Insp Rept 50-412/89-10 on 890515-19.No Violations Noted. Major Areas Inspected:Inservice Insp Activities,Including Observations of NDE in Progress,Implementing NDE Procedures & Review of Inservice Insp Data
ML20245G649
Person / Time
Site: Beaver Valley
Issue date: 06/09/1989
From: Chaudhary S, Mcbrearty R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20245G639 List:
References
50-412-89-10, NUDOCS 8906290210
Download: ML20245G649 (8)


Text

-_

,

_

.. _ _ _

__

_ _.

- _ _ - _

___ _______

-

,.

-

.

\\

l l

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No. -5_0-412/89-10 Docket No.

50-412 License No. NPF-73 Priority

-

Category C

Licensee: Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077 Facility Name:

Beaver Valley Power Station, Unit 2 Inspection At:

Shippingport, Pennsylvania Inspection Conducted:

May 15-19, 1989

_

Inspector C

i

-

N R. A. McBearty, Reactor Engineer date

'

Approved by-

^

i S. K. Chaudhary, Chief, Materials and

'date'

Processes Section, EB, DRS Inspection Summary:

Inspection on May 15-19,1989 (Report No. 50-412/89-10)

Areas Inspected: A routine, unannounced inspection was conducted of inservice inspection activities including observations of NDE in progress, implementing NDE procedures, and review of ISI data.

Additionally, the inspection included steam generator tube eddy current examination results and secondary water chemistry.

Results: The inspector concluded that the licensee had established controls to manage its ISI program in compliance with applicable code and regulatory require-

ments, and that ongoing activities complied with requirements.

I g7 Fw&So noce.

05ct:04/R

,

fD G y

l

- --__-_ ___

- __

,

.

.

.

Details 1.0 Persons Contacted I

Duquesne Light Company

s J. D. Crockett, General Manager - Corporate Nuclear Services

R. L. Hansen, Director of General Engineering

T. Heimel, NDE Specialist - Inservice Inspection C. Kirshner, Quality Assurance Supervisor

F. Lipchick, Senior Licensing Supervisor

A. F. Mosso, Quality Assurance NDE Coordinator

T. P. Noonan, General Manager - NJclear Operations

R. A. Perry, Supervisor - NDE Services B. Sepelak, Licensing Engineer

W. H. Sikorski, Director - Inservice Inspection K. A. Troxler, Supervisor Inservice In;pection Services

U. S. Nuclear Regulatory Commission J. Beall, Senior Resident Inspector

P. Wilson, Resident Inspector

Denotes those present at the exit meeting.

  • 2.0 Scope of the Inspection Section XI, Rules for the Inservice Inspection of Nuclear Power Plant Components, of the ASME Boiler and Pressure Vessel Code provides rules for the examination, testing, and inspection of components and systems in a nuclear power plant.

Section XI mandates that tne plant owner develop a program which will demonstrate conformance to code requirements, and that the licensee perform inservice inspections (ISI) to comply with those requirements and program.

Examination of the steam generators is a special case of ISI and is governed by the Technical Specifications.

The following areas were selected for inspection:

- Inservice inspection program Implement;ng nondestructive examination (NDE) procedures

-

Personnel qualification / certification records

-

Steam generator eddy current inspection

-

- Review of secondary water chemistry Engineering Support to ISI

-

Quality assurance involvement with ISI

-

Erosion / Corrosion program

-

ISI data

-

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _

_ _ - _ _ _ -

___ _ _ _ _ _ _ -

_-.

--..

-

_-

<

.

,.

-3-

.

3.0' Review of NDE Implementing Procedures (7305)

-Inservice inspection at Beaver Valley Unit 2 is performed in accordance with the licensee's procedures.

Vendor NDE technicians are provided training on each procedure which they will be required to implement. The

"litensee is developing a program to require that its ISI vendor personnel

!

successfully pass a practical examination in the method which they will perform. A mockup has been fabricated for that purpose, and contains samples' for visual, penetrant, magnetic particle, and ultrasonic examination.

