operator Licensing Exam Rept 50-334/97-10OL (Including Completed & Graded Tests) for Tests Administered on 971215- 18Ultimate heat sink
Stroke time
Job Performance Measure
ML20198K4766 January 1998Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Between 1988 & 970912, Condition Adverse to Quality Existed at Unit 1 & 2,when Excessive Gas Accumulated in HHSI Pumps Suction LinesCondition Adverse to Quality
ML20199A17131 December 1997EN-97-119:on 980106,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Violation Involving Failure to Take Adequate Action to Correct Significant Condition Adverse to QualityCondition Adverse to Quality
PNO-I-97-077, on 971216,Duquesne Light Co Initiated Unit 2 Reactor Shutdown in Accordance W/Ts 3.0.3.Licensee Plans to Address Unit 2 Design Deficiency for CR Emergency Air Cleanup & Pressurization,During Shutdown17 December 1997PNO-I-97-077:on 971216,Duquesne Light Co Initiated Unit 2 Reactor Shutdown in Accordance W/Ts 3.0.3.Licensee Plans to Address Unit 2 Design Deficiency for CR Emergency Air Cleanup & Pressurization,During Shutdown
ML20203D74226 November 1997Insp Repts 50-334/97-08 & 50-412/97-08 on 971005-1115. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportHigh Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Nondestructive Examination
Locked High Radiation Area
Maintenance Rule Program
Liquid penetrant
Dissimilar Metal Weld
IR 07100005/201101526 November 1997Notice of Violation from Insp on 971005-1115.Violations Noted:Workers,Found in Radiology Controlled Areas,Not Aware of Radiological Conditions in Work or Travel Areas
IR 05000334/19970077 November 1997Insp Repts 50-334/97-07 & 50-412/97-07 on 970831-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportUnanalyzed Condition
Foreign Material Exclusion
Operability Determination
ML20198S6357 November 1997Notice of Violation from Insp on 970830-1004.Violation Noted:Licensee Changed QA Program Resulting in Reduction in Commitments in QA Program Description Previously Accepted by NRC W/O Prior NRC Approval
IR 05000334/199700618 September 1997Insp Repts 50-334/97-06 & 50-412/97-06 on 970720-0830.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support & Licensed Operator Requalification Training ProgramTime of Discovery
Enforcement Discretion
Temporary Modification
Job Performance Measure
Operability Determination
ML20217P77318 August 1997Notice of Violation from Insp on 970608-0719.Violation Noted:Previous Corrective Actions Inadequate in That on 970701,unplanned Engineered Safety Feature Actuation, Occurred During Troubleshooting Activities on Unit 1
IR 05000334/199700518 August 1997Insp Repts 50-334/97-05 & 50-412/97-05 on 970608-0719. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant SupportUnanalyzed Condition
Time of Discovery
Offsite Dose Calculation Manual
Enforcement Discretion
Met Tower
Temporary Modification
Missed surveillance
Operability Determination
Fire Watch
ML20141G9973 July 1997Notice of Violation from Insp on 970209-0426.Violation Noted:During EDG Surveillance Tests,Load Test Values Used Were Inadequate to Ensure That EDGs Achieved 2750 Kw Due to Inaccuracies in Kilowatt Meter Instrument LoopStroke time