The inspector reviewed selected procedures to ascertain compliance with ASME code and regulatory requirements and for technical adequacy. The following procedures were selected for inspection:

Procedure No. IIT-303, Revision 7, " Ultrasonic Examir;ation of Piping

-

Systems and Components Less Than or Equal to Two Inches Wall Thickness" Procedure No. LP-101, Revision 7, " Solvent Removable Visible Dye"

-

The inspector determined that the aforementioned procedures complied with applicable' code and regulatory requirements.

Liquid penetrant procedure LP-101, Rev. 7 identifies that the useful temperature range is 40 F to 125 F.. The procedure qualification record confirms that the procedure

. as qualified within the specified temperature range using materials w

supplied by the three suppliers identified by the procedure.

Each procedure was found to be technically adequate for its intended use.

No violations were identified.

4.0 Inservice Inspection Data (73755, 73753)

Inservice inspection NDE drta were selected for inspection to ascertain that ASME Code and regulatory requirements were complied with.

Additionally, data were inspected to ascertain that the 10 year program, outage schedule and procedural requirements were complied with. Data representing the following were selected for inspection:

2 RHS-001-50, 12" diameter RHR system weld

-

- 2 CHS-PSR001, support on the Chemical Handling and Volume Control system.

- 2 CHS-PSR675X, support on the Chemical Handling and Volume Control system.

2 SIS-067-F04, if~ diameter Safety Injection system weld

-

_

_ _ _

_

__

_

_ _ -

)

a;

,

,~

.

..

_

.

-4-

.

2 RCS-025-8A, 2" diameter Hydrogenated Drain system weld i)

-

_

i

- 2 RCS-025-FM A, 2" diameter Hydrogenated Drain system weld j

2 DGS-001-1A, 2"' diameter Hydrogenated Drain system weld

-

-

.,

l The data verified that the examination methods, including visual, liquid

penetrant and ultrasonic examination, which were-specified by the 10 year.

program plan and the outage schedule, were performed on each-component as applicable.

Qualification / certification records of the NDE. technicians who' performed the. examinations were reviewed to ascertain that the technicians were properly qualified.

The records confirmed that those. personnel were certified to the proper level of qualification to perform their assigned task.

No violations were identified.

5.0 Steam Generator Inspection (73753)

Steam Generator tube examinations using the eddy current examination-method are mandated by the facility's technical specification. The examinations which were performed at Beaver Valley Unit 2 are the first inservice examinations since the facility commenced commercial. operation in' November 17, 1987.

Tubes in steam generators 2RCS-SG-21A (S/G A) and 2RCS-SG-21C (S/G C)

were examined during the 1989 refueling outage. The number of tubes which were examined and the extent of the examinations follows.

S/G "A" S/G "C" Bobbin coil, full length 627 646 Bobbin coil, tube end to the top of the 8th cold leg support 134 189

Rotating pancake coil, Row 1&2 U-Bends 187 188 Rotating pancake coil, hot leg tubesheet 150

-

8 X 1, hot leg tubesheet region 149

-

l One indication, 31% through wall,,sas identified in S/G

"A."

That indica-l tion, which was originally identified by the preservice eddy current examination, was located in the free span of tube R40 C27 between the 7th and 8th hot leg support plates.

I l

I

_ _ _ - -

--

- - - - - - -

!

._

._

_ _ __ - _

__ -

-

)

.

i

-

i

-

'

-5-No tubes were plugged as a result of the examinations.. Tubes at row 11, column-4 and row 9, column 33 in S/G C were each preventively plugged with a solid plug in the hot leg tube end, and a leak limiting plug in the cold leg tube end.

These tubes were replugged using the plug-in plug technique as a result of the reported failure of certain Westinghouse mechanical. plugs, which were the type of plug installed during the PSI of the Beaver Valley Unit 2 steam generators.

The examinations were performed-by Babcock and Wilcox Company (B&W), eddy

'

current examiners. The primary data analysis was performed by B&W and a secondary analysis was performed by ECHORAM, a subsidiary of Westinghouse.

The data analysis was governed by licensee. document ISI-GL-004, Revision 3 entitled Guideline for the analysis of Steam Generator Eddy Current Data.

The guideline was developed to establish consistency in the analytical process, and to ensure that the analyses were in compliance with licensee requirements. The guideline is applicable to all contractor analysts.

Certification records of the B&W personnel who were responsible for performing eddy. current examinations and for e.nalyzing the results were selected for inspection to ascertain that the personnel were properly qualified to perform those duties.

Four of the personnel were determined to be certified to Level II A, and a fifth individual was certified to Level III in the eddy current method. Additionally, the records confirmed that each examirer had been curre.itly examined for visual acuity.

Secondary water chemistry guidelines at Beaver Valley Unit 2 are based on all volatile treatment. The monitoring program identifies three action-levels to take remedial action when monitored parameters are observed and confirmed to be outside normal values, and to restore them to normal values in a timely manner.

No violations were identified.

l 6.0 Engineering Support to Inservice Inspection (73051)

The licensee's engineering department at Beaver Valley provides engineering l

support when an Engineering Memorandum (EM) is issued by the inservice inspection department.

The ISI Level III issues an EM when examination results are found to be rejectable per applicable acceptance criteria. The EM is distributed by QC, after the assignment of a unique number, to engineering where it is given to the proper group within the department.

The rejectable I

condition is evaluated and a disposition is provided.

During the outage a Rapid Response Team was established to expedite the processing of ems.

The inspector noted that dispositions were documented, in some cas.s, within one day of the issuance of the EM. The engineering evaluation disposition and corrective action provided was, in each instance, appropriate to the reported condition, and was technically adequate to return the component to an acceptable condition.

.

.

.

-

-

-

,,

-

.7

.:

-

,..?

-6-L j

'

The ISI department is responsible for tracking all engineering memoranda--

!

issued by.the department. An ISI engineer was made responsible for maintaining an EM log which showed the status of all memoranda issued by the department.- The licensee advised the inspector that the system was

- being revised to _ include ems on a computer tracking system which was expected to improve the tracking and reporting capability of the ISI

_

' department with~ regard to nonconforming items.

'

No violations were identified.

7.0 Quality Assurance Involvement in Inservice Inspection Activities (73051)

Surveillance of-Westinghouse and EBASCO ISI activities was performed by the licensee's QA NDE Coordinator during the course of the IR refueling outage. The'NDE coordinator also is certified'to Level III.

Ultrasonic equipment calibration was observed at the Westinghouse Waltz Mills facility in addition to the onsite activities of the two vendors.

The surveillance were performed to determine that NDE procedures were complied with, examination personnel were qualified to perform their as gned duties, and that examination results were properly documented.

-In addition to the QA surveillance of onsite ISI activities, the_ licensee used QA Audit No. OUTC 88-01 to place EBASCO Services, Inc. on its quali-fied vendors list. The EBASCO Quality Assurance Program was audited on May-2-13, 1988 by Public Service Company of Colorado QA Operations Depart-

_

ment at Fort St. Vrain, Unit 1.

The Public Service Company of Colorado ~

audit was used by Duquesne Light Company in lieu of performing its own-audit of EBASCO.

-

No violations were identified.

8.0 Secondary Side Erosion / Corrosion Program Concern regarding erosion and corrosion in balance'of plant piping i

systems has been heightened as a result of the December 9, 1986 feedwater

!

line rupture that.cccurred at Surry Unit 2.

This event was the subject.

.

of NRC Information Notice 86-106 issued on December 6, 1986, and a l

supplement issued on February 13, 1987.

The inspector reviewed the licensee's actions with regard to the

..

detection of erosion / corrosion in plant components. The inspection was j

conducted to determine the scope of the licensee's program and the l

results to date.

The licensee's erosion / corrosion program consists of selected portions of

!

single and two phase high energy systems. The following plant systems

)

are included in the program:

1

_ _ _ - _ _ - _ - _ _ _ _ _ - _ _ -

. _ - - _ _ _.

__

-

_ _ _ _.

-_.

..

_

-

- __. - - -

.

.

-. -

.....

-7-l..

I L

i-Condensate. System

-

Feedwater System

-

-- Feedwater Heater Vents and Drains Extraction Steam

-

Steam Generator Blowdown System

-

- Turbine and Condenser System

. Miscellaneous Drains Components in the program are ranked according to susceptibility.to attack by Erosion / Corrosion with the aid of the EPRI CHEC computer program, manual calculations based on accepted equations and relationships, industry and plant specific. experience and engineering judgement in combination with one or more of the aforementioned techniques.

Inspection guidelines are provided by document ES-M-009, Revision 0, entitled " Erosion / Corrosion Program for the Beaver Valley Power Stations Units 1 and 2,"' including grid marking used in the inspection of the identified component or fitting.

The specified grid size is based on the component diameter and ranges from a 1" grid for components up to 6" diameter, and a 3" grid for components greater than.1." diameter.

The evaluation of results includes a calculation of the design minimum.

wall thickness using an equation from Section 104.1.2 of ANSI B 31.1.0 1967.

The program defines acceptance criteria based on the calcu~ ated time-remaining for a component to reach the design minimum wall thickness.

Sample expansion guidelines are provided for cases when a component is judged to be unacceptable because of excessive wall loss due to erosion / corrosion.

The current refueling outage, IR, is the first time the program has been implemented at Unit 2, and the results are considered to be a baseline for future measurements.

Two elbows were replaced during the outage due to measured wall thickness less than the allowable minimum. The licensee plans to send the samples to an independent laboratory for analysis to determine the cause of the thinning. Additionally, mechanical measurements will be made to assess the accuracy of the ultrasonic thickness measurements which were made at the site.

]

No violations were identified.

9.0 Conclusions The licensee's control of its ISI program is enhanced by the use of its own implementing procedures. The training provided by the licensee to

vendor personnel allows the licensee to judge individual capability and l

'

to assure that the examination personnel are competent to perform their

.

_- _ _ _ _ _ _ _

-_

._-

I'

'

.

k

..W

-

8-

,

assigned duties. An added advantage is that the system allows the licensee to expeditiously revise a procedure when' that is necessary.

Inservice inspection data were complete and clearly documented. 'The licensee's Level III. reviews vendor data and signs each data sheet which is-subsequently submitted to the ANI for his review and approval.

The-In-Service Inspection Control system (ISIC), a computerized ISI data management system, is used for tracking program status and is evidence of-the licensee's_ commitment to maintaining a quality program.

l

'The Engineer'ng Memorandum system for requesting engineering support for ISI in use at Beaver Valley was found to be working, although it appeared that improvement was needed in the area of tracking and reporting. The licensee agreed with the inspector's assessment and initiated a revision of the system to accommodate computer tracking:to permit enhanced reporting capability.

Eddy current examination of steam generator tubes which was performed i

during the 1R refueling outage complied with Technical Specification -

requirements regarding sample size and content.

Examination personnel were qualified to perform the examinations and to analyze the results.

The system established by the licensee.to control the data analysis

. process provided-controls to minimize errors and missed calls by the analysts.

Quality. assurance coverage of inservice inspection activities is further evidence of the licensee's control of its vendor's activities. That was exhibited by the surveillance performed at a vendor's facility at Waltz Mills of activities which would affect onsite activities, and by the use j

of a certified Level III individual to perform the vendor surveillance.

l

10.0 Exit Meeting

'

The inspector met with licensee representatives (denoted-in paragraph 1)

at the conclusion of the inspection on May 19, 1989.

The inspector summarized the scope and findings of the inspection.

At no time during the inspection was written material provided by the inspector to the licensee.

The licensee did not indicate that proprietary information was involved within the scope of this

]

inspection.

.